1 Upper Karnali Hydroelectric Project 400 kV Transmission Line 400 9006091 2072-03-20Karnali Transmission Company Pvt. Ltd. Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540659 Bhairabsthan, Accham Brahmadev, Kanchanpur Survey Lic No: 119 Date: 2067-03-23
2 Upper Marsyangdi-2 Hydroelectric Project 400 kV Transmission Line 400 6006093 2072-03-21Marsyangdi Transmission Company Pvt Ltd Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540660 Taghring, Lamjung Bodabar, Rupandehi Survey Lic No: 120 Date: 2067-03-23
3 Super Trishuli HP 220kV TR Line 220 30 1001538 2076-05-20Blue Energy P Ltd Darbar Marg Kathmandu, POB 9609, Ph 4233516 Switchyard Bharatpur substation Survey Lic No: 209 Date: 2071-05-26 Er.Vijay
4 Transmission line for Betan Karnali Construction Power 33 30 61144 2079-05-07Betan Karnali Sanchay Karta Hydropower Co. Ltd. Darbarmarg,Kathmandu Sugarkhal Substation(Surkhet Aachham ) Betan Karnali Project Site(Surkhet) Survey Lic No: 439 Date: 2076-09-04
5 Khare Khola Hydropower Project 132 9 24.13583 2079-09-06Consoriun Power Developers Pvt.Ltd. 316 Baburam Acharya Sadak ,Sinamangal -9 Kathmandu Switchyard of Hydropower Project (Dolkha Singati NEA Substation(Dolakha) Survey Lic No: 446 Date: 2076-09-20
6 Upper Lohore Khola Dailekh 33 kV Transmission Line Project 33 17 43148 2080-09-03Upper Lohore Khola Hydropower Co. Ltd. Buddhanagar Kathmandu-10 Switchyard of Project NEA Dailekh S/S Survey Lic No: 532 Date: 2078-11-23
7 Nalgad Maintada (Bheri Corridor) Transmission Line 400 75 24004920 2080-11-23Rastriya Prasaran Grid Company Limited Babarmahal, Kahmandu Proposed Nalgad S/S Proposed Maintada S/S Survey Lic No: 386 Date: 2075-11-26
8 Dudhkoshi Storage Transmission Line Project 400 90.9 6006301 2081-01-31Nepal Electricity Authority Main office,Darbarmarg,Kathmandu Switchyard of Dudhkoshi Storage HPP Dhalkebar NEA Substation Survey Lic No: 394 Date: 2076-02-03
9 Thimi Balkumari 132 kV Underground Transmission Line Project 132 8 3006897 2081-02-22Nepal Electricity Authority Durbar Marg, Kathmandu 01-4153007 NEA Thimi S/S NEA Proposed Balkumari Survey Lic No: 550 Date: 2079-02-27
10 Dhaubadi Meghauli 132 kV Transmission Line Project 132 15 2001772 2081-06-06Nepal Electricity Authority Durbar Marg, Kathmandu 01-4153007 Dhaubadi/Gaidakot Meghauli Survey Lic No: 581 Date: 2079-10-24
11 Inaruwa-Anarmani 400 kV Transmission Line Project 400 91 26001964 2081-06-11Nepal Electricity Authority Durbar Marg, Kathmandu 01-4153007 NEA Inaruwa S/S Proposed New Anarmani S/S Survey Lic No: 548 Date: 2079-02-06
12 Upper Sardi Khola Hydropower Project 33 3.3 2.93317 2081-08-09Mandakini Hydropower Ltd. Sinamangal-9 Kathmandu Swiychyard of Project (Kaski) Switchyard of Sardi HPP(4 MW) Survey Lic No: 422 Date: 2076-08-10
13 Trishuli 3B- Ratamate 220 kV Transmission Line Project 220 23.5 12343422 2081-08-13Nepal Electricity Authority Durbarmarg Kathmandu Trishuli 3B Hub S/S Ratamate S/S Survey Lic No: 652 Date: 2081-04-18
14 Upper Tamor Hydropower Project 220 5 2853653 2081-08-21Tamor Energy Pvt.Ltd. Kupondole,Lalitpur Switchyard of Project (Taplejung ) Switchyard of Madhya Tamor HPP Survey Lic No: 433 Date: 2076-08-25
15 Madhya Super Daraudi switchyard to Ghyampesal substation Transmission Line proje 33 18 103901 2081-09-02Barpak Daraudi Hydropower Pvt. Ltd. Kathmandu Switchyard of Project NEA Ghyampesal S/S Single ckt;Survey Lic No: 641 Date: 2081-02-04,
16 Tingla Hub to Dhalkebar 400 155 25004166 2081-09-12Nepal Electricity Authority Main office,Darbarmarg,Kathmandu Tingla Hub(Solukhumbu),Likhu,New Khimti Dhalkebar NEA Substation (Dhanusha) Survey Lic No: 442 Date: 2076-09-15
17 Lamosanghu Kavre Ramechap 132 36 2384167 2081-09-12Nepal Electricity Authority Main office,Darbarmarg,Kathmandu Lamosanghu(Sindhupalchowk) Proposed New Substation at Boundry of Ra Survey Lic No: 443 Date: 2076-09-16
18 Sabha Khola B to Sitalpati 132 kV Transmission Line Project 132 22 42.154215 2081-09-14Orbit Energy Limited Handigaun,kathmandu Switchyard of Sabha Khola B HPP Sitalpati S/S Survey Lic No: 632 Date: 2080-12-27 till 2082-12-26
19 Nepalgaunj Nanpara 132 kV Transmission Line Project 132 22.53 2005017 2081-10-14Nepal Electricity Authority Durbar Marg, Kathmandu 01-4153007 NEA New Nepalgaunj NEA Old Nepalgunj S/S Survey Lic No: 592 Date: 2079-12-20
20 Mid Hongu B HPP 132kV Transmission line Project 132 27 44.95109 2081-10-18Gauri Shanker Power Development Ltd Naxal Respective Switchyard of the project Tingla S/S Survey Lic No: 656 Date: 2081-05-23
21 Duhabi Solar Farm 33 kV Transmission Line Project 33 10.42 85878 2081-11-12Global Energy & Construction Pvt..Ltd Naxal, Kathmandu Respective Switchyard of the project Duhabi s/s Survey Lic No: 658 Date: 2081-05-30
22 Dhalkebar Solar PV Transmission Lone Project 33 5 55879 2081-11-12Green Infrastructure Pvt.Ltd Babarmahal, Kathmandu Respective Switchyard of the project NEA-Dhalkebar s/s Survey Lic No: 672 Date: 2081-07-25