Power plants for Generation
S No | Project | Capacity (MW) | Lic No | Isuue Date | Validity | Promoter | Address | Latitiude N | Longitude E | VDC/District | C O D | Remarks | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Solar Energy | 0.680 | 2067-12-10 | 0000-00-00 | Katthmandu Upatyaka Khanepani Byawasthapan Board | Tripureswor, Kathmandu | 00o 00' 00" | 00o 00' 00" | 00o 00' 00" | 00o 00' 00" | Bungamati (Lalitpur) | 2067-12-10 | Survey Lic No: Date: 2067-12-10 | |
2 | Bishnu Priya Solar Farm Project | 1.000 | 2073-09-27 | 0000-00-00 | Surya Power Company P. Ltd. | 227 Gyanodaya Marg Bafal, PO No. 6836, Kathmandu, 9851176527,4288388 | 27o 33' 10" | 27o 33' 20" | 83o 41' 09" | 83o 41' 17" | Ramnagar (Nawalparasi) | 2075-08-13 | Survey Lic No: Date: 2072-07-11; COD on 2075-08-12; Capacity of 960kW mentioned in NEA records | |
3 | Grid-Connected Solar Power Project, Butwal , 33 kV S/S | 8.500 | 260 | 2076-02-14 | 2101-02-13 | Ridi Power Company Ltd. | Trade Tower Thapathali, KTM-11, Ph- 01-5111015, Fax-01-511016,Mo-9801147130 | 27o 37' 42" | 27o 38' 08" | 83o 27' 05" | 83o 27' 23" | Butawal N.P. (Rupandehi) | 2077-07-15 | Survey Lic No: 757 Date: 2073-08-14 |
4 | Bel Chautara Solar Farm Project | 5.000 | 267 | 2076-03-18 | 2101-03-17 | Solar Farm Pvt. Ltd. | Basundhara-3, Ktm. P.O.Box NO. 21498, Aash Bahadur Gurung Mob. NO. 9851046006 | 28o 01' 50" | 28o 02' 06" | 84o 04' 51" | 84o 05' 05" | Khairenitar (Tanahu) | 2078-07-01 | Survey Lic No: 781 Date: 2073-10-11; Suklagandaki Municipality, Gandaki Pradesh; COD on 2078-07-01 as informed by NEA |
5 | Mithila Solar PV Power Project, Dhanusa | 10.000 | 270 | 2076-05-06 | 2101-05-05 | Eco Power Development Pvt. Ltd | Bakhundole, Lalitpur | 26o 56' 05" | 26o 56' 23" | 85o 56' 24" | 85o 56' 46" | Begadawar (Dhanusha) | 2077-11-22 | Survey Lic No: 949 Date: 2074-08-05; Mithila Municipality, Dhanusha |
6 | Som Radha Krishna Solar Farm Project (VGF) | 4.400 | 274 | 2076-07-14 | 2101-07-13 | Nepal Solar Farm Ltd. | Bafal, Kathmandu | 28o 08' 55" | 28o 09' 02" | 84o 07' 44" | 84o 07' 50" | Rupakot (Kaski) | 2079-07-14 | Survey Lic No: 1067 Date: 2075-11-14; COD on 2079-07-14; details received from NEA; Installed capacity in NEA record is 4MW |
7 | Solar PV Pratappur, Grid Connected Solar PV (VGF), Nawalpara | 5.000 | 281 | 2076-09-11 | 2101-09-10 | National Solar Power Company PVt. Ltd. | Lalitpur-13; 5275070; nspc@gmail.com | 27o 24' 49" | 27o 24' 55" | 83o 48' 33" | 83o 49' 03" | Pratappur (Nawalparasi) | 2079-05-27 | Survey Lic No: 1041 Date: 2075-06-29; COD on 2079-05-27; details received from NEA |
8 | Chandranigahpur Solar Project | 4.000 | 287 | 2076-10-01 | 2101-09-29 | Api Power Company Pvt. Ltd | Thapathali 11, Kathmandu. Ph : 9851033646 | 27o 07' 12" | 27o 07' 20" | 85o 22' 17" | 85o 22' 29" | Chandranigahapur (Rautahat) | 2078-05-06 | Survey Lic No: 758 Date: 2073-08-14; Coordinates proposed in Generation Application are different from the provided in Survey License. |
9 | Grid Connected Solar PV Project, Ramgram, Nawalparasi | 2.000 | 317 | 2077-06-11 | 2102-06-10 | Saurya Bidhyut Power Pvt. Ltd | Kathmandu- 1, Narayanchaur Naxal; POB 6633; PN: 4444555, 4432411; Email:prabhakhar@himelectronics.com, Fax: 4432406 | 27o 33' 15" | 27o 33' 20" | 83o 41' 24" | 83o 41' 36" | 2080-01-02 | Survey Lic No: 1036 Date: 2075-06-09; COD on 2080-01-02, details received from NEA | |
10 | Utility Scale Solar PV, Grid Connected Solar Project, Morang | 6.800 | 324 | 2077-07-06 | 2102-07-05 | G I Solar Pvt. Ltd, | La. Ma. Na. Pa-1,Kopundole, 015522769, 9851023732 | 26o 33' 04" | 26o 33' 18" | 87o 17' 27" | 87o 17' 40" | Banigama (Morang) | 2079-12-30 | Survey Lic No: 981 Date: 2074-11-06; COD on 2079-12-30; details received from NEA |
11 | Solar PV Project Banke, block-2 | 10.000 | 332 | 2077-08-29 | 2102-08-28 | Pure Energy Ltd | Redcross Marga, Solteemode, Kathmandu-13, PH 01-4241853, Mob. 9808372189, 9801011278 | 28o 09' 29" | 28o 10' 01" | 81o 34' 50" | 81o 35' 10" | Raniyapur (Banke) | 2080-01-18 | Survey Lic No: 1033 Date: 2075-05-24; COD: 2080-01-18 |
12 | Solar PV Project, Raniyapur, Block 1 | 10.000 | 333 | 2077-09-02 | 2102-09-01 | Pure Energy Ltd | Redcross Marga, Solteemode, Kathmandu; PH 01-4241853, Mob. 9801011278, 9851132321 | 28o 10' 38" | 28o 10' 57" | 81o 35' 21" | 81o 35' 46" | Raniyapur (Banke) | 2080-09-25 | Survey Lic No: 1032 Date: 2075-05-24 |
13 | Solar Power Project, Dhalkebar 11 kV S/S | 1.000 | NA | 2077-12-30 | 2102-12-30 | Api Power Company Ltd. | Trade Tower 4th Floor,Thapathali, KTM, Ph- 01-5111093, Mo-9801147071 | 26o 55' 12" | 26o 55' 38" | 85o 56' 38" | 85o 56' 56" | Dhalkebar (Dhanusha) | 2078-10-02 | Survey Lic No: Date: 2073-08-14; COD on 2078-10-02; details received from NEA; License number not available during entry of COD |