Sano Gaucharan, Kathmandu, Nepal     (977-1-) 4534119      (977-1-) 5244257     info@doed.gov.np

GON Project Bank :: Studied Projects

Updated on - Nov 08, 2024

S NoProjectCapacity (MW)River Latitiude N Longitude E VDC/District Remarks
1Bheri Khola5.000Bheri Khola29o 07' 53"29o 13' 07"81o 55' 58"82o 05' 18" Tamti (Jumla)changed status to GON- Basket on COD : 2076-10-12
2Bheri-Babai Diversion Project48.000Bheri28o 20' 10"28o 29' 45"81o 18' 50"81o 52' 26" BirendraNagar N.P. (Surkhet) Under construction by Dept of Irrigation
3Budhi Gandaki Storage Hydropower Project1200.000Budhi Gandaki27o 48' 30"28o 07' 30"84o 42' 30"84o 56' 00" Budhathum, Chainpur, Khari, Maidi, Salyantar, Salang (Dhading) Namjung, Dhawa, Darbhung, Borlang, Ghyalchok, Tandrang (Gorkha)detailed engineering study completed 2072/73
4Dotigad2.520Doti Gad29o 17' 37"29o 18' 20"80o 29' 06"80o 30' 30" Bagarkot (Dadeldhura)changed status to GON- Basket on COD : 2074-08-25
5Dudh Koshi-IV47.000Dudh Koshi27o 27' 00"27o 29' 46"86o 41' 00"86o 44' 20" (Solukhumbu)changed status to GON- Basket on COD : 2076-03-23
6Jawa Khola17.550Jawa Khola29o 16' 26"29o 19' 01"82o 12' 21"82o 15' 50" Chhumchaur, Chandan Nath, Dillichaur, Garjyangkot, Patmara, Patarasi (Jumla)changed status to GON- Basket on COD : 2075-12-28
7Kawadi Khola30.000Kawadi Khola29o 45' 00"29o 48' 18"81o 43' 00"81o 45' 00" Maila (Humla)changed status to GON- Basket on COD : 2077-03-30
8Loti Karnali (Darma)49.500Darma Khola29o 44' 30"29o 49' 13"82o 03' 18"82o 05' 36" Mimi (Humla)changed status to GON- Basket on COD : 2078-03-31
9Lungri Khola4.400Lungri28o 14' 52"28o 18' 30"82o 43' 00"82o 47' 45" Harjang (Rolpa)(i) changed status to GON- Basket on COD : 2076-05-29 (i) Project boundary amended from 281400 to 281452 in south, Decision Date: 2079-04-10
10Maiwa Khola12.504Maiwa27o 21' 00"27o 22' 37"87o 33' 58"87o 37' 37" (Taplejung)changed status to GON- Basket on COD : 2074-08-25
11Mustang Wind Power0.45000o 00' 00"00o 00' 00"00o 00' 00"00o 00' 00" Jomosom (Mustang)
12Myagdi Khola15.200Myagdi Khola28o 18' 45"28o 22' 00"83o 30' 00"83o 35' 30" Devisthan (Myagdi)changed status to GON- Basket on COD : 2077-03-30
13Nyaurigad4.015Nyauri Gad29o 23' 00"29o 24' 30"82o 08' 30"82o 11' 00" Buvramadichaur (Jumla)changed status to GON- Basket on COD : 2076-09-20
14Rupagad HPP8.625Rup Gad28o 56' 12"29o 00' 02"82o 49' 10"82o 52' 11"changed status to GON- Basket on COD : 2077-03-30
15Sankuwa Khola 140.820Sankuwa27o 28' 44"27o 32' 45"87o 04' 00"87o 06' 04" Bala, Tamku (Sankhuwasabha)changed status to GON- Basket on COD : 2076-04-27
Total capacity for 15 projects = 1485.584 MW