GON Project Bank :: Under Study Projects

Updated on - Mar 24, 2025

S No Project Capacity (MW) River Latitiude N Longitude E VDC/District Remarks
1 Badigad 7.000 Badigad 28o 11' 48" 28o 12' 33" 83o 13' 37" 83o 17' 01"   This area is remaining area of the area reserved by Lumbini province for study (previously GoN Basket area) after issuing Bi.U.Sa. 1193, Decision Date:2079-01-07
2 Bharbung HEP 337.100 Burbang 28o 50' 45" 28o 55' 45" 83o 02' 30" 83o 22' 15" (Dolpa) changed status to GON- Basket on 2073-12-08
3 Bheri-2 HEP 256.000 Bheri 28o 46' 45" 28o 52' 00" 82o 18' 45" 82o 26' 40" Khagenakot (Jajarkot) changed status to GON- Basket on 2080-10-10
4 Chera 1 Storage HPP 176.000 Chera 28o 43' 40" 28o 48' 00" 81o 58' 20" 82o 06' 25"    
5 Chhati Gad (Reserved) 32.000 Chhati Gad 29o 48' 20" 29o 50' 00" 80o 53' 10" 80o 55' 00" Khandeswori (Darchula) changed status to GON- Basket on 2080-10-10
6 Dadagau Khalanga Bheri HEP 97.430 Bheri 28o 41' 25" 28o 47' 20" 82o 15' 00" 82o 18' 44" Khalanga,Dandagaun (Jajarkot) Aathbis Danda,Ghetma,Garayala,Purtim Kanda (Rukum) changed status to GON- Basket on 2077-10-20 (Decision Date : 2076-03-17 Old Lic No 806 of Gezhouba Group Power Investment Nepal Pvt. Ltd.), coordinate change as per decision 2079-01-14
7 Ghatganga 43.500 Ghat Ganga 29o 45' 36" 29o 48' 32" 81o 23' 52" 81o 28' 03"    
8 Ghunsa Khola 78.000 Ghunsa Khola 27o 39' 30" 27o 55' 25" 87o 48' 20" 88o 22' 15" (Taplejung) Detailed Engineering Study
9 Hadi Khola (Reserved) 50.000 Hadi Khola 27o 54' 15" 27o 56' 36" 85o 37' 30" 85o 41' 20"    
10 Hima Nadi 8.000 Hima Nadi 29o 24' 00" 29o 25' 50" 82o 01' 40" 82o 05' 50"    
11 Humla Karnali-Cascade 675.000 Karnali 29o 52' 48" 30o 07' 15" 81o 30' 00" 81o 53' 26" (Humla) changed status from GON- Basket on 2077-10-20
12 Kaligandaki 2 Storage HEP 650.000 Kaligandaki 27o 47' 04" 27o 55' 40" 83o 37' 20" 84o 19' 24"   GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
13 Kaligandaki Storage HEP 640.000 Kaligandaki 28o 00' 00" 28o 17' 30" 83o 32' 00" 83o 43' 30"    
14 Karnali St-1 (Reserved) 184.000 Karnali 29o 05' 00" 29o 11' 28" 81o 30' 00" 81o 37' 40" (Kalikot) Feasibility Study started from FY 2072/73
15 Khimti Shivalaya Storage HPP 1216.000 Khimti Khola 27o 28' 28" 27o 39' 23" 86o 06' 00" 86o 20' 15"    
16 Kokhajor Storage HEP 63.000 Kokhajor Khola 27o 15' 48" 27o 22' 05" 85o 25' 45" 85o 37' 40" Kapilakot,Mahendrajhayadi (Sindhuli)  
17 Lohare River-1 Storage Hydropower Project 81.000 Lohare Khola 28o 43' 13" 28o 53' 41" 81o 35' 00" 81o 48' 09"    
18 Lower Badigad Storage HEP 350.000 Badigad 27o 57' 00" 28o 11' 00" 83o 16' 00" 83o 29' 25"   GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
19 Lower Uttarganga (Reserved) 23.000 Uttar Ganga 28o 35' 00" 28o 37' 40" 82o 45' 14" 82o 49' 15"    
20 Machhapuchhre Modi (Reserved) 24.600 Modi 28o 29' 19" 28o 30' 56" 83o 53' 15" 83o 55' 00" Ghandruk,Lwangghale (Kaski) changed status to GON- Basket on 2080-10-10
21 Madi Khola 3.600 Madi Khola 28o 22' 45" 28o 23' 50" 82o 30' 50" 82o 32' 30" (Rolpa) changed status to GON- Basket on 2081-08-20 (i) According to Ministry of Energy, Water Resources and Irrigation Letter dated: 2076-10-06 Under Study through Province 5 Government ( Province government Letter dated:2076-09-21 )
22 Madi Siti 128.000 Madi Khola 28o 10' 23" 28o 13' 05" 84o 08' 35" 84o 14' 45" (Lamjung) changed status to GON- Basket on 2079-02-31
23 Manahari Khola HPP 55.000 Manahari 27o 32' 15" 27o 36' 38" 84o 51' 13" 84o 55' 54"    
24 Marshyangdi 3 HEP 61.390 Marshyangdi 28o 05' 27" 28o 08' 09" 84o 25' 39" 84o 27' 30" Nauthar (Lamjung) Rupakot (Tanahu) GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
25 Mugu Karnali HEP 89.350 Mugu karnali 29o 32' 53" 29o 36' 06" 82o 06' 46" 82o 13' 45"   GoN Under Study as per decision date of 2077/10/20 and 2077/11/25, Cordinates in two portions(293306-293606, 820646-820836 and 293206-293606,820836-821345)
26 Nagmati Reservoir (DWRI) 2.120 Nagmati 27o 45' 00" 27o 47' 30" 85o 25' 00" 85o 27' 30"   Under Study : Ministry of Irrigation
27 Super Budhigandaki HEP 34.390 Budhigandaki 28o 33' 30" 28o 35' 00" 84o 41' 15" 84o 45' 00" Samagaun (Gorkha) changed status to GON- Basket on 2077-10-20 (Decision Date : 2076-10-17 Old Lic No 929 of Natural Hydro Nepal Pvt. Ltd), West coordinates amended from 844150 to 844115, Decision date:2079-03-02
28 Surnayagad Storage HPP 114.000 Surnaya Gad 29o 18' 40" 29o 24' 00" 80o 19' 10" 80o 28' 00"    
29 Syar Khola (Reserved) 59.500 Syar 28o 27' 40" 28o 29' 29" 84o 57' 35" 85o 02' 50" Chhaikampar,Chunchet (Gorkha) changed status to GON- Basket on 2079-02-31
30 Tila HEP 41.660 Tila 29o 09' 39" 29o 12' 07" 81o 52' 00" 81o 54' 49"   Survey area amended from 290939.6N to 291206.78 N and from 815200 E to 815448.59 E , Decision Date: 2080-04-03
31 Tom Dogar(Budhigandaki) 40.200 Budhigandaki 28o 29' 16" 28o 30' 37" 84o 50' 52" 84o 52' 40"   GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
32 Upper Badigad 5.000 Badigad 28o 07' 00" 28o 10' 00" 83o 17' 20" 83o 19' 40" (Gulmi) changed status to GON- Basket on 2081-08-20
33 Upper Hongu (Reserved) 38.000 Hongu 27o 34' 40" 27o 36' 42" 86o 53' 39" 86o 55' 22"   GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
34 Upper Karnali B 113.000 Karnali 28o 58' 20" 29o 05' 32" 81o 24' 02" 81o 30' 00"   changed status to GON- Basket on 2080-10-10
35 Upper Khudi-A (Reserved) 27.400 Khudi 28o 21' 50" 28o 24' 27" 84o 16' 43" 84o 19' 36" Ghanpokhara,Khudi (Lamjung) Feasibility Study started from FY 2071/72, Coordinate amended as per 2073-8-8, study division.
36 Upper Lotikarnali 73.800 Karnali 29o 49' 35" 29o 50' 52" 82o 06' 23" 82o 11' 22" Mimi (Humla) changed status to GON- Basket on 2080-10-10
37 Yanma Khola 65.000 Yangma Khola 27o 39' 00" 27o 41' 31" 87o 47' 52" 87o 50' 00" (Taplejung) changed status to GON- Basket on 2074-09-14 (Area revised decision date 2076-11-30)

Total capacity for 37 projects = 5943.04 MW