Survey License for Transmission
(some columns are sortable & filterable, just click on column heading)
S No | Project | Voltage (kV) |
Line Length (km) | Capacity (MW) | Lic No | Isuue Date | Validity | Promoter |
Address | Start Point |
End Point |
Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Radhi small Hydropower 33kV Transmission line | 33 | 14 | 4.4 | 270 | 2073-08-27 | 2078-08-26 | Radhi Bidhyut Company Limited | Bluestar Complex, Tripureswor | Switchyard of Project | Khudi(Tarikuna) NEA Substation(Lamjung) | Single Circuit |
2 | Mathillo Nyasem Khola 132kV TL Project | 132 | 13 | 43 | 278 | 2073-10-13 | 2078-10-12 | Sindhu Jwala Hydropower Pvt. Ltd. | anamnagar, 01-42455184 | Gumba PH | Pantan S/S | |
3 | Mathillo Lapche Khola HEP 132kV TL Project | 132 | 36 | 52 | 279 | 2073-10-23 | 2076-10-22 | Energy Venture Pvt. Ltd. | Tripureswor,PO box no. 23585 | Lamabagar, PH | Singati Substation | |
4 | Upper Naugad Gad Small HPP 33kV Transmission Line Project | 33 | 8 | 8 | 288 | 2074-02-01 | 2077-01-31 | Switchyard of Upper Naugad Gad Small HPP | Chameliya HPP, Balaanch S/S | |||
5 | Rawa Hydropower Project | 33 | 3.8 | 3 | 296 | 2074-04-31 | 2076-04-30 | Rawa Energy Development Pvt. Ltd. | Ghattekulo, Kathmandu, Ph. No. 01-4474165,9851096066 | Switchyard at Sundel and Rakha Dipsun VD | Substation at Bakshila VDC | |
6 | Jhayaku khola Hydro Power Project | 33 | 0.5 | 5.243 | 302 | 2074-05-16 | 2077-05-15 | Ganesh hydropower Company, Kathmandu | 219, Rudramarg, Battisputali, Kathmandu, Ph:-01-4461318 | Switchyard of Jhayaku khola Hydro Power | Singati,NEA Substation (Dolkha) | |
7 | Trishuli 3 B to Bhalche 33 kV transmission line | 33 | 12 | 6.4 | 309 | 2074-07-08 | 2077-07-07 | Nepal Electricity Authority | Durbarmarg, Kathmandu | Trishuli 3 B Hub substation(Nuwakot) | Bhalche substation (Nuwakot) | |
8 | Aankhu Khola Hydropower project transmission line | 132 | 30 | 42.9 | 313 | 2074-07-16 | 2077-07-15 | Aankhu Hydropower Pvt. Ltd. | Thulo Bharyang, Swayambhu-15, Kathmandu | Switchyard of Aankhu (Dhading) | Trishuli 3B Hub substation(Nuwakot) | third time issue |
9 | Khimti to Dorambha Transmission Line | 33 | 19 | 8 | 337 | 2074-12-12 | 2076-12-11 | Nepal Electricity Authority | Durbarmarg, Kathmandu | Khimti Bazaar | Dormbha S/S | |
10 | Syaule to Bagarkot 33kV Tr.Ln. project in Dadeldhura District | 33 | 18 | 3 | 356 | 2075-03-27 | 2077-03-26 | Nepal Electricity Authority | Main office,Darbarmarg,Kathmandu | Syaule | Bagarkot | |
11 | Kaligandaki Garj Hydro Power Project ,Myagdi | 220 | 1.45 | 180 | 361 | 2075-05-10 | 2080-05-09 | Kaligandki Garj Hydro Power Pvt.Ltd. | Charkhal,Dillibazar ,Kathmandu | Switchyard of Kaligandaki Garj Hydro Po | Dana NEA Substation | Double Circuit |
12 | Sangu Sarun khola HPP Dolkha District | 33 | 0.4 | 5 | 362 | 2075-05-14 | 2077-05-13 | Kalinchowk Hydro Power Pvt.Ltd. | UWTC,Tripureshwor,Kathmandu | Sangu Sarun HPP | Sangu HPP Substation | Er. Niroj |
13 | Singati HPP, Dolkha District | 132 | 0.5 | 25 | 364 | 2075-05-24 | 2077-05-23 | Singati Hydro Energy Ltd. | Naxal,Kathmandu ,Nepal | Singati HPP | singati substation | Er. Niroj |
14 | Mudi Khola Hydro Power Project ,Myagdi | 132 | 12 | 14.7 | 367 | 2075-06-02 | 2077-06-01 | Everest Energy and Infrastructure Fund Pvt.Ltd. | Dillibazzar,Kathmandu | Switchyard of Mudi Khola Hydro Power Pr | Dada Khet NEA Substation | |
15 | Tallo Modi Khola Hydro Power Project,Parvat District | 132 | 5 | 20 | 373 | 2075-08-09 | 2077-08-08 | Shree Modi Energy Pvt.Ltd. | Dillibazzar,Kathmandu 4441131,4441444,01-2003887 | Switch yard of Tallo Modi Khola Hydro Po | Switchyard of Tallo Modi 1 HPP | First issued License(B.P.S 248) Cancelled on 2075-05-06 |
16 | Kasuwa Khola Hydro Power's Transmission Line Project | 132 | 28.6 | 45 | 380 | 2075-09-29 | 2080-09-28 | Kasuwa khola Hydro Power Ltd. | Tripureshwor,Nepal Tel: 4222609 | Switchyard of Kasuwa Khola Hydro Power P | Sitalpati NEA Substation | cancelled |
17 | Myagdi Khola Hydropower Project,Mayagdi District | 132 | 17 | 57.3 | 382 | 2075-10-01 | 2080-09-29 | Hydro Village Pvt.Ltd. | Kathmandu-32 | Myagdi Khola HPP | Dadakhet Substation | |
18 | Isuwa Khola Hydropower Project,Sankhuwasava | 220 | 15 | 97.2 | 384 | 2075-11-05 | 2078-11-04 | Shree K.B.N.R Iswa Power Ltd. | Kalopool ,Kathmandu | Switchyard of Isuwa Khola Hydropower Pro | Sitalpati NEA Substation | |
19 | Grid connected Butwl Solar Project | 33 | 5.5 | 8.5 | 393 | 2076-02-03 | 2078-02-02 | Ridi Hydro Power Development Co.Ltd. | Fifth Floor,Trade Tower,Thapahali ,KTM | Switchyard of Project | Jogikuti Substation | |
20 | Ratmate Rasuwagadhi Kerung 400 kV Transmission Line | 400 | 80 | 5000 | 399 | 2076-02-19 | 2081-02-18 | Nepal Electricity Authority | Main office,Darbarmarg,Kathmandu | Rasuwagadhi Border | Ratmate | |
21 | Jurimba Khola Small Hydropower Transmission Line Project | 132 | 3 | 7.63 | 408 | 2076-04-24 | 2081-04-23 | Jurimba Hydropower Co. Pvt. Ltd. | Kathmandu-10, 9851202880 | Switchyard of Project | Switchyard of Upper Chaku A HPP | Single Circuit |
22 | Thulo Khola Hydropower Project | 132 | 21 | 21.3 | 413 | 2076-05-18 | 2078-05-17 | Sungava Foundation Pvt.Ltd. | Sanepa-2,Lalitpur 9843311216 | Switchyard of Thulo Khola HPP(Myagdi) | Dana NEA Substation (Myagdi) | |
23 | Upper Trishuli Hydropower Project | 220 | 24 | 102 | 420 | 2076-07-27 | 2078-07-26 | Upper Trishuli Hydropower Pvt.Ltd. | kathmandu | Switchyard of Upper Trishuli-2 (Rasuwa) | NEA Trishuli 3B Hub(Nuwakot) | |
24 | Upper Sardi Khola Hydropower Project | 33 | 3.3 | 2.9 | 422 | 2076-08-10 | 2081-08-09 | Mandakini Hydropower Ltd. | Sinamangal-9 Kathmandu | Swiychyard of Project (Kaski) | Switchyard of Sardi HPP(4 MW) | |
25 | Pathlaiya Harniya 132kV Transmission Line Project | 132 | 35 | 200 | 424 | 2076-08-18 | 2080-08-17 | Nepal Electricity Authority | Main office,Darbarmarg,Kathmandu | Proposed NEA Nijgad S/S | Harniya NEA Substation | |
26 | Langang Khola Hydropower Project | 132 | 6 | 20 | 432 | 2076-08-25 | 2078-08-24 | Multi Energy Development Pvt.Ltd. | GPO Box.10242,Kathmandu,Nepal | Switcyard of Project (Rasuwa) | Syafrubesi Chilime Hub (Rasuwa) | Single Ckt |
27 | Upper Tamor Hydropower Project | 220 | 5 | 285 | 433 | 2076-08-25 | 2080-08-24 | Tamor Sanima Energy Pvt.Ltd. | Dhumbarahi,Kathmandu | Switchyard of Project (Taplejung ) | Switchyard of Madhya Tamor HPP | |
28 | Saptang Hydropower Project | 33 | 6.29 | 2.5 | 434 | 2076-08-26 | 2078-08-25 | Saptang Hydropower Pvt.Ltd. | Mid Baneshwor,Kathmandu 9841539046 | Switchyard of Project(Nuwakot) | Trishuli3B NEA HUB | |
29 | Midim-1 HEP Transmission Line | 132 | 13 | 13.424 | 440 | 2076-09-08 | 2081-09-07 | Mount Rasuwa Hydropower Pvt.Ltd. | Tokha -7,Basundhara,Kathmandu; 01-4354367; mountrasuwa@gmail.com | Switchyard of Project | NEA Khudi S/S | Single Circuit |
30 | Budhigandaki Corridor Fidim Gumda Ratmate Transmission Line Project | 400 | 85 | 4080 | 441 | 2076-09-15 | 2081-09-14 | Nepal Electricity Authority | Main office,Darbarmarg,Kathmandu | Fidim /Gumda (Gorkha) | Ratmate (Nuwakot) | |
31 | Tingla Hub to Dhalkebar | 400 | 155 | 2500 | 442 | 2076-09-15 | 2081-09-14 | Nepal Electricity Authority | Main office,Darbarmarg,Kathmandu | Tingla Hub(Solukhumbu),Likhu,New Khimti | Dhalkebar NEA Substation (Dhanusha) | |
32 | Lamosanghu Kavre Ramechap | 132 | 36 | 238 | 443 | 2076-09-16 | 2081-09-15 | Nepal Electricity Authority | Main office,Darbarmarg,Kathmandu | Lamosanghu(Sindhupalchowk) | Proposed New Substation at Boundry of Ra | |
33 | Damauli Kusma Bafikot 400kV Transmission Line Project | 400 | 226 | 4080 | 445 | 2076-09-16 | 2081-09-15 | Nepal Electricity Authority | Main office,Darbarmarg,Kathmandu | Damauli (Tanahu) | Bafikot(Rukum) | Double Circuit |
34 | Lomsa Hydropower Project | 33 | 3.3 | 1.1 | 448 | 2076-10-12 | 2078-10-11 | Pathivar Hydropower Pvt.Ltd. | Boudh-6 Kathmandu | Switchyard of project (Dolkha) | Garjyang NEA Substation (Dolkha) | |
35 | Upper Rawa Khola Hydropower Project | 33 | 3.8 | 3 | 449 | 2076-10-12 | 2078-10-11 | Rawa Energy Development Pvt.Ltd. | Ghattekulo Kathmandu 9851096066 | Switchyard of Project (Khotang) | Baksila NEA Substation(Khotang) | |
36 | Ghunsa Khola Hydropower Transmission Line Project | 220 | 32 | 147.8 | 452 | 2076-12-03 | 2080-12-02 | Remit Hydro Ltd. | Maharajgunj ,Kathmandu | Switchyard of Project (Taplejung) | Dhunge Sangu NEA Substation | |
37 | Phukot Karnali PROR HEP 400 KV TL | 400 | 2.5 | 480 | 454 | 2077-01-30 | 2080-01-29 | Vidhyut Utpadan CompNy Limited | BPC Building, Rudramatimarg Kathmandu, 01-4788680, info@vucl.org | Project Powerhouse | Phukot Substation | |
38 | Kimathanka Arun HEP Transmission Project | 400 | 18.5 | 450 | 456 | 2077-01-30 | 2081-01-29 | Vidyut Utpadan Company Limited | BPC Building, Rudramatimarg Kathmandu, 01-4788680, info@vucl.org | Switchyard of Project (Sankhuwasabha) | Haitar Substation (Kimathanka Arun Subst | |
39 | Chhinchu Surkhet TL | 132 | 25 | 80 | 458 | 2077-04-14 | 2079-04-13 | Nepal Electricity Authority | Durbarmarga Kathmandu | Chinchu Substation | Subbakuna Substation | Re license of 322 |
40 | Upper Arun Hydro Electric 400 kV Transmission Line | 400 | 6.5 | 1066 | 460 | 2077-04-28 | 2081-04-27 | Upper Arun Hydro Electric Limited | Durbarmarg Kathmandu; 01-415322, Fax 01-4153040, E-mail: upperarun@nea.org.np | UAHE Plant Switchyard | Haitar S/S | |
41 | Kalikhola Solar PV Plant 33 kV Transmission Line Project | 33 | 3.5 | 3 | 462 | 2077-04-28 | 2080-04-27 | Goodluck Glocal Power Energy Pvt. Ltd. | Tokha-9, Kathmandu. 01-4350636; Bidur-12, Kalikhola Nuwakot; Email: goodluckg201 | Solar PV plant Kalikhola | NEA Devighat S/S | |
42 | Chameliya (Chhetigad) HPP Transmission Line | 132 | 22 | 85 | 468 | 2077-05-24 | 2081-05-23 | Grid Nepal Company Pvt. Ltd. | Pandol Marg, Khursanitar Lazimpat, Kathmandu-03; | Switchyard of Project | NEA Balanch S/S | |
43 | Lapche Khola HEP 220 kV Transmission Line Project | 220 | 49 | 160 | 472 | 2077-06-07 | 2080-06-06 | Nasa Hydro Power Pvt. Ltd. | Kathmandu Naxal, Phone 01-4414355, 4414104, Email: info@mvdugarhydro.com | Switchyard of Project Dolkha | Barhabise S/S NEA Sindhupalchowk | |
44 | Ikuwa Khola HPP Transmission Line Project | 132 | 3 | 30 | 477 | 2077-07-17 | 2081-07-16 | Upper Arun Hudro-Electric Limited | Durbar Marg, Kathmandu. 01-4117163/54/65; upperarun@nea.org.np | Switch yard of Project | Arun Hub Substation Haitar | |
45 | Khimti Ghwang Khola HEP Transmission Line | 33 | 5.5 | 9 | 478 | 2077-07-17 | 2079-07-16 | Nilganga Hydropower Company P. Ltd. | Subidhanagar, Tinkune-32, Kathmandu; GPO Box: 8973, 01-4111853/673 | Switchyard of Project | NEA Garjyang S/S | Single Circuit |
46 | Nyasim Khola Hydropower Transmission Line Project | 132 | 8 | 35 | 479 | 2077-08-10 | 2081-08-09 | Sita Hydro Power Company Pvt. Ltd. | Kalimati-13, Kathmandu; 01-4672442, sitahydro@gmail.com | Switchyard of Project | NEA Pantan S/S Sindhupalchowk | Double Circuit |
47 | Ghunsa Khola HEP Construction Power Transmission Line | 33 | 35 | 5 | 486 | 2077-09-26 | 2081-09-25 | Remit Hydro Ltd. | Maharajgunj ,Kathmandu-03; 01-4424954,4430986 | NEA Hiti S/S | Power House Site of Ghunsa HEP | Double Circuit |
48 | West Seti Corridor (West Seti-Dododhara) 400 kV Transmission Line Project | 400 | 68 | 1500 | 487 | 2077-10-06 | 2080-10-05 | Rastriya Prasaran Grid Company Limited | DCC Bhawan Babarmahal, Kathmandu; 01-4266693; rpgcl.np@gmail.com | Proposed West Seti S/S | Proposed New Attariya S/S | Double Circuit |
49 | Kaseni-CG Sardewa 33 kV Transmission Line | 33 | 8 | 20 | 489 | 2077-11-03 | 2079-11-02 | CG Cement Industries Palpa Pvt. Ltd. | Chaudhary House Sanepa-02 Lalitpur, 01-5525039/41 | NEA Ridi S/S, Kaseni | CG Cement Sardewa | Double Circuit |
50 | Lamhai Chhinchu 400kV Transmission Line Project | 400 | 94 | 1933 | 497 | 2078-04-07 | 2081-04-06 | Nepal Electricity Authority | Durbar Marg Kathmandu | Lamhai S/S | Proposed Chhichu S/S | Double Circuit |
51 | Jhurjhure 132 kV Transmission Line and Substation Project | 132 | 40 | 200 | 499 | 2078-04-08 | 2080-04-07 | Nepal Electricity Authority | Durbar Marg Kathmandu | NEA Kamane S/S | Proposed Faparbari S/S | Double Circuit |
52 | Chhinchu Dododhara 400 kV Transmission Line Project | 400 | 90 | 1933 | 500 | 2078-04-29 | 2081-04-28 | Nepal Electricity Authority | Durbar Marg Kathmandu | Proposed Chhinchu S/S | Proposed Dododhara S/S | Double Circuit |
53 | Sitalpati-Inaruwa 400 kV Transmission Line Project | 400 | 130 | 4400 | 506 | 2078-06-15 | 2082-06-14 | Nepal Electricity Authority | Durbar Marg Kathmandu | NEA Sitalpati S/S | NEA Inaruwa S/S | Double Circuit |
54 | Arun Hub (Sitalpati) -Tingla-Dudhkoshi 400 kV Transmission Line Project | 400 | 115 | 4400 | 507 | 2078-06-24 | 2082-06-23 | Nepal Electricity Authority | Durbar Marg Kathmandu | Sitalpati S/S | Proposed Dudhkoshi S/S | Double Circuit |
55 | Jum Khola Transmission Line Project | 132 | 37 | 56 | 508 | 2078-06-24 | 2081-06-23 | Sanima Jum Hydropower Ltd. | P.O.Box: 19737 Dhumbarahai, KTM 01-4373030; sanima@sanimahydro.com | Switchyard of Project | NEA Garjyang S/S | Double Circuit |
56 | Simbuwa 220 kV Transmission Line Project | 220 | 3.2 | 70.3 | 509 | 2078-07-22 | 2081-07-21 | Simbuwa Remit Hydro Ltd. | Maharajgunj ,Kathmandu-03; 01-4445857, info@srhl.org.np | Switchyard of Project | Switchyard of Ghunsa Khola HEP | Double Circuit |
57 | Lamabagar Barhabise 220kV Transmission Line Project | 220 | 43 | 1240 | 511 | 2078-07-25 | 2081-07-24 | Rastriya Prasaran Grid Company Limited | DCC Bhawan Babarmahal, Kathmandu; 01-4266693; rpgcl.np@gmail.com | Proposed Lamabagar S/S | NEA Barhabise S/S | Double Circuit |
58 | Yampa Phat- Saranghat Transmission Line Project | 33 | 19.5 | 4.8 | 513 | 2078-08-14 | 2080-08-13 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Yampa Phat | Proposed Sarangghat S/S | Single Circuit |
59 | Suti Khola Transmission Line Project | 132 | 10.6 | 21 | 514 | 2078-08-15 | 2080-08-14 | Nilganga Hydropower Company Pvt. Ltd. | Subidhanagar, KTM-32, 014111853; haripandey1954@gmail.com | Switchyard of Project | NEA Dharapani S/S | Single Circuit |
60 | Khairenitar Ghiring Transmission Line Project | 33 | 18 | 4.8 | 515 | 2078-08-16 | 2080-08-15 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | NEA Kahiranitar S/S | NEA Ghiring S/S | Single Circuit |
61 | Upper Chauri Khola Small HEP Transmission Line Project | 33 | 2 | 6 | 519 | 2078-08-28 | 2080-08-27 | Himalyan Water Resource and Energy Development Company Pvt. Ltd. | Baneswor 31, KTM; 01-47770000 | Switchyard of Project | NEA Madankudari S/S | Single Circuit |
62 | Jagdulla Bafikot 132 kV Transmission Line Project | 132 | 50 | 106 | 526 | 2078-11-01 | 2080-10-29 | Jagdulla Hydropower Company Limited | Baneshwor, Kathmandu-10; 01-4479242; info@jhcl.com.np | Switchyard of Project | NEA Bafikot S/S | Double Circuit |
63 | Phukot Karnali PROR Dam Toe Power Plant Transmission Line Project | 33 | 6 | 6 | 529 | 2078-11-08 | 2080-11-07 | Vidhyut Utpadan Company Limited | Buddhanagar Kathmandu-10; 01-4788680, info@vucl.org | Switchyard of Dam Toe HPP | Switchyard of PROR Project | Double Circuit |
64 | Nijgad Pokhariya Transmission Line Project | 400 | 75 | 2000 | 530 | 2078-11-12 | 2080-11-11 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Proposed Nijgad S/S | Proposed Pokhariya S/S | Double Circuit |
65 | 33 kV Transmission Line for Rolwaling Khola HPP | 33 | 8.4 | 20.66 | 531 | 2078-11-16 | 2081-11-15 | Upper Tamakoshi Hydropower Limited | Gyaneshwor, Kathmandu; 01-4420658, office@utkhpl.org.np | Switchyard of Project | UTKHPP S/S Gongar | |
66 | Lower Apsuwa Hydropower Transmission Line Project | 132 | 19 | 54 | 534 | 2078-12-07 | 2081-12-06 | Mizu Energy Ltd. | Hyatt Place Soalteemode KTM; 01-4671200 | Switchyard of Project | NEA Sitalpati S/S | Double Circuit |
67 | 33 kV Transmission Line for Upper Deumai Hydropower Project (8.3MW) | 33 | 9 | 8.3 | 541 | 2079-01-11 | 2082-01-10 | Water Energy Solution Pvt. Ltd. | Gatthaghar Madhyapur Thimi, Bhaktapur, Ph. No. 9854040509, email:- upperdeumai@g | Switchyard of Upper Deumai Khola SHEP | Chisapani Substation Ilam | Single circuit |
68 | Upper Irkhuwa Transmission Line Project | 132 | 10.2 | 14.5 | 543 | 2079-01-11 | 2082-01-10 | Arati Power Company Limited | Gahanapokhari, KTM-05; 01-4419321 | Switchyard of Project | NEA Sitalpati S/S | Single Circuit |
69 | Transmission Line for Sonaha Solar Farm , Bardiya | 33 | 18.7 | 10 | 547 | 2079-02-06 | 2081-02-05 | Bharati Laxmi Energy Pvt. Ltd. | Baluwatar-04 Kathmandu | Switchyard of Project | NEA Bhurigaun S/S | |
70 | Grid connected solar power project 11kV transmission line | 11 | 4 | 2 | 556 | 2079-04-08 | 2081-04-07 | Sourya Vidhyut Power Pvt. Ltd. | Narayanchaur, Naxal-01, Kathmandu | Switchyard of the project | 33/11 Kv NEA Parasi substation | Single Circuit |
71 | Upper Mardi Khola Hydro Power Transmission Line Project | 33 | 12 | 7 | 558 | 2079-04-18 | 2082-04-17 | United Idi Mardi and RB Hydropower Ltd. | Lekhnath-7, Pokhara; unitedidimardi7mw@gmail.com, 061-465806,01-5012027 | Switchyard of Project | NEA Lahacowk S/S | Single Circuit |
72 | Transmission Line for Seti Khola Hydropower Project | 132 | 1.5 | 22 | 559 | 2079-04-18 | 2081-04-17 | Setikhola Hydropower Pvt. Ltd. | Kantipath, Kathmandu, P.O.Box 26153; 01-4232229 | Switchyard of Project | LILO between Tower No 53 & 56 of NEA Le | Double Circuit |
73 | Chhujung Khola & Bakan Khola Joint 220 kV Transmission Line Project | 220 | 55 | 107 | 560 | 2079-05-02 | 2081-05-01 | Sangrila Urja Pvt. Ltd. | Anamnagar 29 Kathmandu, 9851175012 | Switchyard of Chhujung Khola Project | NEA Sitalpati S/S | Double Circuit |
74 | Darbang Myagdi HEP Transmission Line Project | 132 | 6.3 | 25 | 561 | 2079-05-08 | 2081-05-07 | Dhaulagiri Kalika Hydro Pvt. Ltd. | Gyaneswor 30, KTM, 01-4536819, info@darbanghydro.com | Switchyard of Project | NEA Dadakhet S/S | Single Circuit |
75 | Grid Solar and Energy efficiency Project | 33 | 9.28 | 16.66 | 562 | 2079-05-17 | 2081-05-16 | Nepal Electricity Authority | Durbarmarg, Kathmandu | Bharatpur-12 Godrang | Bharatpur-6 Devnagar | Single circuit |
76 | Khorunga Khola Small HEP Transmission Line Project | 33 | 3.47 | 4.8 | 564 | 2079-05-28 | 2081-05-27 | Reliable Hydro Power Co. Pvt. Ltd. | Jawalakhel Lalitpur, POB 516; 015551616 | Switchyard of Project | NEA Jiri Khimti S/S | Single Circuit |
77 | Upper Seti -1 Transmission Line Project | 33 | 3.1 | 13 | 567 | 2079-07-04 | 2081-07-03 | Shrestha Energy Solution Pvt. Ltd. | Budhanilkanth-04, Kathmandu; 01-4373665; shresthaenergy@gmail.com | Switchyard of Project | NEA Lahacowk S/S | Single Circuit |
78 | West Seti (Banlek) Dododhara Transmission Line Project | 400 | 80 | 2250 | 568 | 2079-07-20 | 2081-07-19 | Rastriya Prasaran Grid Company Limited | Bbarmahal-11 Kathmandu; 01-4266693 | Proposed West Seti S/S | Proposed Dododhara S/S | Double Circuit |
79 | Sitalpati Dhungesanghu Transmission Line Project | 220 | 48 | 600 | 570 | 2079-07-28 | 2081-07-27 | Rastriye Prasaran Grid Company Limited | Babarmahal-11 Kathmandu; 01-4266693 | NEA Sitalpati S/S | NEA Dhungesanghu S/S | Double Circuit |
80 | Baigundhura Solar Farm transmission line | 33 | 8.46 | 5 | 569 | 2079-07-29 | 2081-07-28 | East Solar Pvt. Ltd. | GPO Box No. 8643, Sinamangal, Kathmandu, Phone No. 9843894739 | Baigundhura Gauradaha | Shivasaxi Dham | Single Circuit |
81 | Mugu Karnali 400kV Transmission Line Project | 400 | 40 | 1902 | 571 | 2079-08-06 | 2081-08-05 | Vidhyut Utpadan Company Limited | BPC Building Rudramati Marg, Buddhanagar KTM-10 | Switchyard of Project | RPGCL Phukot S/S | Double Circuit |
82 | 33 kV transmission line of Kalikhola A solar electricity project | 33 | 3.88 | 7 | 572 | 2079-08-19 | 2081-08-18 | Goodluck Glocal Power Energy Pvt. Ltd. | Tokha-09, Ktm, Phone No. 01-4350636 | Kalikhola A power station/switchyard | Kalikhola Solar Power House | |
83 | Lamki Chaukune 132 kV Transmission Line Project | 132 | 35 | 200 | 573 | 2079-09-05 | 2081-09-04 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | NEA Lamki S/S | NEA Chaukune S/S | Double Circuit |
84 | Dhaubadi Iron Mines Transmission Line Project | 220 | 12 | 510 | 574 | 2079-09-13 | 2081-09-12 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Tower No 107 & 108 of 220 kV H-B TL | Dhaubadi S/S | Multi Circuit |
85 | Sona Khola 33 kV Transmission Line Project | 33 | 6 | 9 | 578 | 2079-10-04 | 2081-10-03 | Himali Hydro Fund Ltd. | Mid Baneswor Kathmandu-32; 014109156 | Switchyard of Project | Mewa S/S | Single Circuit |
86 | 220 kV Transmission Line for Chainpur Seti HEP | 220 | 15 | 210 | 583 | 2079-11-03 | 2081-11-02 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Switchyard of Project | Proposed Bajhang S/S | Double Circuit |
87 | Auraha Simara 132 kV Transmission Line Project | 132 | 7 | 200 | 584 | 2079-11-12 | 2081-11-11 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Between T.N. 25&26 of Pathalaiya Parwani | Simara S/S | Multi Circuit |
88 | LILO of Tanhu-Bharatpur Transmission Line with Damauli-Lekhnath Transmission Lin | 220 | 0.98 | 150 | 585 | 2079-11-15 | 2081-11-14 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Tanhu Bharatpur TL@Byas Tanhu | Damauli Lekhnath TL@Byas Tanhu | Multi Circuit |
89 | Attariya Dhangadhi 132 kV Transmission Line Project | 132 | 16.4 | 200 | 586 | 2079-12-01 | 2081-11-30 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Attariya S/S | Dhangadhi S/S | Double Circuit |
90 | Madkyu Khola Transmission Line Project | 33 | 14 | 13 | 587 | 2079-12-01 | 2081-11-30 | Sikles Hydropower Ltd. | Lekhnath-7, Pokhara | Switchyard of Project | Upper Madi HEP Switchyard | Double Circuit |
91 | Khimti Rakathum 132 kV Transmission Line Project | 132 | 29 | 238 | 588 | 2079-12-09 | 2081-12-08 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Proposed Rakathum S/S | NEA New Khimti S/S | Double Circuit |
92 | Phukot Ranchuli 132 kV Transmission Line Project | 132 | 36 | 238 | 589 | 2079-12-09 | 2081-12-08 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Phukot S/S | Ranchuli S/S | Double Circuit |
93 | Dukuchhap New Teku 220 kV transmission Line Project | 220 | 12 | 1200 | 590 | 2079-12-09 | 2081-12-08 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Proposed Dukuchap S/S | Proposed Teku S/S | Multi/Double Circuit |
94 | Matatirtha-Dukuchhap 220 kV Transmission Line | 220 | 12 | 1200 | 591 | 2079-12-12 | 2081-12-11 | Nepal Electricity Authority | Durbarmarg, kathmandu | Matatirtha S/S | Bifurcation Point (Dukuchhap-New Teku 22 | Double Circuit, Twin Moose Conductor |
95 | Nepalgaunj Nanpara 132 kV Transmission Line Project | 132 | 23.5 | 200 | 592 | 2079-12-20 | 2081-12-19 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | NEA Nepalgaunj | NEA Janaki S/S | Double/Multi Circuit |
96 | Bajhang Banlek (West Seti) 400 kV Transmission Line Project | 400 | 55 | 1130 | 593 | 2079-12-20 | 2081-12-19 | Rastriya Prasaran Grid Company Limited | BPC complex Buddhanagar Kathmandu, 01-4610103 | Bajhang S/S | Banlek S/S | Double Circuit |
97 | Hewa A Small HEP 33kV Transmission Line Project | 33 | 10 | 5 | 594 | 2079-12-20 | 2081-12-19 | Habitat Power Co. Pvt. Ltd. | Chabahil, Kathmandu-7, 015242384 | Switchyard of Project | NEA Phidim S/S | Single Circuit |
98 | Madhya Tara Khola 33 kV Transmission Line | 33 | 5.2 | 2.2 | 595 | 2080-01-10 | 2082-01-09 | Madhya Tarakhola Hydropower Pvt. Ltd. | New Baneshwor-10, Kathmandu, Phone No. 01-4785232, email-madhya.tarakhola@gmail. | Madhya Tara Khola Switchyard | Daram Khola A Switchyard | Single Circuit |
99 | Okharpauwa Tinpiple 220 kV Transmission Line Project | 220 | 4 | 1100 | 596 | 2080-01-26 | 2082-01-25 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Okharpauwa | Tinpiple S/S | Multi Circuit |
100 | Mewa Kola 132 k V Transmission Line Project | 132 | 5 | 23 | 597 | 2080-02-05 | 2082-02-04 | Union Mewa Hydro Limited | Lalitpur-2, Kupandole 01-5911208 | Switchyard of Project | Mewa khola s/s | Single Circuit |
101 | Dukuchahap Sirutar Nalagumba Lapshiphedi 220 kV Transmission Line | 220 | 31 | 1083 | 598 | 2080-02-05 | 2082-02-04 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Dukuchap | Lapsiphedi | Double Circuit, Twin Moose Consuctor |
102 | Laphsiphedi-Kapan Gumba- Tinpiple 220 kV TL | 220 | 36.5 | 1083 | 599 | 2080-02-21 | 2082-02-20 | Nepal Electricity Authority | Durbarmarg. kathmandu | Laphsiphedi S/S | Tinpiple S/S | Double Circuit with Substation at Kapan Gumba |
103 | Syaule Sanphebagar 132 kV Transmission Line Project | 132 | 70 | 200 | 601 | 2080-03-07 | 2082-03-06 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | NEA Syaule S/S | Proposed Sanphebagar S/S | Double Circuit |
104 | Karuwa Seti HEP Transmission Line Project | 132 | 11 | 32 | 602 | 2080-03-08 | 2082-03-07 | Jhyamolongma Hydropower Development company Ltd. | Pokhara Lekhnath -11 Kaski, 061-465806 | Switchyard of Project | Switchyard of Seti Nadi HEP | Double Circuit |
105 | Balefi A HEP Transmission Line Project | 33 | 14 | 22.14 | 603 | 2080-03-13 | 2082-03-12 | Moonlight Hydropower Co Ltd. | Kalopool-07, KTM 01-4562844 | Switchyard of Project | NEA Barhabise S/S | double Circuit |
106 | Balaju Singhdurbar (K3) Under Ground Transmission Line Project | 132 | 12 | 350 | 604 | 2080-03-13 | 2082-03-12 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Balaju S/S | Singhdurbar K3 S/S | Double Circuit |
107 | Teku Thapathali 132 kV Underground Transmisssion Line Project | 132 | 2 | 350 | 605 | 2080-03-26 | 2082-03-25 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Teku S/S | Thapathali S/S | Double Circuit |
108 | Sirutar Harisiddhi Patan Underground Transmission Line Project | 132 | 11.64 | 340 | 607 | 2080-04-09 | 2082-04-08 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | SIrutar S/S | Patan S/S | Double Circuit |
109 | Super Lower Bagmati Transmission Line Project | 132 | 30 | 41.86 | 608 | 2080-04-15 | 2082-04-14 | Super Bagmati Hydropower Pvt. Ltd. | Rabibhawan Kathmandu; 01-4670518 | Switchyard of Project | NEA Chandrapur S/S | Single Circuit |
110 | Bhaktapur Sirutar 132 kV Under Ground Transmission Line Project | 132 | 7 | 200 | 609 | 2080-05-07 | 2082-05-06 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Bhaktapur S/S | Sirutar S/S | Double Circuit |
111 | Chulepu Khola Transmission Line project | 33 | 13 | 8.52 | 610 | 2080-05-24 | 2082-08-23 | Chandeswari Mahadev Khola Micro Hydro Pvt. Ltd. | Bhaktapur | Switchyard of Project | Bamati S/S | Single Circuit |
112 | Bhotekoshi-1 HEP Transmission Line Project | 132 | 1.4 | 40 | 611 | 2080-05-24 | 2082-05-23 | Electro Power Co. Ltd. | Baneswor 31, KTM; 01-4444947 | Switchyard of Project | TL of Upper Chaku A T.N. 6 | Double Circuit |
113 | Istul Khola SHP Transmission Line Project | 33 | 6.84 | 1.506 | 612 | 2080-06-16 | 2082-06-15 | Amar Jyoti Hydropower Pvt. Ltd. | Tahachal Kathmandu-13; 9851191418 | Switchyard of Project | NEA Masel S/S | Single Circuit |
114 | Dododhara New Attariya (Daijee) Transmission Line and Substation Project | 400 | 103 | 2000 | 614 | 2080-06-29 | 2082-06-28 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | RPGCL Dododhara | NEA New Attsariya | Double Circuit |
115 | Myagadi Corridor combined 33 kV Construction Power Transmission Line | 33 | 15.1 | 4 | 615 | 2080-06-29 | 2082-06-28 | Hydro Village Pvt. Ltd. | Krishna Galli Lalitpur; 01-5423960 | Headwork of Upper Myagdi-1 HEP | Headworks of Myagdi Khola HEP | Single Circuit |
116 | EIlep Tatopani HEP Transmission Line Project | 132 | 27 | 25 | 616 | 2080-07-03 | 2082-07-02 | Jalshakti Hydro Company Pvt. Ltd. | Kathmandu-02, Lazimpat | Switchyard of Project | Trishuli 3B Hub Substation | Single Circuit |
117 | Balaju Syuchatar 132 kV Under Ground Transmission Line Project | 132 | 4.82 | 300 | 617 | 2080-07-21 | 2082-07-20 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Balaju S/S | Syuchatar S/S | Double Circuit |
118 | Humla Phukot Transmission Line Project | 400 | 85 | 2250 | 618 | 2080-08-10 | 2082-08-09 | Rastriya Prasaran Grid Company Limited | Buddhanagar Kathmandu-10;01-4610103, info@rpgcl.com | Humala S/S | Phukot S/S | Double Circuit |
119 | Singhadurbar Maitidevi Chabahilll 132 kV Under Ground Transmission Line Project | 132 | 4.73 | 300 | 619 | 2080-08-10 | 2082-08-09 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Singhadurbar K3 S/S | Chabahill S/S | Double Circuit |
120 | Chabahil Kapan Gumba 132 kV Transmission Line Project | 132 | 6.75 | 300 | 620 | 2080-08-12 | 2082-08-11 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Chabahil S/S | Kapan Gumba S/S | Double Circuit |
121 | Super Melamchi Hydro Power Transmission Line Project | 132 | 20 | 23.6 | 621 | 2080-09-08 | 2082-09-07 | Milarepa Energy Pvt. Ltd, | Bajramarg Ramhiti Baudha-6 Kathmandu | Switchyard of Project | NEA Samundratar S/S | Single Circuit |
122 | Manang Marshyangdi Hydro Transmission Line Project | 220 | 2.5 | 135 | 622 | 2080-09-24 | 2082-09-23 | Manang Marshyangdi Hydropower Co. Pvt. Ltd. | 253 Kantuhiti Marga, Sanepa-02 Lalitpur Neapal | Switchyard of Project | NEA Dharapani S/S | Double Circuit |
123 | Upper Sankhuwa Khola Transmission Line Project | 132 | 19 | 40 | 623 | 2080-10-09 | 2082-10-08 | Happy Energy Pvt. Ltd. | Hadigaoun Kathmandu 01-4426248 | Switchyard of Project | NEA Sitalpati S/S | |
124 | Dar Khola HPP 33 kV Transmission Line Project | 33 | 7 | 6.5 | 624 | 2080-11-03 | 2082-11-02 | Dar Khola Hydropower Pvt. Ltd. | Samakhusi Kathmandu | Switchyard of Darkhola HPP | NEA Dadakhet S/S | Single Circuit |
125 | Mid Hongu Khola A - Mid Hongu Khola B 132 kV Transmission Line Project | 132 | 5.6 | 22 | 625 | 2080-11-04 | 2082-011-03 | Apex Makalu HPL | New Baneswor KTM; apex.makalu@gmail.com | Switchyard of Project | S/Y of Md Hongu Khola B | Single Circuit |
126 | Tamor Khola-5 to Dhungesanghu Transmission Line Project | 132 | 29 | 37.52 | 626 | 2080-12-04 | 2082-12-03 | River Side Hydro Energy Ltd. | Kathmandu-30, Dillibazar; 01-4527090 | Switchyard of Project | NEA Dhungesanghu S/S | Single Circuit |
127 | Himal Iron & Steel Factory to Parwanipur Transmission Line Project | 132 | 1.4 | 30 | 628 | 2080-12-07 | 2080-12-06 | Himal Iron and Steel Pvt. Ltd. | Jyoti Bhawan, Kantipath KTM, 01 4226327 | NEA Parwanipur S/S | Himal Factory Premises | Single Circuit |
128 | Doodhkoshi Dam Toe - Sitalpati Tingla Doodhkoshi Transmission Line AP51-52 Proje | 400 | 1.5 | 500 | 629 | 2080-12-08 | 2082-12-07 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Switchyard of Dam Toe Project | LILO at S-T-D 400kV Line | Double Circuit |
129 | Surke Doodhkoshi New Khimti Transmission Line Project | 220 | 66.6 | 188 | 630 | 2080-12-08 | 2082-06-07 | Summit Power Company Pvt. Ltd. | TRipureshwor Kathmandu | Switchyard of Project | New Khimti S/S | Double Circuit |
130 | Super Seti Lahachowk Transmission Line Project | 132 | 18 | 24 | 631 | 2080-12-08 | 2082-12-07 | SN Energy Pvt. Ltd. | Mahalaxmi-6, Lalitpur. 01-5913982 | Switchyard of Super Seti Project | NEA Lahacowk S/S | Single Circuit |
131 | Sabha Khola B to Sitalpati 132 kV Transmission Line Project | 132 | 22 | 42.15 | 632 | 2080-12-27 | 2082-12-26 | Orbit Energy Limited | Switchyard of Sabha Khola B HPP | Sitalpati S/S | Single Circuit | |
132 | Kasuwa Khola-Sitalpati 132 kV Transmission Line Project | 132 | 29 | 45 | 633 | 2080-12-27 | 2082-12-26 | Kasuwa Khola Hydropower Limited | Tripureswor-11, Kathmandu; 01-4101140 | Switchyard of Project | NEA Sitalpati S/S | Single Circuit |
133 | Dana khola - Dharapani Transmission Line Project | 220 | 5.5 | 49.95 | 634 | 2080-12-27 | 2082-12-26 | Lalupate Hydropower Company Pvt. Ltd. | Bagbazar Kathmandu 01-4251037 | Switchyard of Project | NEA Dharapani S/S | Single Circuit |
134 | Super Iwa Khola- Amarpur Transmission Line Project | 33 | 24 | 4.795 | 635 | 2080-12-27 | 2082-12-26 | Kanchanjangha Hydro Energy Pvt. Limited | Koteswor Kathmandu | Switchyard of Project | NEA Amarpur S/S | Single Circuit |
135 | West Seti Switchyard to West Seti Hub Sub Station Transmission Line Project | 400 | 4.5 | 750 | 637 | 2081-01-27 | 2083-01-26 | NHPC Limited | Sector 33 Faridabad Haryana India | Switchyard of WS Project | RPGCL Banlek S/S | Double Circuit |
136 | Nalgad Bafikot 400 kV Transmission Line Project | 400 | 20 | 2250 | 638 | 2081-01-27 | 2083-01-26 | Rastriya Prasaran Grid Company Limited | Buddhanagar Kathmandu-10; 01-4610103, info@rpgcl.com | Nalgad S/S | Bafikot S/S | Double Circuit |
137 | Upper Balephi Pantang Transmission Line Project | 132 | 11 | 46 | 639 | 2081-01-27 | 2083-01-26 | Upper BAlephi Hydropower Ltd. | Ratopul Kathmandu | Switchyard of Project | NEA Pantang S/S | Single Circuit |
138 | Sankhuwa Khola- Sitalpati Transmission Line Project | 132 | 4 | 41.06 | 636 | 2081-01-28 | 2083-01-27 | Guras Hydro Pvt. Ltd. | Bhanimandal, Lalitpur-4; 01-5535015 | Switchyard of Project | NEA Sitalpati S/S | Single Circuit |
139 | Upper Junbesi- Lower Dudhkunda- Tingla 33 kV Transmission Line Project | 33 | 25 | 14.18 | 640 | 2081-02-04 | 2083-02-03 | Gorkhas Himalyan Hydro Ltd. | Kathmandu-31 | Switchyard of Upper Junbesi HPP | NEA Tingla S/S | Double Circuit |
140 | Madhya Super Daraudi switchyard to Ghyampesal substation Transmission Line proje | 33 | 18 | 10 | 641 | 2081-02-04 | 2083-02-03 | Barpak Daraudi Hydropower Pvt. Ltd. | Kathmandu | Switchyard of Project | NEA Ghyampesal S/S | Single Circuit |
141 | Plaun Kola - Dhungesangu 132 kV Transmission Line Project | 132 | 22 | 21 | 642 | 2081-02-30 | 2083-02-29 | Palun Khola Hydropower Limited | Lalitpur-10, Kupandole; 01-4527090 | Switchyard of Project | NEA Dhungesanghu S/S | Single Circuit |
142 | Nyadi Phidi HPP Switchyard - Nyadi HPP Switchyard | 132 | 14 | 21.4 | 643 | 2081-02-31 | 2083-02-30 | North Summit Hydro Limited | Babarmahal-11 , Kathmandu | Nyadi Phidi HPP Switchyard | Nyadi HPP Switchyard | single circuit |
143 | Kalika Kaligandaki - New Bharatpur Transmission Line Project | 132 | 12 | 38.16 | 644 | 2081-02-31 | 2083-02-30 | Maula Kalika Hydropower Company Ltd. | New Baneswor Kathmandu 01-5913897 | Switchyard of Project | New Bharatpur S/S | Single Circuit |
144 | Upper Bramhayani - Pangtang 132 kV Transmission Line Project | 132 | 16 | 51.67 | 645 | 2081-03-11 | 2083-03-10 | Intergreted Hydro Fund Nepal Pvt. Ltd. | Kathmandu | switchyard of Upper Bramhayani | NEA Pangtang S/S | Upper Bramhayani switchyard- Bramhyanai switchyard- NEA Pangtang S/S |
145 | Bajhang Mathillo Seti HPP-Lamki Substation 132 kV Transmission Line Project | 132 | 140 | 216 | 646 | 2081-03-21 | 2083-03-20 | Samriddhi Energy Ltd. | Anamnagar, Kathmandu | switchyard of the project | NEA lamki S/S | Double circuit |
146 | Dhansar-Harnaiya 400kV Transmission Line Project | 400 | 35 | 1000 | 647 | 2081-03-27 | 2083-03-26 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Dhansar NEA Substation | Harniya NEA Substation | Double Circuit |
147 | Lower Mid Rawa Khola HPP -Wakshila 33 kV Transmission line Project | 33 | 7 | 4 | 648 | 2081-04-08 | 2083-04-07 | Lower Mid Rawa Khola HPP,Pvt.Ltd | Maharajgunj, Kathmandu | Respective Switchyard of the project | Wakshila s/s | Single Ckt |
148 | Aayu Malun to Tingla Transmission Line Project | 132 | 18.5 | 21 | 649 | 2081-04-13 | 2083-04-12 | Puwa Khola-1 Hydropower Ltd | Anamnagar Kathmandu-29; 01-4102710 | Switchyard of Project | NEA Tingla S/S | Single Circuit |
149 | Mathilo Maiwa HPP- Dhungesanghu 132 kV Transmission Line Project | 132 | 5 | 17.85 | 650 | 2081-04-15 | 2083-04-14 | Kang Hydropower Company Ltd. | Koteshwor,Kathmandu | Respective Switchyard of the project | Dhungesanghu s/s | Single Ckt |
150 | Mathillo Tadi HPP- Samundratar 33 kV Transmission Line Project | 33 | 7 | 11 | 651 | 2081-04-16 | 2083-04-15 | Suryakunda Hydroelectric Limited | Trade Tower, Thapathali, Kathmandu | switchyard of the project | NEA Samundratar S/S | Double circuit |
151 | Trishuli 3B- Ratamate 220 kV Transmission Line Project | 220 | 23.5 | 1234 | 652 | 2081-04-18 | 2083-04-17 | Nepal Electricity Authority | Durbarmarg Kathmandu | Trishuli 3B Hub S/S | Ratamate S/S | double circuit , old survey lisence no 402 |
152 | Ratnapark -Thapathali Underground 132 kV Transmission Line Project | 132 | 2.4 | 340 | 653 | 2081-04-28 | 2083-04-27 | Nepal Electricity Authority | Darbarmarg,Kathmandu | Ratnapark s/s | Thapathali s/s | Double Ckt |
153 | Super Ghalemdi -Dana 33 kV Transmission Line Project | 33 | 5.8 | 9.14 | 654 | 2081-04-32 | 2083-04-31 | Super Ghalemdi Hydropower Pvt. Ltd. | Tangal , Kathmandu | switchyard of the project | NEA Dana S/S | |
154 | Tamor-Mewa HPP -Dhungesanghu 220kV Transmission Line Project | 220 | 7 | 128 | 655 | 2081-05-06 | 2083-05-05 | Spark Hydroelectric Company Ltd. | Gyaneswor,Kathmandu | Respective Switchyard of the project | Dhungesanghu s/s | Double Ckt |
155 | Mid Hongu B HPP 132kV Transmission line Project | 132 | 27 | 44.9 | 656 | 2081-05-23 | 2083-05-22 | Gauri Shanker Power Development Ltd | Naxal | Respective Switchyard of the project | Tingla S/S | Double Ckt |
156 | Syarpu SHP Transmission Line Project | 33 | 9 | 3.3 | 657 | 2081-05-28 | 2083-05-27 | Syarpu Power Company Limited | Musikot Rukum, 9851180511, opradip11@gmail.com | Switchyard of Project | Musikot S/S | Single Circuit |
157 | Duhabi Solar Farm 33 kV Transmission Line Project | 33 | 11 | 8 | 658 | 2081-05-30 | 2083-05-29 | Global Energy & Construction Pvt..Ltd | Naxal, Kathmandu | Respective Switchyard of the project | Duhabi s/s | Solar, Single ckt |
158 | Shyam Khola HPP 33 kV Transmission Line Project | 33 | 9.7 | 7.25 | 659 | 2081-06-02 | 2083-06-01 | S.K.Energy Development Ltd. | Jadibuti,Kathmandu | Respective Switchyard of the project | Shitalpati S/S | B.Pra.Sa.536 cancelled,Single ckt |
159 | Myagdi corridor 132 kV combined Transmission Line Project | 132 | 15.3 | 155.5 | 660 | 2081-06-06 | 2083-06-05 | Hydro Village Ltd. | Krishna galli,lalitpur | Switchyard of Myagdi Khola HPP | Dandakhet s/s | Double Ckt. Multi ckt |
160 | Mid Rawa HPP 33kV Transmission Line Project | 33 | 6.45 | 2.5 | 661 | 2081-06-06 | 2083-06-05 | Halesi Urja Pvt.Ltd | Anamnagar,Kathmandu | Respective Switchyard of the project | Wakshila s/s | Single Ckt |
161 | Induwa Khola PROR HPP 132 kV Transmission Line Project | 132 | 9 | 24.921 | 662 | 2081-06-06 | 2083-06-05 | Vision Tesla Power Pvt.Ltd. | Chabahil ,Kathamndu | Respective Switchyard of the project | Isuwa Khola Cascade PROR HPP | Single Ckt |
162 | Lamahi-Napalgunj 220kV Transmission Line Project | 220 | 83 | 2000 | 663 | 2081-06-06 | 2083-06-05 | NEA | Durbarmarg,Kathmandu | New Lamahi s/s | Bhawaniyapur s/s | Multi ckt |
163 | Thaligaad Sana Khola HPP 33kV Transmission Line Project | 33 | 0.5 | 2 | 664 | 2081-06-07 | 2083-06-06 | Trikal Power Company Pvt.Ltd | Shankhamul,Kathmandu | Respective Switchyard of the project | Dhap s/s | Single Ckt |
164 | Seti River-6 HPP 400kV Transmission Line Project | 400 | 29.37 | 420 | 665 | 2081-06-07 | 2083-06-06 | NHPC Limited | Faridaabad,India | Respective Switchyard of the project | Betan pooling Station | Double Ckt |
165 | Isuwa Khola PROR HPP 132 kV Transmission Line Project | 132 | 20 | 172.171 | 666 | 2081-06-16 | 2083-06-15 | Isuwa Energy Pvt.Ltd. | Hadigaun,Kathmandu | Respective Switchyard of the project | Shitalpati S/S | Double Ckt |
166 | Damak-Keroun- Biratnagar 132 kV Transmission line Project | 132 | 63 | 200 | 667 | 2081-06-18 | 2083-06-17 | Nepal Electricity Authority | Darbarmarg ,Kathmandu | Padjungi s/s | Biratnagar s/s | Double Ckt,Undergroung 7 km |
167 | Marsyangdi Nadi PROR - Markichowk 220 kV Transmission Line Project | 220 | 11.6 | 90 | 668 | 2081-07-02 | 2083-07-01 | M.A Power Pvt. Ltd. | Baluwatar , Kathmandu | switchyard of the project | NEA Markichowk S/S | single circuit |
168 | LapcheTamakoshi HPP 132 kV Transmission Line Project | 132 | 50.75 | 42 | 669 | 2081-07-02 | 2083-07-01 | Dynamic Hydro Energy Pvt.Ltd. | Gyaneshwor,Kathmandu | Respective Switchyard of the project | Barabise s/s | Double Ckt |