Survey License for Generation (More than 1 MW)
S No | Project | Capacity (MW) | River | Lic No | Isuue Date | Validity | Promoter | Address | Latitiude N | Longitude E | VDC/District | Remarks | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Upper Karnali HEP | 900.000 | Karnali | 328 | 2065-02-05 | 2069-08-04 | GMR, Upper Karnali Hydropower Limited | Chakupat Lalitpur - 10 Contact No. 01-5526464 | 28o 42' 00" | 28o 58' 20" | 81o 25' 00" | 81o 35' 30" | Rahaph, ,Bhairabsthan (Achham) Santalla,Khadkawada,Naule Katuwal,Nepa,Lyati Bindraseni (Dailekh) Chapre,Pokharikanda,Salkot (Surkhet) | Under Nepal Investment Board |
2 | Tamor Storage | 200.000 | Tamor | 666 | 2070-04-16 | 2074-04-15 | Nepal Electricity Authority | Ratnapark, kathmandu | 27o 02' 04" | 27o 13' 30" | 87o 31' 27" | 87o 45' 27" | Panchami,Phidim,Sumang,Yasok,Syangrumba,Rani Gaun,Ambarpur,Bharapa (Panchthar) Nidhuradin,Phulbari,Hangpang,Phungling,Dokhu,Thechambu,Nankholyang,Chaksibote (Taplejung) Chhate Dhunga,Hawaku,Ewa,Myaglung,Okhare,Tamfula,Simle,Chuhandanda,Thoklung (Terhathum) | |
3 | Aayu Chhatigad HEP | 13.942 | Chatti Gad | 798 | 2073-12-21 | 2076-12-20 | Puwa Khola-1 Hydro Power Pvt.Ltd. | Anamnagar-32,Kathmandu,Nepal. GPO 20863, 4102710, Kadam KC 9851159634 | 29o 48' 50" | 29o 49' 35" | 80o 52' 37" | 80o 53' 10" | Khandeswori (Darchula) | |
4 | Mathillo Langtang HEP | 24.350 | Langtang | 973 | 2074-09-21 | 2079-09-20 | Yeti Langtang Energy Pvt. Ltd | Yeti Building, Tilganga Ringroad, Kathmandu | 28o 12' 03" | 28o 12' 56" | 85o 30' 01" | 85o 34' 21" | Langtang (Rasuwa) | |
5 | Ghunsa Khola HEP | 155.820 | Ghunsa khola | 991 | 2074-12-13 | 2079-12-12 | RM Investment Company Pvt. Ltd. | New Baneshor, Ktm, Nepal, Ph. No. 4781891 | 27o 34' 00" | 27o 39' 30" | 87o 50' 35" | 87o 56' 30" | Lelep,Tapethok (Taplejung) | License Renewed for last year of 5 years period (up to 2079-12-12)=> Decision Date: 2079-08-27 |
6 | Upper Barunkhola HEP | 109.500 | Barun | 994 | 2074-12-25 | 2079-12-24 | Great Hydropower Pvt. Ltd | Kathmanu | 27o 42' 50" | 27o 44' 10" | 87o 12' 35" | 87o 18' 06" | Makalu (Sankhuwasabha) | License Renewed for last year of 5 years period (up to 2079-12-24)=> Decision Date: 2079-07-15 |
7 | Mugu Khola HEP | 57.000 | Mugu | 1063 | 2075-10-07 | 2080-10-06 | Westar Energy Pvt. Ltd | Kathmandu-11, 01-4224308 | 29o 35' 27" | 29o 38' 45" | 82o 25' 55" | 82o 30' 46" | Kimari,Dolphu,Mugu,Pulu (Mugu) | (i) License Renewed for last year of 5 years period (up to 2080-10-06)=> Decision Date: 2079-11-15 (ii) East boundary amended from 823115E to 823046E, Decision date: 2080-04-09 |
8 | Saldim Khola HEP | 45.000 | Saldim | 1073 | 2076-01-19 | 2079-01-18 | Ludhiana Holding Energy Nepal, Pvy. Ltd | Tokha- 7, Kathmandu | 27o 43' 00" | 27o 47' 00" | 87o 15' 00" | 87o 18' 27" | Makalu (Sankhuwasabha) | |
9 | Upper Chuwa Lurupya Khola PRoR HEP | 110.200 | Chuwa, Lurupya | 1113 | 2076-08-29 | 2081-08-28 | Nepal Portfoliyo Energy Pvt. Ltd | Ka.Ma.Na.Pa-10, Kathmandu | 29o 55' 50" | 29o 59' 00" | 81o 55' 52" | 81o 58' 50" | Kharpunath,Thechaya (Humla) | (i) Amend west boundary from 815605 to 815552 and capacity from 103 MW to 110.2 MW, decision date: 2080-03-19 (ii) License Renewed for last fifth year (up to 2081-08-28) and project name changed to Upper Chuwa Lurupya Khola PRoR Hpp => Dec |
10 | Api Naugad HEP | 4.840 | Naugad | 1114 | 2076-09-22 | 2081-09-21 | Mid Alpine Hydropower Pvt. Ltd. | Thasikhel, Lalitpur, 01-5193357, malpinehydro@gmail.com | 29o 48' 40" | 29o 49' 35" | 80o 40' 00" | 80o 41' 03" | Dhuligada (Darchula) | License renewed for last year (up to 2081-09-21), Decision Date:2081-03-17 |
11 | Mathillo Bhurundi hEP | 3.750 | Bhurundi | 1118 | 2076-10-24 | 2078-10-23 | Ambe Hydropower Pvt. Ltd. | Tinkkune, Kathmandu, 01-4117979 ambehydro9@gmail.com | 28o 19' 30" | 28o 20' 35" | 83o 44' 20" | 83o 45' 00" | Dangsing (Kaski) | |
12 | Middle Ghunsa HEP | 30.240 | Ghunsa | 1122 | 2076-12-03 | 2081-12-02 | Atlas Energy Pvt. Ltd | Ka.Ma.Pa-3, 01-4003050, 4003060 | 27o 33' 23" | 27o 34' 00" | 87o 51' 18" | 87o 52' 52" | Lelep,Tapethok (Taplejung) | (i) License Renewed for fifth year (upto 2081-12-02) => Decision Date: 2081-01-03 (ii) capacity amended from 21.1 to 30.24 and west boundary amended from 875138 to 875118, decision |
13 | Mathillo Chhumchhum Gad Hydropower Project | 10.000 | Chhumchhum gad | 1128 | 2077-03-22 | 2081-03-21 | Western Himalayan Power Private Limited | KMC-05, Kathmandu | 29o 48' 31" | 29o 49' 47" | 80o 49' 38" | 80o 50' 42" | Ghusa (Darchula) | (i) Survey License renewed for fourth year (i.e. up to 2081-03-21), Decision Date:2080-04-11(ii) Survey License transferred from Hydro Vision Company Private Limited to Western Himalayan Power Private Limited, Decision Date:2080-06-30 |
14 | Jagdulla A HEP | 120.600 | Bheri, Phedi Khola | 1129 | 2077-03-28 | 2081-03-27 | Jagdulla HydropowerCompany Limited | BPC Building, Rudramati Marga BUddhanagar, Kathmandu 01-4788680 | 28o 57' 34" | 29o 04' 22" | 82o 30' 54" | 82o 36' 00" | Kalika,Narku (Dolpa) Bhagawati Tol (Jajarkot) | License Renewed for fourth year (up to 2081-03-27), Capacity amended from 82.3 MW to 120.6 MW (6 hrs, PRoR) and Boundary amended to 285734N to 290422N & 823054E to 823600E=> Decision Date: 2080-05-15 |
15 | Lower Nwagad Small HPP | 2.000 | Nwa Gad | 1132 | 2077-04-14 | 2081-04-13 | Gwallek Power Pvt. Ltd. | 4th Floor, Trade Tower Nepal, Thapathali - 11, Kathmandu | 29o 44' 44" | 29o 45' 04" | 80o 47' 43" | 80o 48' 31" | Guljar,Latinath (Darchula) | (i) License Renewed for fourth year (up to 2081-04-13)=> Decision Date: 2080-07-14 (ii) Ownership of survey license transferred from Hydro Vision Company Pvt ltd to Gwallek Power Private Limited, Decision Date: 2080-10-05 |
16 | Dudhkoshi V HEP | 110.000 | Dudhkoshi | 1141 | 2077-07-23 | 2081-07-22 | Independent Power Company (Nepal) Pvt. Ltd. | Central Business park 2nd floor, Thapathali , Kathmandu Contact no.: 01-4264823/01-4264197 email: dudhkoshi5@gmail.com | 27o 29' 46" | 27o 33' 30" | 86o 40' 00" | 86o 43' 37" | Basa,Baku (Solukhumbu) | Survey license renewed for fourth year (i.e. up to 2081-07-22), Decision Date: 2080-08-25 |
17 | Chadaha Khola HEP | 4.500 | Chadaha | 1144 | 2077-11-05 | 2081-11-04 | Chandaha Hydropower Pvt. Ltd | Kamlamai -10, Kavrepalanchowk, email: chandahahydropower@gmal.com, contact No.: 9854041690( Biraj Sharma) | 27o 05' 48" | 27o 08' 45" | 86o 00' 48" | 86o 02' 30" | (i) License renewed for fourth year (up to 2081-11-04), decision date: 2080-12-15 (ii) Capacity amended from 4.95 MW to 4.5 MW, Decision date: 2081-03-21 | |
18 | Lower Arun Hydropower Project | 679.000 | Arun | Sa.A. 003/2077/78 | 2078-03-27 | 2080-03-26 | SJVN Limited India | Shakti Sadan, Corporate Office Complex, Shanan, Shimla- 171006, Himachal Pradesh India. Phone: +91-11-61901801 | 27o 21' 51" | 27o 30' 00" | 87o 07' 30" | 87o 12' 30" | License issued by the office of Investment Board of Nepal (OIBN) | |
19 | Sirsagad Small HEP | 2.500 | Sirsagad | 1151 | 2078-04-08 | 2082-04-07 | Durgathali Power Company Pvt. Ltd | Bhimdutta Municipality, Ward no.: 6, Kanchanpur Contact No. 9868429797 | 29o 09' 11" | 29o 10' 52" | 80o 20' 35" | 80o 21' 59" | Sirsha (Dadeldhura) | (i) Capacity amended from 4.3 MW to 2.5 MW, Decision Date: 2081-05-20 (ii) License renewed for fourth year (up to 2082-04-07), Decision Date: 2081-05-20 |
20 | Arun 4 PRoR HEP | 490.200 | Arun | 1153 | 2078-07-07 | 2081-07-06 | Nepal Electricity Authority | Durbar Marg , Kathmandu | 27o 35' 00" | 27o 40' 18" | 87o 18' 15" | 87o 22' 45" | Makalu (Sankhuwasabha) | License Renewed for third year period (up to 2081-07-06)=> Decision Date: 2080-08-06 |
21 | Upper Chhujung HEP | 50.500 | Chujung | 1154 | 2078-07-15 | 2081-07-14 | White Flower Company Pvt. Ltd | Kathmandu-10 | 27o 44' 30" | 27o 46' 00" | 87o 30' 09" | 87o 33' 14" | Chepuwa (Sankhuwasabha) | (i) Capacity amended from 16.8 MW to 40.7 MW, Saidantik Sahamati for RoR TO PRoR amendment & Coordinates amended to 274430 N to 274600 N and 873009 E to 873250 E, Decision Date: 2079-01-05 (ii) Amendment from 40.7MW to 50.5MW, add bumari kh |
22 | Induwa Khola PRoR HEP | 24.921 | Induwa | 1160 | 2078-07-29 | 2081-07-28 | Vision Tesla Power Pvt. Ltd. | Kathmandu-3, Contact no.: 9851147060 | 27o 30' 46" | 27o 33' 29" | 87o 19' 07" | 87o 23' 05" | Num (Sankhuwasabha) | Survey License Renewed third year (up to 2081-07-28)=> Decision Date: 2080-10-08 |
23 | Super Palung HEP | 5.000 | Palun Khola | 1163 | 2078-08-02 | 2081-08-01 | Prakash Solution Company | Budhanilkantha-2, Kathmandu, Contact No.: 9851029813 | 27o 35' 53" | 27o 37' 54" | 87o 38' 38" | 87o 40' 45" | Papung (Taplejung) | License Renewed for third year (up to 2081-08-01)=> Decision Date: 2080-09-08 |
24 | Ranma Khola HPP | 30.200 | Ranma | 1167 | 2078-08-23 | 2081-08-22 | Dhorpatan Ranma Hydropower pvt. ltd. | Mahalaxmi- 4, lalitpur, 9851215578 | 28o 41' 00" | 28o 43' 07" | 82o 50' 00" | 82o 52' 25" | Ranmamekot (Rukum) | Survey License renewed for third year (up to 2081-08-22), Decision Date: 2080-09-20 |
25 | Isuwa Cascade-3 | 9.950 | Isuwa Khola | 1169 | 2078-09-14 | 2081-09-13 | Magic Arun Hydropower p.Ltd. | Kathamandu-05,9852099550 | 27o 28' 30" | 27o 31' 07" | 87o 08' 00" | 87o 12' 27" | Survey License Renewed for third year (up to 2081-09-13)=> Decision Date: 2081-01-12 | |
26 | Pikhuwa Khola HPP | 6.700 | Pikhuwa | 1171 | 2078-09-27 | 2081-09-26 | Aspire Power Company Pvt. Ltd. | Ka.Ma.Pa-10, 9851140280, email: aspirepower.company@gmail.com | 27o 10' 34" | 27o 12' 08" | 86o 59' 25" | 87o 01' 00" | License Renewed for third year (up to 2081-09-26)=> Decision Date: 2080-10-19 | |
27 | Sani Bheri 3 PRoR Cascade HEP | 30.000 | Sani Bheri | 1175 | 2078-10-10 | 2081-10-09 | Sani Bheri Hydropower Company Pvt. Ltd | Kathmandu, Nepal, Contact No. 985118051 | 28o 39' 09" | 28o 40' 38" | 82o 26' 31" | 82o 29' 48" | Musikot Khalanga (Rukum) | Survey License renewed for third year (up to 2081-10-09), Decision Date: 2080-11-04 |
28 | Upper Taksu Small HEP | 6.300 | Taksu | 1176 | 2078-10-12 | 2081-10-11 | Veritas Energy Pvt. Ltd | Kathmandu, Contact no.: 014221202, email: veritasnpl@gmail.com | 28o 53' 53" | 28o 55' 23" | 82o 26' 18" | 82o 26' 50" | Ragda (Jajarkot) | Amend resource as Dar Khola and Ragaya Khola (tributaries of Taksu Khola), capacity as 6.3 MW from 4.9 MW and scheme as PRoR type, decision date: 2079-11-15 |
29 | Super Irkhuwa Khola HEP | 5.000 | Irkhuwa Khola | 1179 | 2078-10-23 | 2080-10-22 | Bhojpur Siwalaya Power Pvt. Ltd | Kathmandu-32, Jadibuti, Nepal, Contact No.: 9851187011, 9865660888 | 27o 24' 05" | 27o 25' 16" | 86o 55' 59" | 86o 58' 24" | Dobhane (Bhojpur) | |
30 | Super Seti Hydropower Project | 46.000 | Seti | 1182 | 2078-11-06 | 2081-11-05 | Sun Star Energy Pvt. Ltd. | Tinkune, Kathmandu, Phone No. 9851243683 | 29o 50' 25" | 29o 52' 00" | 81o 11' 50" | 81o 15' 00" | (i) 2.1 hour-peaking (DD: 2080-02-23) (ii) Capacity amended from 40 MW to 46 MW, Decision Date: 2080-04-22 | |
31 | Super Humla Karnali Nadi HEP | 152.725 | Humla Karnali | 1189 | 2078-11-18 | 2081-11-17 | Gandaki Energy Limited | Bluestar Complex,Tripureshwor, Contact No.: 01-4101140, 4251080 | 30o 07' 17" | 30o 11' 30" | 81o 25' 30" | 81o 32' 16" | Muchu,Limi (Humla) | License Renewed for third year (up to 2081-11-17) => Decision Date: 2081-05-21 |
32 | Rudrawati Badigaad Hydropower Project | 9.600 | Badigad | 1193 | 2079-01-07 | 2082-01-06 | Hanumante Power and Energy Pvt.Ltd. | Kathamandu-32,Pepsikola, Ph no.5906214 | 28o 12' 33" | 28o 13' 25" | 83o 14' 05" | 83o 15' 40" | Capacity amended from 9.06 MW to 9.60 MW with 2 hours of Peaking Period and West boundary amended from 831415 E to 831405 and North boundary amended from 281320N to 281325N, Decision Date: 2080-05-15 | |
33 | Lagan Khola (Bramhayani - A) HEP | 9.700 | Lagan | 1194 | 2079-01-11 | 2082-01-10 | Integrated Hydrofund Nepal Pvt. Ltd | Budhhanagar-10, Kathmandu. | 28o 04' 17" | 28o 06' 13" | 85o 44' 22" | 85o 45' 17" | Golche,Gumba (Sindhupalchok) | Survey License renewed for third year (up to 2082-01-10), Decision Date: 2081-02-22 |
34 | Tejo Thogam Khola HPP | 29.000 | Tejo, Thogam | 1196 | 2079-01-12 | 2082-01-11 | Snowfall Hydropower Pvt. Ltd. | Ka. Ma.Pa. -5, 9803590343 | 27o 44' 00" | 27o 47' 00" | 87o 19' 00" | 87o 21' 21" | Hatiya (Sankhuwasabha) | License Renewed for third year (up to 2082-01-11)=> Decision Date: 2081-02-09 |
35 | Likhu Khola HEP | 36.000 | Likhu | 1200 | 2079-01-26 | 2081-01-25 | Ujyalo Energy Solution Pvt. Ltd | Ka.Ma.Pa-2, Gairidhara, kathmandu Contact No.: 9851029813 | 27o 15' 34" | 27o 20' 57" | 86o 12' 14" | 86o 15' 50" | Palapu (Okhaldhunga) | Capacity amended from 42.3 MW to 36 MW, Scheme changed to PRoR, west boundary changed from 861240 to 861214 and north boundary changed from 272000 to 272057, Decision Date: 2079-12-20 |
36 | Kabeli-3 Hydropower Project | 9.850 | Kabeli | 1201 | 2079-01-27 | 2082-01-26 | Kabeli Hydropower Company Limited | Ka.Ma.Pa- 28, Kathmandu, email: kabeli.hydro5@gmail.com | 27o 21' 41" | 27o 22' 53" | 87o 50' 58" | 87o 53' 24" | Tellok,Paidang (Taplejung) | Capacity amended to 9.85 MW and Project name changed from |
37 | Super Dona Khola HEP | 42.750 | Dona Khola | 1202 | 2079-02-17 | 2082-02-16 | Dona Lake Hydropower Private Limited | Ram Mandir Marg, KMC - 9, Old Baneshwor (01-5351037,4589051) | 28o 30' 40" | 28o 32' 15" | 84o 24' 20" | 84o 28' 10" | Dharapani,Thoche (Manang) | License renewed for third year, resource of Ongre Khola is added, capacity amended from 9 MW to 42.75 MW and west boundary amended from 842551 to 842420 E, Decision date:2081-04-02 |
38 | Budhigandaki Prok-1 HEP | 93.000 | Budhi Gandaki | 1203 | 2079-03-15 | 2082-03-14 | Chilime Hydropower Company Limited | Dhumbarahi, Kathmandu | 28o 31' 10" | 28o 33' 47" | 84o 45' 00" | 84o 48' 35" | Prok (Gorkha) | Survey License renewed for third year (i.e. up to 2082-03-14), Decision Date: 2081-03-25 |
39 | Malumela - Seti Nadi PRoR Hydropower Project | 72.000 | Seti Nadi | 1204 | 2079-03-22 | 2082-03-21 | Gopal Datta Pandey | Dasharatha Chand Municipality, Ward No-4, Baitadi | 29o 28' 19" | 29o 30' 29" | 81o 01' 31" | 81o 07' 50" | Chainpur (Bajhang) | (i) East boundary amended from 810735 E to 810750 E,West boundary amended from 810151 E to 810131 E and capacity amended from 64 MW to 72 MW, Decision Date: 2081-01-04 (i) Survey License renewed for third year, Decision Date: 2081-05-21 |
40 | Mathillo Pelma Khola Hydroelectric project | 24.800 | Pelma Khola | 1206 | 2079-03-30 | 2082-03-29 | Units Energy Pvt. Ltd | Kupandole,Lalitpur,9841300881 | 28o 40' 08" | 28o 42' 17" | 82o 56' 51" | 82o 58' 00" | Survey License renewed for third year (up to 2082-03-29), Decision Date: 2081-07-02 | |
41 | Mathillo Maya Khola Hydropower Project | 5.000 | Maya Khola | 1209 | 2079-04-08 | 2082-04-07 | Waleng Tumhok Hydro Power Pvt. Ltd. | Anamnagar-32, Kathmandu | 27o 13' 21" | 27o 14' 03" | 87o 22' 26" | 87o 24' 01" | Madi Mulkharka,Tamfok (Sankhuwasabha) | License Renewed for third year (up to 2082-04-07)=> Decision Date: 2081-05-20 |
42 | Lungri khola PROR HPP | 22.000 | Lungri Khola | 1213 | 2079-04-10 | 2082-04-09 | Tripura Sundari hydro energy pvt. ltd. | Budhanilkantha Municipality 9, Kathmandu | 28o 11' 33" | 28o 14' 52" | 82o 41' 08" | 82o 44' 13" | Swargadwarikhal (Pyuthan) | Survey License renewed for third year (up to 2082-04-09), Decision Date: 2081-06-16 |
43 | Marsyangdi River PRoR Hydropower Project | 90.000 | Marsyangdi | 1218 | 2079-05-08 | 2082-05-07 | M.A. Power Pvt. Ltd. | Kantipath, Kathmandu, 9851026244 | 27o 56' 55" | 28o 05' 25" | 84o 25' 00" | 84o 29' 00" | Palungtar (Gorkha) Bhanu (Tanahu) | (i) Capacity amended from 99.8 MW to 90 MW, Decision Date: 2081-03-30 (ii) Survey License renewed for third year, Decision Date:2081-05-17 |
44 | Pelma Khola PRoR HPP | 40.000 | Pelma | 1221 | 2079-06-14 | 2081-06-13 | Pelma Hydropower Project Pvt. Ltd. | Ghattekulo-29, Kathmandu, Contact No.; 9851030667 | 28o 37' 41" | 28o 41' 37" | 82o 52' 30" | 82o 56' 49" | Hukam,Ranmamekot (Rukum) | |
45 | Upper Sani Bheri PRoR HEP | 60.000 | Pelma | 1222 | 2079-06-14 | 2081-06-13 | Pelma Hydropower Project Pvt. Ltd. | Ghattekulo-29, Kathmandu, Contact No.; 9851030667 | 28o 37' 41" | 28o 41' 37" | 82o 45' 00" | 82o 52' 29" | Ranmamekot,Hukam (Rukum) | |
46 | West Seti Hydropower Project | 750.000 | West Seti | Sa. Aa. 005/2079/80 | 2079-07-03 | 2081-07-02 | NHPC Limited | NHPC Office Complex, Sector - 33, Faridabad, Haryana - 121003, India | 29o 16' 00" | 29o 28' 50" | 80o 45' 00" | 80o 57' 30" | Issued by IBN, Decision Date: 2079-07-03 | |
47 | Lower Badigad HEP | 18.730 | Badigad | 1223 | 2079-07-06 | 2081-07-05 | Aviyan Hydropower Pvt. Ltd | Ka.Ma.Pa-29 Newplaza, Putalisadak, Contact No.: 9852048118 | 28o 13' 41" | 28o 15' 43" | 83o 11' 47" | 83o 14' 19" | Gwalichaur (Baglung) Neta,Paudi Amarahi (Gulmi) | |
48 | Mathillo Marsyangdi -2 Hydropower Project | 327.000 | Marsyangdi | Sa. Aa. 006/2079/80 | 2079-07-06 | 2081-07-05 | Himtal Hydropower Company Pvt. Ltd | Chakupat - 10, Lalitpur | 28o 22' 04" | 28o 29' 35" | 84o 21' 30" | 84o 25' 03" | Issued by IBN, Decision Date: 2079-07-06 | |
49 | Marsyangdi - 7 Hydropower Project | 50.000 | Marsyangdi | 1225 | 2079-08-15 | 2081-08-14 | Beyul Energy Nepal Public Limited | Kathmandu Metropolitan City- 2, Kathmandu | 28o 32' 33" | 28o 36' 21" | 84o 10' 26" | 84o 15' 38" | Chame,Pisng,Tachi Bagarchhap (Manang) | |
50 | Lapa Khola Hydropower Project | 4.720 | Lapa Khola | 1227 | 2079-10-12 | 2081-10-11 | Harmony Initiatives Pvt. Ltd. | Tokha -7, Dhapasi, Kathmandu | 28o 09' 55" | 28o 10' 40" | 85o 02' 05" | 85o 03' 02" | Lapa (Dhading) | Survey license issued for two years, Decision Date: 2079-10-12 |
51 | Middle Iwa Khola Hydropower Project | 15.000 | Iwa Khola | 1228 | 2079-10-12 | 2081-10-11 | Unitech Hydropower Company Pvt. Ltd. | Minbhawan - 31, Kathmandu (Phone no: 01-4106123) | 27o 16' 43" | 27o 18' 20" | 87o 55' 21" | 87o 58' 36" | Falaicha,Chyangthapu (Panchthar) Ankhop,Sadewa (Taplejung) | Survey License issued for Two years, Decision Date: 2079-10-12 |
52 | Lower Ingwa Khola Hydropower Project | 8.000 | Ingwa Khola | 1231 | 2079-11-18 | 2081-11-17 | Ingwa Power Limited | Thapathali-11, Kathamandu | 27o 16' 41" | 27o 17' 04" | 87o 51' 42" | 87o 53' 03" | Oyam,Tharpu (Panchthar) | Survey License issued for Two years, Decision Date: 2079-11-18 |
53 | Tallo Likhu Cascade Hydropower Project | 9.500 | Likhu Khola | 1232 | 2079-12-12 | 2081-12-11 | Swet Ganga Hydropower & Construction Limited | Dhumbarahi, Kathmandu, Tel:01-4373030, 4372828 | 27o 22' 00" | 27o 23' 23" | 86o 13' 10" | 86o 14' 02" | Narmedeshwor,Yasam (Okhaldhunga) Gothgau,Bijulikot (Ramechhap) | |
54 | Trishuli Galchhi Hydropower Project | 30.000 | Trishuli Nadi | 1233 | 2079-12-12 | 2081-12-11 | Api Power Company Limited | Trade Tower Nepal, Thapathali - 11, Kathmandu | 27o 50' 41" | 27o 51' 28" | 85o 01' 48" | 85o 03' 32" | Goganpani,Kalleri,Baireni (Dhading) Duipipal,Budhasing,Taruka,Ratmate,Khadag Bhanjyang (Nuwakot) | Capacity amended from 75 to 30 MW, Scheme to Dam Toe Powwer house type and area also amended (south: from 274752 to 275041, east: from 850425 to 850332 and west: from 845820 to 850148), Decision Date:2080-01-19 |
55 | Maakali Seti PRoR Cascade Hydroelectric Project | 54.000 | Seti Nadi | 1234 | 2079-12-29 | 2081-12-28 | Surma Sarowar Hydropower Pvt. Ltd. | KMC-26, Thapa Gaun | 29o 26' 42" | 29o 28' 55" | 80o 57' 31" | 81o 01' 31" | Bhairabnath,Chaudhari,Dangaji,Kot Bhairab,Parakatne,Rayal (Bajhang) | (i) Add Durgathali RM on clause 3 and 4 (Ga), Decision Date: 2080-02-26 (ii) Change the project name as "Maakali Seti PRoR Cascade Hydroelectric Project", amend installed capacity from 52 MW to 54 MW and amend east boundary from 810114 E to |
56 | Tapowan Seti PRoR Hydroelectric Project | 72.000 | Seti River | 1235 | 2080-01-10 | 2082-01-09 | Tapowan Hydropower Pvt. Ltd. | KTM Ward No 26, Thapa Gaun (Contact No: 9851089120) | 29o 33' 16" | 29o 36' 19" | 81o 11' 45" | 81o 16' 22" | Bhatekhola,Sunikot,Kotdewal,Hemantabada,Chainpur,Rilu (Bajhang) | |
57 | Luja Khola Cascade HEP | 9.800 | Luja Khola | 1236 | 2080-01-26 | 2082-01-25 | Silk Power Pvt. Ltd. | Lalitpur-8, Contact No.: 9841018543 | 27o 40' 00" | 27o 40' 50" | 86o 42' 25" | 86o 43' 00" | Takasindu (Solukhumbu) | (i) Scheme amended from RoR to PRoR, Decision Date: 2080-04-25 (ii)Scheme amended from PRoR to RoR, Decision Date: 2080-08-05 |
58 | Jilli Chumli Khola Hydropower Project | 100.000 | Jilli Chumli Khola | 1237 | 2080-02-04 | 2082-02-03 | sakshyam Hydropower Pvt. Ltd. | Budhanilkantha, Kathmandu | 28o 59' 17" | 29o 05' 50" | 81o 45' 10" | 81o 50' 45" | Odanku (Kalikot) | |
59 | Phedi Khola HEP | 3.500 | Phedi Khola | 1238 | 2080-02-16 | 2082-02-15 | Dolpa Phedi Hydro Company Pvt. Ltd | Lalitpur- 10, Jwagal. Contact No. 9851124391 | 29o 03' 23" | 29o 04' 17" | 82o 34' 14" | 82o 36' 16" | Narku (Dolpa) | |
60 | Super Chuwa Khola Hydropower Project (PRoR) | 80.000 | Chuwa Khola | 1239 | 2080-02-23 | 2082-02-22 | Aviyan Power Company Pvt. Ltd. | New Plaza Putlisadak, Kathmandu - 29 Tel: 9852048118 | 29o 59' 00" | 30o 02' 15" | 81o 57' 44" | 82o 01' 12" | Kharpunath,Simikot (Humla) | 6-hr peaking |
61 | Daraudi/Marsyangdi PRoR Hydropower Project | 14.900 | Daraudi | 1240 | 2080-03-12 | 2082-03-11 | M.A. Energy Ventures Private Limited | Kantipath, Kathmandu, Nepal | 27o 51' 21" | 27o 55' 09" | 84o 32' 30" | 84o 35' 00" | Deurali,Manakamana,Bakrang (Gorkha) | |
62 | Upper Ikhuwa Khola Hydropower Project | 9.600 | Ikhuwa Khola | 1241 | 2080-03-12 | 2082-03-11 | Sashi Power Investment Pvt. Ltd. | Sunakothi - 27, Kathmandu | 27o 35' 50" | 27o 37' 20" | 87o 25' 08" | 87o 27' 07" | Pawakhola (Sankhuwasabha) | |
63 | Ghatganga PRoR Hydroelectric Project | 30.000 | Ghat Ganga | 1244 | 2080-04-25 | 2082-04-24 | Milestone Energy Private Limited | Lalitpur Metropolitan City - 15 | 29o 42' 54" | 29o 45' 36" | 81o 20' 28" | 81o 24' 11" | Kanda (Bajhang) | |
64 | Bhimdang Hydropower Project | 25.110 | Bhimdang Himnadi | 1246 | 2080-05-04 | 2082-05-03 | Road Nepal Private Limited | KMC - 16, Sabitri Adhikari, 9810089900 | 28o 35' 30" | 28o 36' 36" | 84o 25' 40" | 84o 28' 00" | Thoche (Manang) | |
65 | Syarpu Lake Pump Storage Hydroelectric Project | 334.000 | Syarpudaha | 1250 | 2080-06-01 | 2082-05-31 | Nepal Electricity Authority | Darbarmarg, Kathmandu, Contact No: 01-4153007, 4153012 | 28o 40' 00" | 28o 42' 30" | 82o 28' 24" | 82o 30' 00" | ||
66 | Mathillo Budigandaki Hydropower Project | 203.000 | Budhigandaki | 1252 | 2080-06-05 | 2082-06-04 | Nabil Developers Private Limited | Nagarjun Municipality -10, Syuchatar, Kathmandu | 28o 22' 01" | 28o 26' 24" | 84o 52' 40" | 84o 54' 30" | Chunchet,Sirdibas (Gorkha) | |
67 | Jawa Tila PRoR Hydroelectric Project | 70.370 | Tila | 1253 | 2080-06-18 | 2082-06-17 | Nepal Electricity Authority | Darbarmarg, Kathmandu | 29o 11' 50" | 29o 14' 00" | 81o 54' 27" | 82o 01' 42" | Mahabe PattharKhola,Kudari,Kalikakhetu ?,Ghode Mahadev (Jumla) Phoi Mahadev,Ranchuli (Kalikot) | |
68 | Sunkoshi - 3 Storage Hydropower Project | 683.000 | Sunkoshi | 1255 | 2080-08-25 | 2082-08-24 | Nepal Electricity Authority | Darbarmarg, Kathmandu | 27o 26' 53" | 27o 45' 30" | 85o 35' 55" | 85o 50' 00" | Dhulikhel N.P. (Kavrepalanchok) Doramba (Ramechhap) Choutara (Sindhupalchok) | South Boundary amended from 272930N to 272653N, Decision Date: 2081-04-09 |
69 | Panchpokhari Khola PRoR Hydropower Project | 9.030 | Panch Pokhari Khola | 1256 | 2080-09-01 | 2082-08-30 | Saphal Hydropower Private Limited | Naxal, Kathmandu, 01-4426248 | 27o 34' 18" | 27o 36' 09" | 87o 25' 08" | 87o 26' 29" | Pawakhola (Sankhuwasabha) | |
70 | Lower Loti Karnali PRoR Hydropower Project | 61.000 | Loti Karnali Nadi | 1257 | 2080-10-05 | 2082-10-04 | White Water Energy Private Limited | Nagarjun Municipality, Kathmandu | 29o 40' 34" | 29o 45' 27" | 81o 57' 14" | 82o 03' 18" | Photu (Mugu) | |
71 | Mimiban Khola PRoR Hydropower Project | 70.000 | Mimiban Khola | 1258 | 2080-10-11 | 2082-10-10 | Stibha Hydropower Private Limited | Budhanilkantha - 2 , Kathmandu | 29o 42' 42" | 29o 46' 37" | 82o 05' 00" | 82o 10' 30" | Mimi (Humla) | Revised application submitted, 2080-09-08 |
72 | Taksar Pikhuwa Cascade Hydropower Project | 9.500 | Pikhuwa,akhuwa and behere khol | 1259 | 2080-10-29 | 2082-10-28 | Taksar Cascade Power Private Limited | KMC - 22, Khichapokhari | 27o 05' 30" | 27o 07' 30" | 87o 03' 45" | 87o 06' 30" | Taksar,Basteem,Mane Bhanjyang,Dalgaun (Bhojpur) | |
73 | Tribeni Bheri Nadi PRoR Hydropower Project | 78.000 | Bheri Nadi | 1260 | 2080-11-04 | 2082-11-03 | Rara Karnali Hydropower Pvt. Ltd. | Kathmandu Munucipality, W.N.-2, Lazimpat, Kathmandu | 28o 58' 00" | 28o 59' 36" | 82o 31' 44" | 82o 35' 00" | Bhagawati Tol (Jajarkot) Aathbis Kot,Gautamkot (Rukum) | |
74 | Mathillo Siwa Khola PRoR Hydropower Project | 8.180 | Siwa Khola | 1261 | 2080-12-06 | 2082-12-05 | Aabiskar Holdings and Investment Private Limited | Nagarjun Municipality - 02, Kathmandu | 27o 30' 31" | 27o 31' 21" | 87o 33' 57" | 87o 35' 10" | Nalbu,Papung (Taplejung) | |
75 | Bichhya Kuwadi Khola HEP | 70.000 | Kuwadi Khola | 1262 | 2080-12-07 | 2082-12-06 | Mount Himlung Power Development Private Limited | Lalitpur Metropolitan City - 15, Mahalaxmisthan, 01-5527469 | 29o 37' 35" | 29o 41' 34" | 81o 40' 00" | 81o 43' 42" | Rugin (Bajura) Maila (Humla) | |
76 | Ghatte Khola Hydroelectric Project | 9.540 | Ghatte Khola, Deaute Khola | 1263 | 2080-12-12 | 2082-12-11 | Sai Kumari Hydropower Private Limited | Satdobato, Lalitpur, 01-5520295 | 28o 46' 37" | 28o 48' 40" | 82o 29' 30" | 82o 31' 50" | Syalakhadi (Rukum) | |
77 | Dudhkoshi Storage (with Dam - Toe Powerhouse) Hydropower Pro | 70.000 | Dudhkoshi | 1265 | 2080-12-16 | 2081-12-15 | Nepal Electricity Authority | Durbar Marg , Kathmandu | 27o 08' 00" | 27o 23' 52" | 86o 36' 00" | 86o 45' 00" | Lamidada (Khotang) Diyale (Okhaldhunga) Jubu,Panchan (Solukhumbu) | (i) Issued 2nd Time for 1 Yr (4 Yr on Bi.U.Sa. 1095) (ii) Capacity amended from 35 MW to 70 MW, Decision Date:2081-06-23 |
78 | Isuwa PRoR Cascade -2 Hydropower Project | 9.950 | Isuwa Khola | 1268 | 2081-02-13 | 2083-02-12 | Bista Energy House Private Limited | KMC, Ward No 5 | 27o 31' 05" | 27o 32' 29" | 87o 12' 27" | 87o 14' 09" | Num,Mangtewa,Makalu (Sankhuwasabha) | Survey License Issued for second time, Decision Date: 2081-02-13 |
79 | Tamakoshi 3 PRoR Hydropower Project | 650.000 | Tamakoshi | 1271 | 2081-02-18 | 2083-02-17 | T. Three Hydro Company Private Limited | Sinamangal Tower, Sinamangal - 9, Kathmandu Nepal | 27o 29' 34" | 27o 44' 05" | 86o 04' 00" | 86o 10' 00" | Chyama,Dolakha,Mirge,Hawa,Kabhre,Gairimudi,Malu,Lamidada,Sunakhani,Sundrawati,Sahure,Jugu (Dolakha) | |
80 | Mathillo DudhKunda Hydropower Project | 8.520 | Dudh Kunda | 1269 | 2081-02-21 | 2083-02-20 | Lumina Energy Private Limited | KMC-16, Aerahity, Kathmandu | 27o 37' 06" | 27o 38' 09" | 86o 35' 40" | 86o 36' 43" | Beni,Takasindu (Solukhumbu) | |
81 | Syanban Khola Hydropower Project | 31.500 | Syanban Khola | 1277 | 2081-03-14 | 2083-03-13 | White Lotus Power Limited | Ward No,10, KMC | 29o 50' 30" | 29o 54' 13" | 81o 15' 00" | 81o 20' 00" | Kanda (Bajhang) | |
82 | Sabha A Hydropower Project | 9.000 | Sabha Khola | 1282 | 2081-04-07 | 2083-04-06 | Standard H. Energy Private Limited | KMC-31, Lhotse Mall, New Buspark | 27o 24' 13" | 27o 25' 34" | 87o 17' 17" | 87o 18' 32" | Dhupu,Sabha Pokhari (Sankhuwasabha) | |
83 | Super Daraudi Khola E Hydropower Project | 9.413 | Dordi | 1283 | 2081-04-31 | 2083-04-30 | Khanadaha Hydropower Private Limited | Budhanilkanta Nagarpalika, Ward No - 3 | 28o 16' 31" | 28o 17' 40" | 84o 42' 50" | 84o 44' 03" | Ghyalchok,Warpak (Gorkha) | |
84 | Upper Sisne Khola Hydropower Project | 8.500 | Sisne Khola | 1285 | 2081-05-07 | 2083-05-06 | Shakti Punja Urja Private Limited | Mhepi - 16, Kathmandu | 28o 42' 08" | 28o 43' 56" | 82o 40' 52" | 82o 41' 56" | Jang,Pwang,Sisne (Rukum) | |
85 | Seti Khola Cascade Hydropower Project | 9.800 | Seti Nadi | 1287 | 2081-05-12 | 2083-05-11 | Setikhola Hydropower Ltd. | Kathmandu, Nepal | 28o 03' 19" | 28o 05' 20" | 84o 03' 45" | 84o 05' 00" | Bharatpokhari (Kaski) Dulegauda,Dhorfirdi (Tanahu) | |
86 | Mathillo Baddigad Khola Hydropower Project | 9.485 | Badigad | 1288 | 2081-06-02 | 2083-06-01 | Himkunda Eco Power Private Limited | Sukedhara, Kathmandu | 29o 31' 36" | 29o 33' 34" | 81o 36' 30" | 81o 37' 45" | Kolti (Bajura) | |
87 | Super Daraudi - Pau Khola Hydropower Project | 7.000 | Dordi | 1289 | 2081-06-02 | 2083-06-01 | Gorkha Daraundi Hydropower Private Limited | KMC-15, kathmandu | 28o 17' 40" | 28o 18' 30" | 84o 42' 50" | 84o 44' 40" | Ghyalchok,Warpak (Gorkha) |