GON - Under Study
S No | Project | Capacity (MW) | River | Latitiude N | Longitude E | VDC/District | Remarks | ||
---|---|---|---|---|---|---|---|---|---|
1 | Beni Kaligandaki | 50.000 | Kali Gandaki | 28o 18' 15" | 28o 22' 00" | 83o 33' 50" | 83o 36' 30" | Malika (Baglung) Ratnechaur,Jyamrukot,Dhatan,Arthunge (Myagdi) Mallaj,Salija,Dhairing (Parbat) | Feasibility Study started from FY 2071/72 |
2 | Bharbung HEP | 512.000 | Burbang | 28o 50' 45" | 28o 55' 45" | 83o 02' 30" | 83o 22' 15" | (Dolpa) | changed status to GON- Basket on 2073-12-08 |
3 | Bheri-2 HEP | 256.000 | Bheri | 28o 46' 45" | 28o 52' 00" | 82o 18' 45" | 82o 26' 40" | Khagenakot (Jajarkot) | changed status to GON- Basket on 2080-10-10 |
4 | Budhi Ganga | 20.000 | Budhi Ganga | 29o 15' 30" | 29o 18' 35" | 81o 14' 00" | 81o 17' 50" | Babala,Hatikot,Kushkot (Achham) Barhabise (Bajura) | Under construction with Kuwaiti and Saudi Funds by DOED |
5 | Budhi Ganga Small | 6.200 | Budhi Ganga | 29o 20' 30" | 29o 24' 00" | 81o 19' 15" | 81o 23' 45" | (Bajura) | Detailed Engineering Design started from FY 2072/73 |
6 | Chameliya | 60.000 | Chameliya Khola | 29o 51' 16" | 29o 54' 30" | 80o 53' 43" | 80o 57' 30" | (Darchula) | changed status to GON- Basket on 2074-09-14 |
7 | Chera 1 Storage HPP | 176.000 | Chera | 28o 43' 40" | 28o 48' 00" | 81o 58' 20" | 82o 06' 25" | ||
8 | Chhati Gad | 32.000 | Chhati Gad | 29o 48' 20" | 29o 50' 00" | 80o 53' 10" | 80o 55' 00" | Khandeswori (Darchula) | changed status to GON- Basket on 2080-10-10 |
9 | Chyadu Khola | 2.000 | Chyadu Khola | 27o 56' 10" | 27o 57' 47" | 86o 11' 11" | 86o 12' 27" | (Dolakha) | |
10 | Dadagau Khalanga Bheri HEP | 128.000 | Bheri | 28o 41' 25" | 28o 47' 20" | 82o 15' 00" | 82o 18' 44" | Khalanga,Dandagaun (Jajarkot) Aathbis Danda,Ghetma,Garayala,Purtim Kanda (Rukum) | changed status to GON- Basket on 2077-10-20 (Decision Date : 2076-03-17 Old Lic No 806 of Gezhouba Group Power Investment Nepal Pvt. Ltd.), coordinate change as per decision 2079-01-14 |
11 | Ghatganga Hydropower Project | 30.000 | Ghat Ganga | 29o 45' 36" | 29o 48' 32" | 81o 23' 52" | 81o 28' 03" | ||
12 | Ghunsa Khola | 78.000 | Ghunsa Khola | 27o 39' 30" | 27o 55' 25" | 87o 48' 20" | 88o 22' 15" | (Taplejung) | Detailed Engineering Study |
13 | Hadi Khola | 50.000 | Hadi Khola | 27o 54' 15" | 27o 56' 36" | 85o 37' 30" | 85o 41' 20" | ||
14 | Hima Nadi | 8.000 | Hima Nadi | 29o 23' 05" | 29o 25' 50" | 82o 01' 15" | 82o 05' 50" | ||
15 | Humla Karnali Hydropower Project | 62.000 | Karnali | 30o 03' 12" | 30o 06' 06" | 81o 31' 07" | 81o 36' 05" | Muchu (Humla) | |
16 | Humla Karnali-Cascade | 916.000 | Karnali | 29o 52' 48" | 30o 07' 15" | 81o 30' 00" | 81o 53' 26" | (Humla) | changed status from GON- Basket on 2077-10-20 |
17 | Inkhu | 21.100 | Inkhu | 27o 29' 15" | 27o 31' 42" | 86o 44' 00" | 86o 45' 45" | Baku (Solukhumbu) | Detail Engineering study is being conducted by DOED from fiscal year 2071/72 |
18 | Jugada Budhiganga HPP | 15.430 | Budhi Ganga | 29o 24' 00" | 29o 28' 30" | 81o 23' 45" | 81o 28' 27" | Budhiganga HPP has reserved this HPP | |
19 | Kaligandaki 2 Storage HEP | 477.000 | Kaligandaki | 27o 47' 04" | 27o 55' 40" | 83o 37' 20" | 84o 19' 24" | GoN Under Study as per decision date of 2077/10/20 and 2077/11/25 | |
20 | Kaligandaki Storage HEP | 844.000 | Kaligandaki | 28o 00' 00" | 28o 17' 30" | 83o 32' 00" | 83o 43' 30" | ||
21 | Kankai Multipurpose Project | 90.000 | Kankai | 26o 40' 30" | 26o 49' 36" | 87o 45' 49" | 87o 55' 42" | ||
22 | Karnali St-1 | 184.000 | Karnali | 29o 05' 00" | 29o 11' 28" | 81o 30' 00" | 81o 37' 40" | (Kalikot) | Feasibility Study started from FY 2072/73 |
23 | Khimti Shivalaya Storage HPP | 1720.000 | Khimti Khola | 27o 28' 28" | 27o 39' 23" | 86o 06' 00" | 86o 20' 15" | ||
24 | Kokhajor Storage HEP | 110.000 | Kokhajor Khola | 27o 15' 48" | 27o 22' 05" | 85o 25' 45" | 85o 37' 40" | Kapilakot,Mahendrajhayadi (Sindhuli) | |
25 | Kwadi Khola 1 | 15.000 | Kawadi Khola | 29o 41' 35" | 29o 44' 59" | 81o 41' 00" | 81o 45' 00" | ||
26 | Lohare River-1 Storage Hydropower Project | 81.000 | Lohare Khola | 28o 43' 13" | 28o 53' 41" | 81o 35' 00" | 81o 48' 09" | ||
27 | Lower Arun | 470.000 | Arun | 27o 21' 51" | 27o 30' 00" | 87o 07' 30" | 87o 12' 30" | (Sankhuwasabha) | EOI for Feasibilty Study started(Decision Date : 2071-06-22, Old Lic No 73 - Lower Arun HPL) |
28 | Lower Badigad Storage HEP | 350.000 | Badigad | 27o 57' 00" | 28o 11' 00" | 83o 16' 00" | 83o 29' 25" | GoN Under Study as per decision date of 2077/10/20 and 2077/11/25 | |
29 | Lower Chameliya | 19.280 | Chameliya Khola | 29o 40' 00" | 29o 41' 40" | 80o 34' 21" | 80o 37' 59" | (Darchula) | Feasibility Study started from FY 2071/72 |
30 | Lower Hongu Khola | 30.000 | Hongu Khola | 27o 27' 00" | 27o 28' 30" | 86o 43' 45" | 86o 46' 00" | (Solukhumbu) | Detailed Engineering Design started from FY 2071/72 |
31 | Lower Uttarganga HPP | 23.000 | Uttar Ganga | 28o 35' 00" | 28o 37' 40" | 82o 45' 14" | 82o 49' 15" | ||
32 | Machhapuchhre Modi HEP | 24.600 | Modi | 28o 29' 19" | 28o 30' 56" | 83o 53' 15" | 83o 55' 00" | Ghandruk,Lwangghale (Kaski) | changed status to GON- Basket on 2080-10-10 |
33 | Madi Siti | 86.000 | Madi Khola | 28o 10' 23" | 28o 13' 05" | 84o 08' 35" | 84o 14' 45" | (Lamjung) | changed status to GON- Basket on 2079-02-31 |
34 | Manahari Khola HPP | 80.000 | Manahari | 27o 32' 15" | 27o 36' 38" | 84o 51' 13" | 84o 55' 54" | ||
35 | Marshyangdi 3 HEP | 42.000 | Marshyangdi | 28o 05' 27" | 28o 08' 09" | 84o 25' 39" | 84o 27' 30" | GoN Under Study as per decision date of 2077/10/20 and 2077/11/25 | |
36 | Middle Inkhu Khola | 25.300 | Inkhu | 27o 31' 30" | 27o 34' 00" | 86o 45' 30" | 86o 47' 00" | (Solukhumbu) | Desk study by DOED from fiscal year 2073/74 |
37 | Mugu Karnali HEP | 100.000 | Mugu karnali | 29o 31' 21" | 29o 36' 06" | 82o 06' 46" | 82o 13' 45" | GoN Under Study as per decision date of 2077/10/20 and 2077/11/25, Cordinates in two portions(293306-293606, 820646-820836 and 293206-293606,820836-821345) | |
38 | Nagmati Reservoir HEP | 2.120 | Nagmati | 27o 45' 00" | 27o 47' 30" | 85o 25' 00" | 85o 27' 30" | Under Study : Ministry of Irrigation | |
39 | Naumure Storage Project | 377.000 | west rapti | 27o 46' 06" | 28o 00' 53" | 82o 45' 00" | 83o 02' 30" | Letter dated 2073-8-8 (ch no 643 study division) | |
40 | Saru Khola HPP | 15.000 | Saru Khola | 28o 45' 20" | 28o 51' 18" | 82o 03' 47" | 82o 10' 00" | Cordinate ammended as per 2074-07-23 decision | |
41 | Serpu Daha - Sani Bheri Nadi (PS) | 30.100 | Sani Bheri | 28o 40' 00" | 28o 42' 30" | 82o 28' 24" | 82o 30' 00" | (Rukum) | changed status to GON- Basket on 2079-02-31 |
42 | Sharada Babai Storage HPP | 93.000 | Sharada | 28o 15' 00" | 28o 20' 00" | 82o 00' 00" | 82o 07' 30" | ||
43 | SR-06 Storage | 276.000 | West Seti | 28o 58' 00" | 29o 16' 00" | 80o 55' 30" | 81o 12' 30" | Feasibility Study by DOED | |
44 | Super Budhigandaki HEP | 52.000 | Budhigandaki | 28o 33' 30" | 28o 35' 00" | 84o 41' 15" | 84o 45' 00" | Samagaun (Gorkha) | changed status to GON- Basket on 2077-10-20 (Decision Date : 2076-10-17 Old Lic No 929 of Natural Hydro Nepal Pvt. Ltd), West coordinates amended from 844150 to 844115, Decision date:2079-03-02 |
45 | Surnayagad Storage HPP | 38.000 | Surnaya Gad | 29o 18' 40" | 29o 23' 35" | 80o 19' 10" | 80o 28' 00" | ||
46 | Syar Khola HEP | 59.500 | Syar | 28o 27' 40" | 28o 29' 29" | 84o 57' 35" | 85o 02' 50" | Chhaikampar,Chunchet (Gorkha) | changed status to GON- Basket on 2079-02-31 |
47 | Tila HEP | 35.000 | Tila | 29o 09' 39" | 29o 12' 07" | 81o 52' 00" | 81o 54' 49" | Survey area amended from 290939.6N to 291206.78 N and from 815200 E to 815448.59 E , Decision Date: 2080-04-03 | |
48 | Tom Dogar(Budhigandaki) HEP | 43.520 | Budhigandaki | 28o 29' 16" | 28o 30' 37" | 84o 50' 52" | 84o 52' 40" | GoN Under Study as per decision date of 2077/10/20 and 2077/11/25 | |
49 | Upper Arun | 335.000 | Arun | 27o 38' 24" | 27o 48' 09" | 87o 20' 00" | 87o 30' 00" | Chepuwa,Hatiya (Sankhuwasabha) | being studied by NEA under IDA assistance |
50 | Upper Hongu HEP | 38.000 | Hongu | 27o 34' 40" | 27o 36' 42" | 86o 53' 39" | 86o 55' 22" | GoN Under Study as per decision date of 2077/10/20 and 2077/11/25 | |
51 | Upper Jhimruk Storage Project | 100.000 | Jhimruk | 28o 07' 30" | 28o 12' 30" | 82o 52' 30" | 83o 00' 00" | As per Letter dated 2073-08-08 (Ch no 642, study division) | |
52 | Upper Karnali B | 60.000 | Karnali | 28o 57' 30" | 29o 05' 32" | 81o 24' 02" | 81o 30' 00" | changed status to GON- Basket on 2080-10-10 | |
53 | Upper Khudi-A HPP | 27.400 | Khudi | 28o 21' 50" | 28o 24' 27" | 84o 16' 43" | 84o 19' 36" | Ghanpokhara,Khudi (Lamjung) | Feasibility Study started from FY 2071/72, Coordinate amended as per 2073-8-8, study division. |
54 | Upper Lotikarnali | 35.000 | Karnali | 29o 49' 35" | 29o 50' 52" | 82o 06' 23" | 82o 11' 22" | Mimi (Humla) | changed status to GON- Basket on 2080-10-10 |
55 | West Seti Storage HPP | 750.000 | West Seti | 29o 16' 00" | 29o 28' 50" | 80o 45' 00" | 80o 57' 30" | Dhungad,Thalakanda (Baitadi) Sunkuda (Bajhang) Belapur (Dadeldhura) Lamikhal (Doti) | Coordinate Decision Date: 2079-06-26 (Processing Under IBN) |
56 | Yanma Khola | 64.000 | Yangma Khola | 27o 39' 00" | 27o 41' 31" | 87o 47' 52" | 87o 50' 00" | (Taplejung) | changed status to GON- Basket on 2074-09-14 (Area revised decision date 2076-11-30) |