Survey License :: Transmission Line
Updated on - Jan 05, 2025
Updated on - Jan 05, 2025
S No | Project | Voltage (kV) |
Line Length (km) | Capacity (MW) | Lic No | Isuue Date | Validity | Promoter |
Address | Start Point |
End Point |
Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Radhi small Hydropower 33kV Transmission line | 33 | 14 | 4.4 | 270 | 2073-08-27 | 2078-08-26 | Radhi Bidhyut Company Limited | Bluestar Complex, Tripureswor | Switchyard of Project | Khudi(Tarikuna) NEA Substation(Lamjung) | Single Circuit |
2 | Mathillo Lapche Khola HEP 132kV TL Project | 132 | 36 | 52 | 279 | 2073-10-23 | 2076-10-22 | Energy Venture Pvt. Ltd. | Tripureswor, PO box no. 23585 | Lamabagar, PH | Singati Substation | |
3 | Upper Naugad Gad Small HPP 33kV Transmission Line Project | 33 | 8 | 8 | 288 | 2074-02-01 | 2077-01-31 | Switchyard of Upper Naugad Gad Small HPP | Chameliya HPP, Balaanch S/S | |||
4 | Rawa Hydropower Project | 33 | 3.8 | 3 | 296 | 2074-04-31 | 2076-04-30 | Rawa Energy Development Pvt. Ltd. | Ghattekulo, Kathmandu, Ph. No. 01-4474165, 9851096066 | Switchyard at Sundel and Rakha Dipsun VD | Substation at Bakshila VDC | |
5 | Trishuli 3 B to Bhalche 33 kV transmission line | 33 | 12 | 6.4 | 309 | 2074-07-08 | 2077-07-07 | Nepal Electricity Authority | Durbarmarg, Kathmandu | Trishuli 3 B Hub substation(Nuwakot) | Bhalche substation (Nuwakot) | |
6 | Khimti to Dorambha Transmission Line | 33 | 19 | 8 | 337 | 2074-12-12 | 2076-12-11 | Nepal Electricity Authority | Durbarmarg, Kathmandu | Khimti Bazaar | Dormbha S/S | |
7 | Syaule to Bagarkot 33kV Tr.Ln. project in Dadeldhura District | 33 | 18 | 3 | 356 | 2075-03-27 | 2077-03-26 | Nepal Electricity Authority | Main office, Darbarmarg, Kathmandu | Syaule | Bagarkot | |
8 | Sangu Sarun khola HPP Dolkha District | 33 | 0.4 | 5 | 362 | 2075-05-14 | 2077-05-13 | Kalinchowk Hydro Power Pvt.Ltd. | UWTC, Tripureshwor, Kathmandu | Sangu Sarun HPP | Sangu HPP Substation | Er. Niroj |
9 | Singati HPP, Dolkha District | 132 | 0.5 | 25 | 364 | 2075-05-24 | 2077-05-23 | Singati Hydro Energy Ltd. | Naxal, Kathmandu , Nepal | Singati HPP | singati substation | Er. Niroj |
10 | Tallo Modi Khola Hydro Power Project, Parvat District | 132 | 5 | 20 | 373 | 2075-08-09 | 2077-08-08 | Shree Modi Energy Pvt.Ltd. | Dillibazzar, Kathmandu 4441131, 4441444, 01-2003887 | Switch yard of Tallo Modi Khola Hydro Po | Switchyard of Tallo Modi 1 HPP | First issued License(B.P.S 248) Cancelled on 2075-05-06 |
11 | Kasuwa Khola Hydro Power's Transmission Line Project | 132 | 28.6 | 45 | 380 | 2075-09-29 | 2080-09-28 | Kasuwa khola Hydro Power Ltd. | Tripureshwor, Nepal Tel: 4222609 | Switchyard of Kasuwa Khola Hydro Power P | Sitalpati NEA Substation | CANCELLED |
12 | Grid connected Butwl Solar Project | 33 | 5.5 | 8.5 | 393 | 2076-02-03 | 2078-02-02 | Ridi Hydro Power Development Co.Ltd. | Fifth Floor, Trade Tower, Thapahali , KTM | Switchyard of Project | Jogikuti Substation | |
13 | Thulo Khola Hydropower Project | 132 | 21 | 21.3 | 413 | 2076-05-18 | 2078-05-17 | Sungava Foundation Pvt.Ltd. | Sanepa-2, Lalitpur 9843311216 | Switchyard of Thulo Khola HPP(Myagdi) | Dana NEA Substation (Myagdi) | |
14 | Upper Trishuli Hydropower Project | 220 | 24 | 102 | 420 | 2076-07-27 | 2078-07-26 | Upper Trishuli Hydropower Pvt.Ltd. | kathmandu | Switchyard of Upper Trishuli-2 (Rasuwa) | NEA Trishuli 3B Hub(Nuwakot) | |
15 | Budhigandaki Corridor Fidim Gumda Ratmate Transmission Line Project | 400 | 85 | 4080 | 441 | 2076-09-15 | 2081-09-14 | Nepal Electricity Authority | Main office, Darbarmarg, Kathmandu | Fidim /Gumda (Gorkha) | Ratmate (Nuwakot) | |
16 | Damauli Kusma Bafikot 400kV Transmission Line Project | 400 | 226 | 4080 | 445 | 2076-09-16 | 2081-09-15 | Nepal Electricity Authority | Main office, Darbarmarg, Kathmandu | Damauli (Tanahu) | Bafikot(Rukum) | Double Circuit |
17 | Upper Rawa Khola Hydropower Project | 33 | 3.8 | 3 | 449 | 2076-10-12 | 2078-10-11 | Rawa Energy Development Pvt.Ltd. | Ghattekulo Kathmandu 9851096066 | Switchyard of Project (Khotang) | Baksila NEA Substation(Khotang) | |
18 | Phukot Karnali PROR HEP 400 KV TL | 400 | 2.5 | 480 | 454 | 2077-01-30 | 2082-01-29 | Vidhyut Utpadan CompNy Limited | BPC Building, Rudramatimarg Kathmandu, 01-4788680, info@vucl.org | Project Powerhouse | Phukot Substation | |
19 | Kimathanka Arun HEP Transmission Project | 400 | 18.5 | 450 | 456 | 2077-01-30 | 2082-01-29 | Vidyut Utpadan Company Limited | BPC Building, Rudramatimarg Kathmandu, 01-4788680, info@vucl.org | Switchyard of Project (Sankhuwasabha) | Haitar Substation (Kimathanka Arun Subst | |
20 | Upper Arun Hydro Electric 400 kV Transmission Line | 400 | 6.5 | 1066 | 460 | 2077-04-28 | 2082-04-27 | Upper Arun Hydro Electric Limited | Durbarmarg Kathmandu; 01-415322, Fax 01-4153040, E-mail: upperarun@nea.org.np | UAHE Plant Switchyard | Haitar S/S | |
21 | Chameliya (Chhetigad) HPP Transmission Line | 132 | 22 | 85 | 468 | 2077-05-24 | 2082-05-23 | Grid Nepal Company Pvt. Ltd. | Pandol Marg, Khursanitar Lazimpat, Kathmandu-03; | Switchyard of Project | NEA Balanch S/S | |
22 | Ikuwa Khola HPP Transmission Line Project | 132 | 3 | 30 | 477 | 2077-07-17 | 2082-07-16 | Upper Arun Hudro-Electric Limited | Durbar Marg, Kathmandu. 01-4117163/54/65; upperarun@nea.org.np | Switch yard of Project | Arun Hub Substation Haitar | |
23 | Nyasim Khola Hydropower Transmission Line Project | 132 | 8 | 35 | 479 | 2077-08-10 | 2082-08-09 | Sita Hydro Power Company Pvt. Ltd. | Kalimati-13, Kathmandu; 01-4672442, sitahydro@gmail.com | Switchyard of Project | NEA Pantan S/S Sindhupalchowk | Double Circuit |
24 | Ghunsa Khola HEP Construction Power Transmission Line | 33 | 35 | 5 | 486 | 2077-09-26 | 2081-09-25 | Remit Hydro Ltd. | Maharajgunj , Kathmandu-03; 01-4424954, 4430986 | NEA Hiti S/S | Power House Site of Ghunsa HEP | Double Circuit |
25 | West Seti Corridor (West Seti-Dododhara) 400 kV Transmission Line Project | 400 | 68 | 1500 | 487 | 2077-10-06 | 2081-10-05 | Rastriya Prasaran Grid Company Limited | DCC Bhawan Babarmahal, Kathmandu; 01-4266693; rpgcl.np@gmail.com | Proposed West Seti S/S | Proposed New Attariya S/S | Double Circuit |
26 | Kaseni-CG Sardewa 33 kV Transmission Line | 33 | 8 | 20 | 489 | 2077-11-03 | 2079-11-02 | CG Cement Industries Palpa Pvt. Ltd. | Chaudhary House Sanepa-02 Lalitpur, 01-5525039/41 | NEA Ridi S/S, Kaseni | CG Cement Sardewa | Double Circuit |
27 | Lamhai Chhinchu 400kV Transmission Line Project | 400 | 94 | 1933 | 497 | 2078-04-07 | 2082-04-06 | Nepal Electricity Authority | Durbar Marg Kathmandu | Lamhai S/S | Proposed Chhichu S/S | Double Circuit |
28 | Chhinchu Dododhara 400 kV Transmission Line Project | 400 | 90 | 1933 | 500 | 2078-04-29 | 2082-04-28 | Nepal Electricity Authority | Durbar Marg Kathmandu | Proposed Chhinchu S/S | Proposed Dododhara S/S | Double Circuit |
29 | Sitalpati-Inaruwa 400 kV Transmission Line Project | 400 | 130 | 4400 | 506 | 2078-06-15 | 2082-06-14 | Nepal Electricity Authority | Durbar Marg Kathmandu | NEA Sitalpati S/S | NEA Inaruwa S/S | Double Circuit |
30 | Arun Hub (Sitalpati) -Tingla-Dudhkoshi 400 kV Transmission Line Project | 400 | 115 | 4400 | 507 | 2078-06-24 | 2082-06-23 | Nepal Electricity Authority | Durbar Marg Kathmandu | Sitalpati S/S | Proposed Dudhkoshi S/S | Double Circuit |
31 | Jum Khola Transmission Line Project | 132 | 37 | 56 | 508 | 2078-06-24 | 2082-06-23 | Sanima Jum Hydropower Ltd. | P.O.Box: 19737 Dhumbarahai, KTM 01-4373030; sanima@sanimahydro.com | Switchyard of Project | NEA Garjyang S/S | Double Circuit |
32 | Simbuwa 220 kV Transmission Line Project | 220 | 3.2 | 70.3 | 509 | 2078-07-22 | 2082-07-21 | Simbuwa Remit Hydro Ltd. | Maharajgunj , Kathmandu-03; 01-4445857, info@srhl.org.np | Switchyard of Project | Switchyard of Ghunsa Khola HEP | Double Circuit |
33 | Lamabagar Barhabise 220kV Transmission Line Project | 220 | 43 | 1240 | 511 | 2078-07-25 | 2082-07-24 | Rastriya Prasaran Grid Company Limited | DCC Bhawan Babarmahal, Kathmandu; 01-4266693; rpgcl.np@gmail.com | Proposed Lamabagar S/S | NEA Barhabise S/S | Double Circuit |
34 | Yampa Phat- Saranghat Transmission Line Project | 33 | 19.5 | 4.8 | 513 | 2078-08-14 | 2080-08-13 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Yampa Phat | Proposed Sarangghat S/S | Single Circuit |
35 | Khairenitar Ghiring Transmission Line Project | 33 | 18 | 4.8 | 515 | 2078-08-16 | 2080-08-15 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | NEA Kahiranitar S/S | NEA Ghiring S/S | Single Circuit |
36 | Phukot Karnali PROR Dam Toe Power Plant Transmission Line Project | 33 | 6 | 6 | 529 | 2078-11-08 | 2081-11-07 | Vidhyut Utpadan Company Limited | Buddhanagar Kathmandu-10; 01-4788680, info@vucl.org | Switchyard of Dam Toe HPP | Switchyard of PROR Project | Double Circuit |
37 | Nijgad Pokhariya Transmission Line Project | 400 | 75 | 2000 | 530 | 2078-11-12 | 2081-11-11 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Proposed Nijgad S/S | Proposed Pokhariya S/S | Double Circuit |
38 | 33 kV Transmission Line for Rolwaling Khola HPP | 33 | 8.4 | 20.66 | 531 | 2078-11-16 | 2081-11-15 | Upper Tamakoshi Hydropower Limited | Gyaneshwor, Kathmandu; 01-4420658, office@utkhpl.org.np | Switchyard of Project | UTKHPP S/S Gongar | |
39 | Lower Apsuwa Hydropower Transmission Line Project | 132 | 19 | 54 | 534 | 2078-12-07 | 2081-12-06 | Mizu Energy Ltd. | Hyatt Place Soalteemode KTM; 01-4671200 | Switchyard of Project | NEA Sitalpati S/S | Double Circuit |
40 | 33 kV Transmission Line for Upper Deumai Hydropower Project (8.3MW) | 33 | 9 | 8.3 | 541 | 2079-01-11 | 2082-01-10 | Water Energy Solution Pvt. Ltd. | Gatthaghar Madhyapur Thimi, Bhaktapur, Ph. No. 9854040509, email:- upperdeumai@g | Switchyard of Upper Deumai Khola SHEP | Chisapani Substation Ilam | Single circuit |
41 | Upper Irkhuwa Transmission Line Project | 33 | 10.2 | 30.024 | 543 | 2079-01-11 | 2082-01-10 | Arati Power Company Limited | Gahanapokhari, KTM-05; 01-4419321 | Switchyard of Project | NEA Sitalpati S/S | Single Circuit, Mathillo Irkhuwa khola(14.5)+Irkhuwa khola B(15.524) |
42 | Grid connected solar power project 11kV transmission line | 11 | 4 | 2 | 556 | 2079-04-08 | 2081-04-07 | Sourya Vidhyut Power Pvt. Ltd. | Narayanchaur, Naxal-01, Kathmandu | Switchyard of the project | 33/11 Kv NEA Parasi substation | Single Circuit |
43 | Upper Mardi Khola Hydro Power Transmission Line Project | 33 | 12 | 7 | 558 | 2079-04-18 | 2082-04-17 | United Idi Mardi and RB Hydropower Ltd. | Lekhnath-7, Pokhara; unitedidimardi7mw@gmail.com, 061-465806, 01-5012027 | Switchyard of Project | NEA Lahacowk S/S | Single Circuit |
44 | Chhujung Khola & Bakan Khola Joint 220 kV Transmission Line Project | 220 | 55 | 107 | 560 | 2079-05-02 | 2082-05-01 | Sangrila Urja Pvt. Ltd. | Anamnagar 29 Kathmandu, 9851175012 | Switchyard of Chhujung Khola Project | NEA Sitalpati S/S | Double Circuit |
45 | Darbang Myagdi HEP Transmission Line Project | 132 | 6.3 | 25 | 561 | 2079-05-08 | 2082-05-07 | Dhaulagiri Kalika Hydro Pvt. Ltd. | Gyaneswor 30, KTM, 01-4536819, info@darbanghydro.com | Switchyard of Project | NEA Dadakhet S/S | Single Circuit |
46 | Grid Solar and Energy efficiency Project | 33 | 9.28 | 16.66 | 562 | 2079-05-17 | 2081-05-16 | Nepal Electricity Authority | Durbarmarg, Kathmandu | Bharatpur-12 Godrang | Bharatpur-6 Devnagar | Single circuit |
47 | Khorunga Khola Small HEP Transmission Line Project | 33 | 3.47 | 4.8 | 564 | 2079-05-28 | 2081-05-27 | Reliable Hydro Power Co. Pvt. Ltd. | Jawalakhel Lalitpur, POB 516; 015551616 | Switchyard of Project | NEA Jiri Khimti S/S | Single Circuit |
48 | West Seti (Banlek) Dododhara Transmission Line Project | 400 | 80 | 2250 | 568 | 2079-07-20 | 2082-07-19 | Rastriya Prasaran Grid Company Limited | Bbarmahal-11 Kathmandu; 01-4266693 | Proposed West Seti S/S | Proposed Dododhara S/S | Double Circuit |
49 | Sitalpati Dhungesanghu Transmission Line Project | 220 | 48 | 600 | 570 | 2079-07-28 | 2081-07-27 | Rastriye Prasaran Grid Company Limited | Babarmahal-11 Kathmandu; 01-4266693 | NEA Sitalpati S/S | NEA Dhungesanghu S/S | Double Circuit |
50 | Mugu Karnali 400kV Transmission Line Project | 400 | 40 | 1902 | 571 | 2079-08-06 | 2082-08-05 | Vidhyut Utpadan Company Limited | BPC Building Rudramati Marg, Buddhanagar KTM-10 | Switchyard of Project | RPGCL Phukot S/S | Double Circuit |
51 | Dhaubadi Iron Mines Transmission Line Project | 220 | 12 | 510 | 574 | 2079-09-13 | 2081-09-12 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Tower No 107 & 108 of 220 kV H-B TL | Dhaubadi S/S | Multi Circuit |
52 | Sona Khola 33 kV Transmission Line Project | 33 | 6 | 9 | 578 | 2079-10-04 | 2081-10-03 | Himali Hydro Fund Ltd. | Mid Baneswor Kathmandu-32; 014109156 | Switchyard of Project | Mewa S/S | Single Circuit |
53 | 220 kV Transmission Line for Chainpur Seti HEP | 220 | 15 | 210 | 583 | 2079-11-03 | 2081-11-02 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Switchyard of Project | Proposed Bajhang S/S | Double Circuit |
54 | Auraha Simara 132 kV Transmission Line Project | 132 | 7 | 200 | 584 | 2079-11-12 | 2081-11-11 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Between T.N. 25&26 of Pathalaiya Parwani | Simara S/S | Multi Circuit |
55 | LILO of Tanhu-Bharatpur Transmission Line with Damauli-Lekhnath Transmission Lin | 220 | 0.98 | 150 | 585 | 2079-11-15 | 2081-11-14 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Tanhu Bharatpur TL@Byas Tanhu | Damauli Lekhnath TL@Byas Tanhu | Multi Circuit |
56 | Attariya Dhangadhi 132 kV Transmission Line Project | 132 | 16.4 | 200 | 586 | 2079-12-01 | 2081-11-30 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Attariya S/S | Dhangadhi S/S | Double Circuit |
57 | Madkyu Khola Transmission Line Project | 33 | 14 | 13 | 587 | 2079-12-01 | 2081-11-30 | Sikles Hydropower Ltd. | Lekhnath-7, Pokhara | Switchyard of Project | Upper Madi HEP Switchyard | Double Circuit |
58 | Khimti Rakathum 132 kV Transmission Line Project | 132 | 29 | 238 | 588 | 2079-12-09 | 2081-12-08 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Proposed Rakathum S/S | NEA New Khimti S/S | Double Circuit |
59 | Phukot Ranchuli 132 kV Transmission Line Project | 132 | 36 | 238 | 589 | 2079-12-09 | 2081-12-08 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Phukot S/S | Ranchuli S/S | Double Circuit |
60 | Dukuchhap New Teku 220 kV transmission Line Project | 220 | 12 | 1200 | 590 | 2079-12-09 | 2081-12-08 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Proposed Dukuchap S/S | Proposed Teku S/S | Multi/Double Circuit |
61 | Matatirtha-Dukuchhap 220 kV Transmission Line | 220 | 12 | 1200 | 591 | 2079-12-12 | 2081-12-11 | Nepal Electricity Authority | Durbarmarg, kathmandu | Matatirtha S/S | Bifurcation Point (Dukuchhap-New Teku 22 | Double Circuit, Twin Moose Conductor |
62 | Nepalgaunj Nanpara 132 kV Transmission Line Project | 132 | 23.5 | 200 | 592 | 2079-12-20 | 2081-12-19 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | NEA Nepalgaunj | NEA Janaki S/S | Double/Multi Circuit |
63 | Bajhang Banlek (West Seti) 400 kV Transmission Line Project | 400 | 55 | 1130 | 593 | 2079-12-20 | 2081-12-19 | Rastriya Prasaran Grid Company Limited | BPC complex Buddhanagar Kathmandu, 01-4610103 | Bajhang S/S | Banlek S/S | Double Circuit |
64 | Hewa A Small HEP 33kV Transmission Line Project | 33 | 10 | 5 | 594 | 2079-12-20 | 2081-12-19 | Habitat Power Co. Pvt. Ltd. | Chabahil, Kathmandu-7, 015242384 | Switchyard of Project | NEA Phidim S/S | Single Circuit |
65 | Madhya Tara Khola 33 kV Transmission Line | 33 | 5.2 | 2.2 | 595 | 2080-01-10 | 2082-01-09 | Madhya Tarakhola Hydropower Pvt. Ltd. | New Baneshwor-10, Kathmandu, Phone No. 01-4785232, email-madhya.tarakhola@gmail. | Madhya Tara Khola Switchyard | Daram Khola A Switchyard | Single Circuit |
66 | Okharpauwa Tinpiple 220 kV Transmission Line Project | 220 | 4 | 1100 | 596 | 2080-01-26 | 2082-01-25 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Okharpauwa | Tinpiple S/S | Multi Circuit |
67 | Mewa Kola 132 k V Transmission Line Project | 132 | 5 | 23 | 597 | 2080-02-05 | 2082-02-04 | Union Mewa Hydro Limited | Lalitpur-2, Kupandole 01-5911208 | Switchyard of Project | Mewa khola s/s | Single Circuit |
68 | Dukuchahap Sirutar Nalagumba Lapshiphedi 220 kV Transmission Line | 220 | 31 | 1083 | 598 | 2080-02-05 | 2082-02-04 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Dukuchap | Lapsiphedi | Double Circuit, Twin Moose Consuctor |
69 | Laphsiphedi-Kapan Gumba- Tinpiple 220 kV TL | 220 | 36.5 | 1083 | 599 | 2080-02-21 | 2082-02-20 | Nepal Electricity Authority | Durbarmarg. kathmandu | Laphsiphedi S/S | Tinpiple S/S | Double Circuit with Substation at Kapan Gumba |
70 | Syaule Sanphebagar 132 kV Transmission Line Project | 132 | 70 | 200 | 601 | 2080-03-07 | 2082-03-06 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | NEA Syaule S/S | Proposed Sanphebagar S/S | Double Circuit |
71 | Karuwa Seti HEP Transmission Line Project | 132 | 11 | 32 | 602 | 2080-03-08 | 2082-03-07 | Jhyamolongma Hydropower Development company Ltd. | Pokhara Lekhnath -11 Kaski, 061-465806 | Switchyard of Project | Switchyard of Seti Nadi HEP | Double Circuit |
72 | Balefi A HEP Transmission Line Project | 33 | 14 | 22.14 | 603 | 2080-03-13 | 2082-03-12 | Moonlight Hydropower Co Ltd. | Kalopool-07, KTM 01-4562844 | Switchyard of Project | NEA Barhabise S/S | double Circuit |
73 | Balaju Singhdurbar (K3) Under Ground Transmission Line Project | 132 | 12 | 350 | 604 | 2080-03-13 | 2082-03-12 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Balaju S/S | Singhdurbar K3 S/S | Double Circuit |
74 | Teku Thapathali 132 kV Underground Transmisssion Line Project | 132 | 2 | 350 | 605 | 2080-03-26 | 2082-03-25 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Teku S/S | Thapathali S/S | Double Circuit |
75 | Sirutar Harisiddhi Patan Underground Transmission Line Project | 132 | 11.64 | 340 | 607 | 2080-04-09 | 2082-04-08 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | SIrutar S/S | Patan S/S | Double Circuit |
76 | Super Lower Bagmati Transmission Line Project | 132 | 30 | 41.86 | 608 | 2080-04-15 | 2082-04-14 | Super Bagmati Hydropower Pvt. Ltd. | Rabibhawan Kathmandu; 01-4670518 | Switchyard of Project | NEA Chandrapur S/S | Single Circuit |
77 | Bhaktapur Sirutar 132 kV Under Ground Transmission Line Project | 132 | 7 | 200 | 609 | 2080-05-07 | 2082-05-06 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Bhaktapur S/S | Sirutar S/S | Double Circuit |
78 | Chulepu Khola Transmission Line project | 33 | 13 | 8.52 | 610 | 2080-05-24 | 2082-08-23 | Chandeswari Mahadev Khola Micro Hydro Pvt. Ltd. | Bhaktapur | Switchyard of Project | Bamati S/S | Single Circuit |
79 | Bhotekoshi-1 HEP Transmission Line Project | 132 | 1.4 | 40 | 611 | 2080-05-24 | 2082-05-23 | Electro Power Co. Ltd. | Baneswor 31, KTM; 01-4444947 | Switchyard of Project | TL of Upper Chaku A T.N. 6 | Double Circuit |
80 | Istul Khola SHP Transmission Line Project | 33 | 6.84 | 1.506 | 612 | 2080-06-16 | 2082-06-15 | Amar Jyoti Hydropower Pvt. Ltd. | Tahachal Kathmandu-13; 9851191418 | Switchyard of Project | NEA Masel S/S | Single Circuit |
81 | Dododhara New Attariya (Daijee) Transmission Line and Substation Project | 400 | 103 | 2000 | 614 | 2080-06-29 | 2082-06-28 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | RPGCL Dododhara | NEA New Attsariya | Double Circuit |
82 | Myagadi Corridor combined 33 kV Construction Power Transmission Line | 33 | 15.1 | 4 | 615 | 2080-06-29 | 2082-06-28 | Hydro Village Pvt. Ltd. | Krishna Galli Lalitpur; 01-5423960 | Headwork of Upper Myagdi-1 HEP | Headworks of Myagdi Khola HEP | Single Circuit |
83 | EIlep Tatopani HEP Transmission Line Project | 132 | 27 | 25 | 616 | 2080-07-03 | 2082-07-02 | Jalshakti Hydro Company Pvt. Ltd. | Kathmandu-02, Lazimpat | Switchyard of Project | Trishuli 3B Hub Substation | Single Circuit |
84 | Balaju Syuchatar 132 kV Under Ground Transmission Line Project | 132 | 4.82 | 300 | 617 | 2080-07-21 | 2082-07-20 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Balaju S/S | Syuchatar S/S | Double Circuit |
85 | Humla Phukot Transmission Line Project | 400 | 85 | 2250 | 618 | 2080-08-10 | 2082-08-09 | Rastriya Prasaran Grid Company Limited | Buddhanagar Kathmandu-10;01-4610103, info@rpgcl.com | Humala S/S | Phukot S/S | Double Circuit |
86 | Singhadurbar Maitidevi Chabahilll 132 kV Under Ground Transmission Line Project | 132 | 4.73 | 300 | 619 | 2080-08-10 | 2082-08-09 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Singhadurbar K3 S/S | Chabahill S/S | Double Circuit |
87 | Chabahil Kapan Gumba 132 kV Transmission Line Project | 132 | 6.75 | 300 | 620 | 2080-08-12 | 2082-08-11 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Chabahil S/S | Kapan Gumba S/S | Double Circuit |
88 | Super Melamchi Hydro Power Transmission Line Project | 132 | 20 | 23.6 | 621 | 2080-09-08 | 2082-09-07 | Milarepa Energy Pvt. Ltd, | Bajramarg Ramhiti Baudha-6 Kathmandu | Switchyard of Project | NEA Samundratar S/S | Single Circuit |
89 | Manang Marshyangdi Hydro Transmission Line Project | 220 | 2.5 | 135 | 622 | 2080-09-24 | 2082-09-23 | Manang Marshyangdi Hydropower Co. Pvt. Ltd. | 253 Kantuhiti Marga, Sanepa-02 Lalitpur Neapal | Switchyard of Project | NEA Dharapani S/S | Double Circuit |
90 | Upper Sankhuwa Khola Transmission Line Project | 132 | 19 | 40 | 623 | 2080-10-09 | 2082-10-08 | Happy Energy Pvt. Ltd. | Hadigaoun Kathmandu 01-4426248 | Switchyard of Project | NEA Sitalpati S/S | |
91 | Dar Khola HPP 33 kV Transmission Line Project | 33 | 7 | 6.5 | 624 | 2080-11-03 | 2082-11-02 | Dar Khola Hydropower Pvt. Ltd. | Samakhusi Kathmandu | Switchyard of Darkhola HPP | NEA Dadakhet S/S | Single Circuit |
92 | Mid Hongu Khola A - Mid Hongu Khola B 132 kV Transmission Line Project | 132 | 5.6 | 22 | 625 | 2080-11-04 | 2082-011-03 | Apex Makalu HPL | New Baneswor KTM; apex.makalu@gmail.com | Switchyard of Project | S/Y of Md Hongu Khola B | Single Circuit |
93 | Tamor Khola-5 to Dhungesanghu Transmission Line Project | 132 | 29 | 37.52 | 626 | 2080-12-04 | 2082-12-03 | River Side Hydro Energy Ltd. | Kathmandu-30, Dillibazar; 01-4527090 | Switchyard of Project | NEA Dhungesanghu S/S | Single Circuit |
94 | Himal Iron & Steel Factory to Parwanipur Transmission Line Project | 132 | 1.4 | 30 | 628 | 2080-12-07 | 2082-12-06 | Himal Iron and Steel Pvt. Ltd. | Jyoti Bhawan, Kantipath KTM, 01 4226327 | NEA Parwanipur S/S | Himal Factory Premises | Single Circuit |
95 | Doodhkoshi Dam Toe - Sitalpati Tingla Doodhkoshi Transmission Line AP51-52 Proje | 400 | 1.5 | 500 | 629 | 2080-12-08 | 2082-12-07 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Switchyard of Dam Toe Project | LILO at S-T-D 400kV Line | Double Circuit |
96 | Surke Doodhkoshi New Khimti Transmission Line Project | 220 | 66.6 | 188 | 630 | 2080-12-08 | 2082-06-07 | Summit Power Company Pvt. Ltd. | TRipureshwor Kathmandu | Switchyard of Project | New Khimti S/S | Double Circuit |
97 | Super Seti Lahachowk Transmission Line Project | 132 | 18 | 24 | 631 | 2080-12-08 | 2082-12-07 | SN Energy Pvt. Ltd. | Mahalaxmi-6, Lalitpur. 01-5913982 | Switchyard of Super Seti Project | NEA Lahacowk S/S | Single Circuit |
98 | Kasuwa Khola-Sitalpati 132 kV Transmission Line Project | 132 | 29 | 45 | 633 | 2080-12-27 | 2082-12-26 | Kasuwa Khola Hydropower Limited | Tripureswor-11, Kathmandu; 01-4101140 | Switchyard of Project | NEA Sitalpati S/S | Single Circuit |
99 | Dana khola - Dharapani Transmission Line Project | 220 | 5.5 | 49.95 | 634 | 2080-12-27 | 2082-12-26 | Lalupate Hydropower Company Pvt. Ltd. | Bagbazar Kathmandu 01-4251037 | Switchyard of Project | NEA Dharapani S/S | Single Circuit |
100 | Super Iwa Khola- Amarpur Transmission Line Project | 33 | 24 | 4.795 | 635 | 2080-12-27 | 2082-12-26 | Kanchanjangha Hydro Energy Pvt. Limited | Koteswor Kathmandu | Switchyard of Project | NEA Amarpur S/S | Single Circuit |
101 | West Seti Switchyard to West Seti Hub Sub Station Transmission Line Project | 400 | 4.5 | 750 | 637 | 2081-01-27 | 2083-01-26 | NHPC Limited | Sector 33 Faridabad Haryana India | Switchyard of WS Project | RPGCL Banlek S/S | Double Circuit |
102 | Nalgad Bafikot 400 kV Transmission Line Project | 400 | 20 | 2250 | 638 | 2081-01-27 | 2083-01-26 | Rastriya Prasaran Grid Company Limited | Buddhanagar Kathmandu-10; 01-4610103, info@rpgcl.com | Nalgad S/S | Bafikot S/S | Double Circuit |
103 | Upper Balephi Pantang Transmission Line Project | 132 | 11 | 46 | 639 | 2081-01-27 | 2083-01-26 | Upper BAlephi Hydropower Ltd. | Ratopul Kathmandu | Switchyard of Project | NEA Pantang S/S | Single Circuit |
104 | Sankhuwa Khola- Sitalpati Transmission Line Project | 132 | 4 | 41.06 | 636 | 2081-01-28 | 2083-01-27 | Guras Hydro Pvt. Ltd. | Bhanimandal, Lalitpur-4; 01-5535015 | Switchyard of Project | NEA Sitalpati S/S | Single Circuit |
105 | Upper Junbesi- Lower Dudhkunda- Tingla 33 kV Transmission Line Project | 33 | 25 | 14.18 | 640 | 2081-02-04 | 2083-02-03 | Gorkhas Himalyan Hydro Ltd. | Kathmandu-31 | Switchyard of Upper Junbesi HPP | NEA Tingla S/S | Double Circuit |
106 | Plaun Kola - Dhungesangu 132 kV Transmission Line Project | 132 | 22 | 21 | 642 | 2081-02-30 | 2083-02-29 | Palun Khola Hydropower Limited | Lalitpur-10, Kupandole; 01-4527090 | Switchyard of Project | NEA Dhungesanghu S/S | Single Circuit |
107 | Nyadi Phidi HPP Switchyard - Nyadi HPP Switchyard | 132 | 14 | 21.4 | 643 | 2081-02-31 | 2083-02-30 | North Summit Hydro Limited | Babarmahal-11 , Kathmandu | Nyadi Phidi HPP Switchyard | Nyadi HPP Switchyard | single circuit |
108 | Kalika Kaligandaki - New Bharatpur Transmission Line Project | 132 | 12 | 38.16 | 644 | 2081-02-31 | 2083-02-30 | Maula Kalika Hydropower Company Ltd. | New Baneswor Kathmandu 01-5913897 | Switchyard of Project | New Bharatpur S/S | Single Circuit |
109 | Upper Bramhayani - Pangtang 132 kV Transmission Line Project | 132 | 16 | 51.67 | 645 | 2081-03-11 | 2083-03-10 | Intergreted Hydro Fund Nepal Pvt. Ltd. | Kathmandu | switchyard of Upper Bramhayani | NEA Pangtang S/S | Upper Bramhayani switchyard- Bramhyanai switchyard- NEA Pangtang S/S |
110 | Bajhang Mathillo Seti HPP-Lamki Substation 132 kV Transmission Line Project | 132 | 140 | 216 | 646 | 2081-03-21 | 2083-03-20 | Samriddhi Energy Ltd. | Anamnagar, Kathmandu | switchyard of the project | NEA lamki S/S | Double circuit |
111 | Dhansar-Harnaiya 400kV Transmission Line Project | 400 | 35 | 1000 | 647 | 2081-03-27 | 2083-03-26 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Dhansar NEA Substation | Harniya NEA Substation | Double Circuit |
112 | Lower Mid Rawa Khola HPP -Wakshila 33 kV Transmission line Project | 33 | 7 | 4 | 648 | 2081-04-08 | 2083-04-07 | Lower Mid Rawa Khola HPP, Pvt.Ltd | Maharajgunj, Kathmandu | Respective Switchyard of the project | Wakshila s/s | Single Ckt |
113 | Aayu Malun to Tingla Transmission Line Project | 132 | 18.5 | 21 | 649 | 2081-04-13 | 2083-04-12 | Puwa Khola-1 Hydropower Ltd | Anamnagar Kathmandu-29; 01-4102710 | Switchyard of Project | NEA Tingla S/S | Single Circuit |
114 | Mathilo Maiwa HPP- Dhungesanghu 132 kV Transmission Line Project | 132 | 5 | 17.85 | 650 | 2081-04-15 | 2083-04-14 | Kang Hydropower Company Ltd. | Koteshwor, Kathmandu | Respective Switchyard of the project | Dhungesanghu s/s | Single Ckt |
115 | Mathillo Tadi HPP- Samundratar 33 kV Transmission Line Project | 33 | 7 | 11 | 651 | 2081-04-16 | 2083-04-15 | Suryakunda Hydroelectric Limited | Trade Tower, Thapathali, Kathmandu | switchyard of the project | NEA Samundratar S/S | Double circuit |
116 | Ratnapark -Thapathali Underground 132 kV Transmission Line Project | 132 | 2.4 | 340 | 653 | 2081-04-28 | 2083-04-27 | Nepal Electricity Authority | Darbarmarg, Kathmandu | Ratnapark s/s | Thapathali s/s | Double Ckt |
117 | Super Ghalemdi -Dana 33 kV Transmission Line Project | 33 | 5.8 | 9.14 | 654 | 2081-04-32 | 2083-04-31 | Super Ghalemdi Hydropower Pvt. Ltd. | Tangal , Kathmandu | switchyard of the project | NEA Dana S/S | |
118 | Tamor-Mewa HPP -Dhungesanghu 220kV Transmission Line Project | 220 | 7 | 128 | 655 | 2081-05-06 | 2083-05-05 | Spark Hydroelectric Company Ltd. | Gyaneswor, Kathmandu | Respective Switchyard of the project | Dhungesanghu s/s | Double Ckt |
119 | Syarpu SHP Transmission Line Project | 33 | 9 | 3.3 | 657 | 2081-05-28 | 2083-05-27 | Syarpu Power Company Limited | Musikot Rukum, 9851180511, opradip11@gmail.com | Switchyard of Project | Musikot S/S | Single Circuit |
120 | Duhabi Solar Farm 33 kV Transmission Line Project | 33 | 11 | 8 | 658 | 2081-05-30 | 2083-05-29 | Global Energy & Construction Pvt..Ltd | Naxal, Kathmandu | Respective Switchyard of the project | Duhabi s/s | Solar, Single ckt |
121 | Shyam Khola HPP 33 kV Transmission Line Project | 33 | 9.7 | 7.25 | 659 | 2081-06-02 | 2083-06-01 | S.K.Energy Development Ltd. | Jadibuti, Kathmandu | Respective Switchyard of the project | Shitalpati S/S | B.Pra.Sa.536 cancelled, Single ckt |
122 | Myagdi corridor 132 kV combined Transmission Line Project | 132 | 15.3 | 155.5 | 660 | 2081-06-06 | 2083-06-05 | Hydro Village Ltd. | Krishna galli, lalitpur | Switchyard of Myagdi Khola HPP | Dandakhet s/s | Double Ckt. Multi ckt |
123 | Mid Rawa HPP 33kV Transmission Line Project | 33 | 6.45 | 2.5 | 661 | 2081-06-06 | 2083-06-05 | Halesi Urja Pvt.Ltd | Anamnagar, Kathmandu | Respective Switchyard of the project | Wakshila s/s | Single Ckt |
124 | Induwa Khola PROR HPP 132 kV Transmission Line Project | 132 | 9 | 24.921 | 662 | 2081-06-06 | 2083-06-05 | Vision Tesla Power Pvt.Ltd. | Chabahil , Kathamndu | Respective Switchyard of the project | Isuwa Khola Cascade PROR HPP | Single Ckt |
125 | Lamahi-Napalgunj 220kV Transmission Line Project | 220 | 83 | 2000 | 663 | 2081-06-06 | 2083-06-05 | NEA | Durbarmarg, Kathmandu | New Lamahi s/s | Bhawaniyapur s/s | Multi ckt |
126 | Thaligaad Sana Khola HPP 33kV Transmission Line Project | 33 | 0.5 | 2 | 664 | 2081-06-07 | 2083-06-06 | Trikal Power Company Pvt.Ltd | Shankhamul, Kathmandu | Respective Switchyard of the project | Dhap s/s | Single Ckt |
127 | Seti River-6 HPP 400kV Transmission Line Project | 400 | 29.37 | 420 | 665 | 2081-06-07 | 2083-06-06 | NHPC Limited | Faridaabad, India | Respective Switchyard of the project | Betan pooling Station | Double Ckt |
128 | Isuwa Khola PROR HPP 132 kV Transmission Line Project | 132 | 20 | 172.171 | 666 | 2081-06-16 | 2083-06-15 | Isuwa Energy Pvt.Ltd. | Hadigaun, Kathmandu | Respective Switchyard of the project | Shitalpati S/S | Double Ckt |
129 | Damak-Keroun- Biratnagar 132 kV Transmission line Project | 132 | 72 | 200 | 667 | 2081-06-18 | 2083-06-17 | Nepal Electricity Authority | Darbarmarg , Kathmandu | Padjungi s/s | Biratnagar s/s | Double Ckt, Undergroung 7 km |
130 | Marsyangdi Nadi PROR - Markichowk 220 kV Transmission Line Project | 220 | 11.6 | 90 | 668 | 2081-07-02 | 2083-07-01 | M.A Power Pvt. Ltd. | Baluwatar , Kathmandu | switchyard of the project | NEA Markichowk S/S | single circuit |
131 | LapcheTamakoshi HPP 132 kV Transmission Line Project | 132 | 50.75 | 42 | 669 | 2081-07-02 | 2083-07-01 | Dynamic Hydro Energy Pvt.Ltd. | Gyaneshwor, Kathmandu | Respective Switchyard of the project | Barabise s/s | Double Ckt |
132 | Dudhkoshi 6 HEP Transmission Line Project | 220 | 67 | 171 | 671 | 2081-07-05 | 2083-07-04 | Sagarmatha Hydropower Pvt. Ltd. | Heritage Plaza, Kamaladi-28 KTM, 01-442672 | Switchyard of Project | NEA New Khimti S/S | Double Circuit |
133 | Dhalkebar Solar PV Transmission Lone Project | 33 | 5 | 5 | 672 | 2081-07-25 | 2083-07-24 | Green Infrastructure Pvt.Ltd | Babarmahal, Kathmandu | Respective Switchyard of the project | NEA-Dhalkebar s/s | Single Ckt |
134 | Super Ankhukhola HPP 132kv Transmission Line Project | 132 | 4.09 | 25.4 | 673 | 2081-08-02 | 2083-08-01 | Gorakshya Hydropower Limited | Pinglasthan, Kathmandu | Respective Switchyard of the project | LILO switchyard of ILEP(Tatopani) | Single Ckt |
135 | Upper Trishuli-1 Cascade HPP Transmission Line Project | 132 | 8 | 24.6 | 674 | 2081-08-13 | 2083-08-12 | Trishuli Cascade Power Pvt.Ltd | Naxal Colony Marg, Kathmandu | Respective Switchyard of the project | Trishuli 3B Hub Station | Single ckt |
136 | Malta Bagmati HPP 33 KV Transmission Line Project | 33 | 5 | 6.5 | 675 | 2081-08-13 | 2083-08-12 | Bagmati Water Energy Pvt. Ltd. | KMC-16, Banasthali, Kathmandu | SY of Project | Malta S/S | |
137 | Lower Arun HPP 400 kV Transmission Line Project | 400 | 1.002 | 669 | 676 | 2081-08-19 | 2083-08-18 | SJVN Lower Arun Power Development Company Pvt. Ltd. | Khadbari, Sankhuwasabha | switchyard of the project | Arun-3 LILO | Multi circuit, Lower Arun HEP - 669 MW + Arun-3 HEP-900 MW |
138 | Pikhuwa Pashupati Hydropower Project | 33 | 30 | 4.1 | 677 | 2081-09-02 | 2083-09-01 | Sumnima Hydropower Company Private Limited | Hulak Yol Marga, kathmandu | Respective Switchyard of the project | Tumlingtar s/s | Single ckt |
139 | Upper Dudhkhola HPP 132 kV Transmission Line Project | 132 | 4 | 30.4 | 679 | 2081-09-02 | 2083-09-01 | Carbonless Energy Fund Pvt.Ltd | Kalimati, Kathmandu | Respective Switchyard of the project | Switchyard of Dudhkhola HPP | Single Ckt |
140 | Madhya Tadi Khola 33 KV TL Project | 33 | 7 | 5.5 | 678 | 2081-09-03 | 2083-09-02 | Dupcheswor Mahadev Hydro Co. Pvt. Ltd. | K.M.C-3, Maharajgunj, Kathmandu | Switchyard | Samundratar S/S | Single ckt |
141 | Gandak-Nepalgunj 220kV Transmission Line Project (Gandak_Parasi section) | 220 | 12 | 1000 | 680 | 2081-09-08 | 2083-09-07 | NEA | Darbarmarg, Kathmandu | Gandak s/s | Parasi s/s | Double Ckt |
142 | Dukuchhap Sunakothi 132kV Transmission Line Project | 132 | 7.2 | 242 | 681 | 2081-09-08 | 2083-09-07 | NEA | Darbarmarg, Kathmandu | Tika Bhairab LILO | Sunakothi s/s | Double ckt , Monopole |
143 | Gandak-Nepalgunj 220kV Transmission Line Project (Shivapur-Kalakate-Lamahi secti | 220 | 70 | 1000 | 682 | 2081-09-09 | 2083-09-08 | NEA | Durbarmarg, Kathmandu | Shivapur LILO | New Lamahi s/s | Double Ckt |
144 | Sanfebagar-Basti-Betan 132kV Transmission Line Project | 132 | 48 | 85 | 683 | 2081-09-11 | 2083-09-10 | RPGCL | Budhanagar, Kathmandu | Switchyard of Budhiganga | 400kV Betan s/s | Double Ckt |