GON Project Bank :: Under Study Projects

Updated on - Nov 08, 2024

S NoProjectCapacity (MW)River Latitiude N Longitude E VDC/District Remarks
1Beni Kaligandaki50.000Kali Gandaki28o 18' 15"28o 22' 00"83o 33' 50"83o 36' 30" Malika (Baglung) Ratnechaur, Jyamrukot, Dhatan, Arthunge (Myagdi) Mallaj, Salija, Dhairing (Parbat)Feasibility Study started from FY 2071/72
2Bharbung HEP512.000Burbang28o 50' 45"28o 55' 45"83o 02' 30"83o 22' 15" (Dolpa)changed status to GON- Basket on 2073-12-08
3Bheri-2 HEP256.000Bheri28o 46' 45"28o 52' 00"82o 18' 45"82o 26' 40" Khagenakot (Jajarkot)changed status to GON- Basket on 2080-10-10
4Budhi Ganga20.000Budhi Ganga29o 15' 30"29o 18' 35"81o 14' 00"81o 17' 50" Babala, Hatikot, Kushkot (Achham) Barhabise (Bajura) Under construction with Kuwaiti and Saudi Funds by DOED
5Budhi Ganga Small6.200Budhi Ganga29o 20' 30"29o 24' 00"81o 19' 15"81o 23' 45" (Bajura)Detailed Engineering Design started from FY 2072/73
6Chameliya60.000Chameliya Khola29o 51' 16"29o 54' 30"80o 53' 43"80o 57' 30" (Darchula)changed status to GON- Basket on 2074-09-14
7Chera 1 Storage HPP176.000Chera28o 43' 40"28o 48' 00"81o 58' 20"82o 06' 25"
8Chhati Gad32.000Chhati Gad29o 48' 20"29o 50' 00"80o 53' 10"80o 55' 00" Khandeswori (Darchula)changed status to GON- Basket on 2080-10-10
9Chyadu Khola2.000Chyadu Khola27o 56' 10"27o 57' 47"86o 11' 11"86o 12' 27" (Dolakha)
10Dadagau Khalanga Bheri HEP128.000Bheri28o 41' 25"28o 47' 20"82o 15' 00"82o 18' 44" Khalanga, Dandagaun (Jajarkot) Aathbis Danda, Ghetma, Garayala, Purtim Kanda (Rukum)changed status to GON- Basket on 2077-10-20 (Decision Date : 2076-03-17 Old Lic No 806 of Gezhouba Group Power Investment Nepal Pvt. Ltd.), coordinate change as per decision 2079-01-14
11Ghatganga Hydropower Project30.000Ghat Ganga29o 45' 36"29o 48' 32"81o 23' 52"81o 28' 03"
12Ghunsa Khola78.000Ghunsa Khola27o 39' 30"27o 55' 25"87o 48' 20"88o 22' 15" (Taplejung) Detailed Engineering Study
13Hadi Khola50.000Hadi Khola27o 54' 15"27o 56' 36"85o 37' 30"85o 41' 20"
14Hima Nadi8.000Hima Nadi29o 23' 05"29o 25' 50"82o 01' 15"82o 05' 50"
15Humla Karnali Hydropower Project62.000Karnali30o 03' 12"30o 06' 06"81o 31' 07"81o 36' 05" Muchu (Humla)
16Humla Karnali-Cascade916.000Karnali29o 52' 48"30o 07' 15"81o 30' 00"81o 53' 26" (Humla)changed status from GON- Basket on 2077-10-20
17Inkhu21.100Inkhu27o 29' 15"27o 31' 42"86o 44' 00"86o 45' 45" Baku (Solukhumbu)Detail Engineering study is being conducted by DOED from fiscal year 2071/72
18Jugada Budhiganga HPP15.430Budhi Ganga29o 24' 00"29o 28' 30"81o 23' 45"81o 28' 27"Budhiganga HPP has reserved this HPP
19Kaligandaki 2 Storage HEP477.000Kaligandaki27o 47' 04"27o 55' 40"83o 37' 20"84o 19' 24"GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
20Kaligandaki Storage HEP844.000Kaligandaki28o 00' 00"28o 17' 30"83o 32' 00"83o 43' 30"
21Kankai Multipurpose Project90.000Kankai26o 40' 30"26o 49' 36"87o 45' 49"87o 55' 42"
22Karnali St-1184.000Karnali29o 05' 00"29o 11' 28"81o 30' 00"81o 37' 40" (Kalikot)Feasibility Study started from FY 2072/73
23Khimti Shivalaya Storage HPP1720.000Khimti Khola27o 28' 28"27o 39' 23"86o 06' 00"86o 20' 15"
24Kokhajor Storage HEP110.000Kokhajor Khola27o 15' 48"27o 22' 05"85o 25' 45"85o 37' 40" Kapilakot, Mahendrajhayadi (Sindhuli)
25Kwadi Khola 115.000Kawadi Khola29o 41' 35"29o 44' 59"81o 41' 00"81o 45' 00"
26Lohare River-1 Storage Hydropower Project81.000Lohare Khola28o 43' 13"28o 53' 41"81o 35' 00"81o 48' 09"
27Lower Arun470.000Arun27o 21' 51"27o 30' 00"87o 07' 30"87o 12' 30" (Sankhuwasabha)EOI for Feasibilty Study started(Decision Date : 2071-06-22, Old Lic No 73 - Lower Arun HPL)
28Lower Badigad Storage HEP350.000Badigad27o 57' 00"28o 11' 00"83o 16' 00"83o 29' 25"GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
29Lower Chameliya19.280Chameliya Khola29o 40' 00"29o 41' 40"80o 34' 21"80o 37' 59" (Darchula)Feasibility Study started from FY 2071/72
30Lower Hongu Khola30.000Hongu Khola27o 27' 00"27o 28' 30"86o 43' 45"86o 46' 00" (Solukhumbu)Detailed Engineering Design started from FY 2071/72
31Lower Uttarganga HPP23.000Uttar Ganga28o 35' 00"28o 37' 40"82o 45' 14"82o 49' 15"
32Machhapuchhre Modi HEP24.600Modi28o 29' 19"28o 30' 56"83o 53' 15"83o 55' 00" Ghandruk, Lwangghale (Kaski)changed status to GON- Basket on 2080-10-10
33Madi Siti86.000Madi Khola28o 10' 23"28o 13' 05"84o 08' 35"84o 14' 45" (Lamjung)changed status to GON- Basket on 2079-02-31
34Manahari Khola HPP80.000Manahari27o 32' 15"27o 36' 38"84o 51' 13"84o 55' 54"
35Marshyangdi 3 HEP42.000Marshyangdi28o 05' 27"28o 08' 09"84o 25' 39"84o 27' 30"GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
36Middle Inkhu Khola25.300Inkhu27o 31' 30"27o 34' 00"86o 45' 30"86o 47' 00" (Solukhumbu)Desk study by DOED from fiscal year 2073/74
37Mugu Karnali HEP100.000Mugu karnali29o 31' 21"29o 36' 06"82o 06' 46"82o 13' 45"GoN Under Study as per decision date of 2077/10/20 and 2077/11/25, Cordinates in two portions(293306-293606, 820646-820836 and 293206-293606, 820836-821345)
38Nagmati Reservoir HEP2.120Nagmati27o 45' 00"27o 47' 30"85o 25' 00"85o 27' 30"Under Study : Ministry of Irrigation
39Naumure Storage Project377.000west rapti27o 46' 06"28o 00' 53"82o 45' 00"83o 02' 30"Letter dated 2073-8-8 (ch no 643 study division)
40Saru Khola HPP15.000Saru Khola28o 45' 20"28o 51' 18"82o 03' 47"82o 10' 00"Cordinate ammended as per 2074-07-23 decision
41Serpu Daha - Sani Bheri Nadi (PS)30.100Sani Bheri28o 40' 00"28o 42' 30"82o 28' 24"82o 30' 00" (Rukum)changed status to GON- Basket on 2079-02-31
42Sharada Babai Storage HPP93.000Sharada28o 15' 00"28o 20' 00"82o 00' 00"82o 07' 30"
43SR-06 Storage276.000West Seti28o 58' 00"29o 16' 00"80o 55' 30"81o 12' 30"Feasibility Study by DOED
44Super Budhigandaki HEP52.000Budhigandaki28o 33' 30"28o 35' 00"84o 41' 15"84o 45' 00" Samagaun (Gorkha)changed status to GON- Basket on 2077-10-20 (Decision Date : 2076-10-17 Old Lic No 929 of Natural Hydro Nepal Pvt. Ltd), West coordinates amended from 844150 to 844115, Decision date:2079-03-02
45Surnayagad Storage HPP38.000Surnaya Gad29o 18' 40"29o 23' 35"80o 19' 10"80o 28' 00"
46Syar Khola HEP59.500Syar28o 27' 40"28o 29' 29"84o 57' 35"85o 02' 50" Chhaikampar, Chunchet (Gorkha)changed status to GON- Basket on 2079-02-31
47Tila HEP35.000Tila29o 09' 39"29o 12' 07"81o 52' 00"81o 54' 49"Survey area amended from 290939.6N to 291206.78 N and from 815200 E to 815448.59 E , Decision Date: 2080-04-03
48Tom Dogar(Budhigandaki) HEP43.520Budhigandaki28o 29' 16"28o 30' 37"84o 50' 52"84o 52' 40"GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
49Upper Arun335.000Arun27o 38' 24"27o 48' 09"87o 20' 00"87o 30' 00" Chepuwa, Hatiya (Sankhuwasabha)being studied by NEA under IDA assistance
50Upper Hongu HEP38.000Hongu27o 34' 40"27o 36' 42"86o 53' 39"86o 55' 22"GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
51Upper Jhimruk Storage Project100.000Jhimruk28o 07' 30"28o 12' 30"82o 52' 30"83o 00' 00"As per Letter dated 2073-08-08 (Ch no 642, study division)
52Upper Karnali B60.000Karnali28o 57' 30"29o 05' 32"81o 24' 02"81o 30' 00"changed status to GON- Basket on 2080-10-10
53Upper Khudi-A HPP27.400Khudi28o 21' 50"28o 24' 27"84o 16' 43"84o 19' 36" Ghanpokhara, Khudi (Lamjung)Feasibility Study started from FY 2071/72, Coordinate amended as per 2073-8-8, study division.
54Upper Lotikarnali35.000Karnali29o 49' 35"29o 50' 52"82o 06' 23"82o 11' 22" Mimi (Humla)changed status to GON- Basket on 2080-10-10
55West Seti Storage HPP750.000West Seti29o 16' 00"29o 28' 50"80o 45' 00"80o 57' 30" Dhungad, Thalakanda (Baitadi) Sunkuda (Bajhang) Belapur (Dadeldhura) Lamikhal (Doti)Coordinate Decision Date: 2079-06-26 (Processing Under IBN)
56Yanma Khola64.000Yangma Khola27o 39' 00"27o 41' 31"87o 47' 52"87o 50' 00" (Taplejung)changed status to GON- Basket on 2074-09-14 (Area revised decision date 2076-11-30)
Total capacity for 56 projects = 9624.55 MW