Application for Construction License :: Transmission Line

Updated on - Jul 22, 2024

S No Project Voltage (kV)
Line Length (km) Capacity (MW) Appn No Appn Date Promoter
Address Start Point
End Point
Remarks
1 Upper Karnali Hydroelectric Project 400 kV Transmission Line 400 9006091 2072-03-20Karnali Transmission Company Pvt. Ltd. Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540659 Bhairabsthan, Accham Brahmadev, Kanchanpur Survey Lic No: 119 Date: 2067-03-23
2 Upper Marsyangdi-2 Hydroelectric Project 400 kV Transmission Line 400 6006093 2072-03-21Marsyangdi Transmission Company Pvt Ltd Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540660 Taghring, Lamjung Bodabar, Rupandehi Survey Lic No: 120 Date: 2067-03-23
3 Super Trishuli HP 220kV TR Line 220 30 1001538 2076-05-20Blue Energy P Ltd Darbar Marg Kathmandu, POB 9609, Ph 4233516 Switchyard Bharatpur substation Survey Lic No: 209 Date: 2071-05-26 Er.Vijay
4 Rasuwa Bhotekoshi HEP TL survey Project 220 3.8 120793 2079-04-29Langtang Bhotekoshi Hydropower Company Pvt. Ltd. 01-4440706 Respective Switchyard of the project at Chilime Hub at Chilime VDC, Rasuwa Survey Lic No: 298 Date: 2074-04-29
5 Transmission line for Betan Karnali Construction Power 33 30 61144 2079-05-07Betan Karnali Sanchay Karta Hydropower Co. Ltd. Darbarmarg, Kathmandu Sugarkhal Substation(Surkhet Aachham ) Betan Karnali Project Site(Surkhet) Survey Lic No: 439 Date: 2076-09-04
6 Khare Khola Hydropower Project 132 9 24.13583 2079-09-06Consoriun Power Developers Pvt.Ltd. 316 Baburam Acharya Sadak , Sinamangal -9 Kathmandu Switchyard of Hydropower Project (Dolkha Singati NEA Substation(Dolakha) Survey Lic No: 446 Date: 2076-09-20
7 Madhya Hongu Khola B HPP Transmission Line 132 21 22.98794 2080-02-05Shree Gauri Shankar Power Development Pvt.Ltd. Municipality-10, Kathmandu Switchyard of Madhya Hongu Khola Hydro P Tingla NEA Substation Survey Lic No: 344 Date: 2075-02-08
8 Siuri Nyadi 132 kV Transmission Line Project 132 5.5 42.6351 2080-04-09Siuri Nyadi Power Ltd. Hanumanstan, Anamnagar, Kathmandu, 01-5705159 Switchyard of Project Switchyard of Nyadi HEP Survey Lic No: 557 Date: 2079-04-11
9 Upper Khudi Hydropower Project 132 5 261187 2080-05-18Super Khudi Hydropower Pvt.Ltd. Charkhal, Dillibazzar, Kathmandu, Nepal 01-4424644 4424655 4434003 Swichyard of Upper Khudi HPP(Lamjung) Khudi(Tarikuna) NEA Substation(Lamjung) Survey Lic No: 427 Date: 2076-08-19
10 Betan Karnali HEP 400 kV Transmission Line Project 400 5 4391478 2080-06-01Betan Karnali Snchayakarta Hydropower Co.Ltd. Durbarmarg Kathmandu; 01-4244903, E-mail: info@bkshcl.com.np Dhakari Achham Baghmara S/S Betan Hub Surkhet Survey Lic No: 471 Date: 2077-06-04
11 Upper Modi A and Upper Modi HEP 132 kV Transmission Line 132 11.5 60.21659 2080-06-10Modi Jalvidyut Company Limited United World Trade Centre, Tripureshwor; 01-4117167, uppermodi42@nea.org.np Switchyard of Upper Modi A HEP New Modi S/S Survey Lic No: 480 Date: 2077-08-26
12 Tamor Dhungesanghu 220 kV Transmission Line 220 32 7003500 2080-09-20Rastriya Prasaran Grid Company Limited DCC Bhawan Babarmahal, Kathmandu; 01-4266693; rpgcl.np@gmail.com Proposed Tamor S/S Proposed Dhungesanghu S/S Survey Lic No: 485 Date: 2077-09-22
13 Galchhi Ratamate 220 kV Transmission Line Project 220 8.5 11473740 2080-10-02Nepal Electricity Authority Durbar Marg, Kathmandu 01-4153007 Galchhi NEA Ratamate, Naubise S/S Survey Lic No: 549 Date: 2079-02-17
14 Nalgad Maintada (Bheri Corridor) Transmission Line 400 75 24004920 2080-11-23Rastriya Prasaran Grid Company Limited Babarmahal, Kahmandu Proposed Nalgad S/S Proposed Maintada S/S Survey Lic No: 386 Date: 2075-11-26
15 Suni Gad HEP 33 kV Transmission Line Project 33 10 11.054951 2080-11-24Omega Energy Developer Pvt. Ltd. Kathmandu-04, Chandole, 01-4529044 Switchyard of Project NEA Chainpur S/S Survey Lic No: 613 Date: 2080-06-26
16 Dudhkoshi Storage Transmission Line Project 400 90.9 6006301 2081-01-31Nepal Electricity Authority Main office, Darbarmarg, Kathmandu Switchyard of Dudhkoshi Storage HPP Dhalkebar NEA Substation Survey Lic No: 394 Date: 2076-02-03
17 Super Hewa Baneswor 33 kV Transmission Line Project 33 14 66547 2081-02-06Super Hewa Power Company Pvt. Ltd. Anamnagar, Kathmandu; 01-4388307, 4388299; superhewapc@gmail.com Switchyard of Project NEA Baneshwor S/S Survey Lic No: 535 Date: 2078-12-07
18 Thimi Balkumari 132 kV Underground Transmission Line Project 132 8 3006897 2081-02-22Nepal Electricity Authority Durbar Marg, Kathmandu 01-4153007 NEA Thimi S/S NEA Proposed Balkumari Survey Lic No: 550 Date: 2079-02-27
19 Upper Thulo Khola A HPP 132 kV Transmission Line Project 132 16 22.574 2081-04-04Thulo Khola Hydropoer Ltd. Mid Baneshwor-31, Kathmandu; 01-5321777 Switchyard of Project NEA Dana S/S Survey Lic No: 544 Date: 2079-01-26