Application for Construction License :: Transmission Line
Updated on - Jul 22, 2024
Updated on - Jul 22, 2024
S No | Project | Voltage (kV) |
Line Length (km) | Capacity (MW) | Appn No | Appn Date | Promoter |
Address | Start Point |
End Point |
Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | Upper Karnali Hydroelectric Project 400 kV Transmission Line | 400 | 900 | 6091 | 2072-03-20 | Karnali Transmission Company Pvt. Ltd. | Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540659 | Bhairabsthan, Accham | Brahmadev, Kanchanpur | Survey Lic No: 119 Date: 2067-03-23 | |
2 | Upper Marsyangdi-2 Hydroelectric Project 400 kV Transmission Line | 400 | 600 | 6093 | 2072-03-21 | Marsyangdi Transmission Company Pvt Ltd | Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540660 | Taghring, Lamjung | Bodabar, Rupandehi | Survey Lic No: 120 Date: 2067-03-23 | |
3 | Super Trishuli HP 220kV TR Line | 220 | 30 | 100 | 1538 | 2076-05-20 | Blue Energy P Ltd | Darbar Marg Kathmandu, POB 9609, Ph 4233516 | Switchyard | Bharatpur substation | Survey Lic No: 209 Date: 2071-05-26 Er.Vijay |
4 | Rasuwa Bhotekoshi HEP TL survey Project | 220 | 3.8 | 120 | 793 | 2079-04-29 | Langtang Bhotekoshi Hydropower Company Pvt. Ltd. | 01-4440706 | Respective Switchyard of the project at | Chilime Hub at Chilime VDC, Rasuwa | Survey Lic No: 298 Date: 2074-04-29 |
5 | Transmission line for Betan Karnali Construction Power | 33 | 30 | 6 | 1144 | 2079-05-07 | Betan Karnali Sanchay Karta Hydropower Co. Ltd. | Darbarmarg, Kathmandu | Sugarkhal Substation(Surkhet Aachham ) | Betan Karnali Project Site(Surkhet) | Survey Lic No: 439 Date: 2076-09-04 |
6 | Khare Khola Hydropower Project | 132 | 9 | 24.1 | 3583 | 2079-09-06 | Consoriun Power Developers Pvt.Ltd. | 316 Baburam Acharya Sadak , Sinamangal -9 Kathmandu | Switchyard of Hydropower Project (Dolkha | Singati NEA Substation(Dolakha) | Survey Lic No: 446 Date: 2076-09-20 |
7 | Madhya Hongu Khola B HPP Transmission Line | 132 | 21 | 22.9 | 8794 | 2080-02-05 | Shree Gauri Shankar Power Development Pvt.Ltd. | Municipality-10, Kathmandu | Switchyard of Madhya Hongu Khola Hydro P | Tingla NEA Substation | Survey Lic No: 344 Date: 2075-02-08 |
8 | Siuri Nyadi 132 kV Transmission Line Project | 132 | 5.5 | 42.6 | 351 | 2080-04-09 | Siuri Nyadi Power Ltd. | Hanumanstan, Anamnagar, Kathmandu, 01-5705159 | Switchyard of Project | Switchyard of Nyadi HEP | Survey Lic No: 557 Date: 2079-04-11 |
9 | Upper Khudi Hydropower Project | 132 | 5 | 26 | 1187 | 2080-05-18 | Super Khudi Hydropower Pvt.Ltd. | Charkhal, Dillibazzar, Kathmandu, Nepal 01-4424644 4424655 4434003 | Swichyard of Upper Khudi HPP(Lamjung) | Khudi(Tarikuna) NEA Substation(Lamjung) | Survey Lic No: 427 Date: 2076-08-19 |
10 | Betan Karnali HEP 400 kV Transmission Line Project | 400 | 5 | 439 | 1478 | 2080-06-01 | Betan Karnali Snchayakarta Hydropower Co.Ltd. | Durbarmarg Kathmandu; 01-4244903, E-mail: info@bkshcl.com.np | Dhakari Achham | Baghmara S/S Betan Hub Surkhet | Survey Lic No: 471 Date: 2077-06-04 |
11 | Upper Modi A and Upper Modi HEP 132 kV Transmission Line | 132 | 11.5 | 60.2 | 1659 | 2080-06-10 | Modi Jalvidyut Company Limited | United World Trade Centre, Tripureshwor; 01-4117167, uppermodi42@nea.org.np | Switchyard of Upper Modi A HEP | New Modi S/S | Survey Lic No: 480 Date: 2077-08-26 |
12 | Tamor Dhungesanghu 220 kV Transmission Line | 220 | 32 | 700 | 3500 | 2080-09-20 | Rastriya Prasaran Grid Company Limited | DCC Bhawan Babarmahal, Kathmandu; 01-4266693; rpgcl.np@gmail.com | Proposed Tamor S/S | Proposed Dhungesanghu S/S | Survey Lic No: 485 Date: 2077-09-22 |
13 | Galchhi Ratamate 220 kV Transmission Line Project | 220 | 8.5 | 1147 | 3740 | 2080-10-02 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Galchhi | NEA Ratamate, Naubise S/S | Survey Lic No: 549 Date: 2079-02-17 |
14 | Nalgad Maintada (Bheri Corridor) Transmission Line | 400 | 75 | 2400 | 4920 | 2080-11-23 | Rastriya Prasaran Grid Company Limited | Babarmahal, Kahmandu | Proposed Nalgad S/S | Proposed Maintada S/S | Survey Lic No: 386 Date: 2075-11-26 |
15 | Suni Gad HEP 33 kV Transmission Line Project | 33 | 10 | 11.05 | 4951 | 2080-11-24 | Omega Energy Developer Pvt. Ltd. | Kathmandu-04, Chandole, 01-4529044 | Switchyard of Project | NEA Chainpur S/S | Survey Lic No: 613 Date: 2080-06-26 |
16 | Dudhkoshi Storage Transmission Line Project | 400 | 90.9 | 600 | 6301 | 2081-01-31 | Nepal Electricity Authority | Main office, Darbarmarg, Kathmandu | Switchyard of Dudhkoshi Storage HPP | Dhalkebar NEA Substation | Survey Lic No: 394 Date: 2076-02-03 |
17 | Super Hewa Baneswor 33 kV Transmission Line Project | 33 | 14 | 6 | 6547 | 2081-02-06 | Super Hewa Power Company Pvt. Ltd. | Anamnagar, Kathmandu; 01-4388307, 4388299; superhewapc@gmail.com | Switchyard of Project | NEA Baneshwor S/S | Survey Lic No: 535 Date: 2078-12-07 |
18 | Thimi Balkumari 132 kV Underground Transmission Line Project | 132 | 8 | 300 | 6897 | 2081-02-22 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | NEA Thimi S/S | NEA Proposed Balkumari | Survey Lic No: 550 Date: 2079-02-27 |
19 | Upper Thulo Khola A HPP 132 kV Transmission Line Project | 132 | 16 | 22.5 | 74 | 2081-04-04 | Thulo Khola Hydropoer Ltd. | Mid Baneshwor-31, Kathmandu; 01-5321777 | Switchyard of Project | NEA Dana S/S | Survey Lic No: 544 Date: 2079-01-26 |