Application for Construction License :: Solar

Updated on - Mar 24, 2025

S No Project Capacity (MW) Appn No Appn Date Promoter Address Latitiude N Longitude E VDC/District
1 Grid-Connected Solar Power Project, Lahan , 33 kV S/S 4.000 4436 2076-08-12 Asian Tech Corporation Pvt. Ltd. Babarmahal, Kathmandu-11, Ph. no.-01-2291943 26o 42' 35" 26o 43' 35" 86o 25' 30" 86o 27' 25" Lahan N.P. (Siraha)
2 Grid Connected Solar PV Project, Birendranagar Surkhet 1.200 6503 2081-02-04 G.C.Solar Energy Group Birendranagar-10, Nayagaun Surkhet 28o 33' 36" 28o 33' 43" 81o 37' 34" 81o 37' 43" BirendraNagar N.P. (Surkhet)
3 Grid Connected Solar PV Project, Lamahi 10.000 6824 2081-02-20 Pioneer Energy Pvt. Ltd Kathmandu-13 27o 52' 30" 27o 52' 50" 82o 25' 36" 82o 25' 50" Satbariya (Dang)
4 Grid Connected Solar Electricity Project Part-2 Ganeshpur, K 10.000 6825 2081-02-20 Positive Energy (Pvt.) Ltd Kathmandu Metropolitan City -13, Nepal 27o 34' 57" 27o 35' 08" 82o 49' 20" 82o 49' 41" Ganeshpur (Kapilbastu)
5 Grid Connected Solar PV Project, Lamahi 1 10.000 6826 2081-02-20 Progressive Energy Pvt. Ltd Kathmandu-13 27o 52' 30" 27o 52' 42" 82o 25' 54" 82o 26' 08" Satbariya (Dang)
6 Madhya Marsyangdi Solar Electricity Project, Lamjung 1.600 1894 2081-06-09 Nepal Electricity Authority Durbar Marg , Kathmandu 28o 11' 16" 28o 11' 28" 84o 25' 07" 84o 25' 35" Sundarbajar (Lamjung)
7 Jhupra Saurya Vidyut Project, Surkhet 2.000 1895 2081-06-09 Nepal Electricity Authority Durbar Marg , Kathmandu 28o 35' 52" 28o 36' 07" 81o 40' 23" 81o 40' 41"  
8 Gandak Solar PV Project 5.800 1896 2081-06-09 Nepal Electricity Authority Durbar Marg , Kathmandu 27o 25' 16" 27o 25' 46" 83o 47' 12" 83o 47' 42" Pratappur (Nawalparasi)
9 Arga Saurya Vidyut Aayojana, Arghakhachi 10.000 3858 2081-09-01 Arga Bhagbati Ventures Private Limited Kathmandu - 16, Bohoratar 27o 57' 47" 27o 58' 12" 83o 08' 24" 83o 08' 48"  
10 Duhabi Solar Farm 8.000 6029 2081-11-15 Global Energy & Construction Pvt. Ltd. Sagarmatha Complex, Bagwati Bahal, Naxal, KMC -01 26o 36' 05" 26o 36' 15" 87o 20' 00" 87o 20' 15" Dangraha,Mrigauliya (Morang)

Total capacity for 10 projects = 62.6 MW