S No Project Capacity (MW) Appn No Appn Date Promoter Address Latitiude N Longitude E VDC/District
1 Grid-Connected Solar Power Project, Lahan , 33 kV S/S 4.000 4436 2076-08-12 Asian Tech Corporation Pvt. Ltd. Babarmahal, Kathmandu-11, Ph. no.-01-2291943 26o 42' 35" 26o 43' 35" 86o 25' 30" 86o 27' 25" Lahan N.P. (Siraha)
2 New Nepalgunj Saurya Vidyut Aayojana 30.000 7838 2082-12-24 Sol Power Limited Baneshwor, Kathmandu - 10 28o 08' 54" 28o 09' 30" 81o 36' 15" 81o 36' 55" Bageswari,Raniyapur (Banke)
3 Garuda Saurya Vidyut Aayojana 5.000 10641 2083-03-02 Sunlight Renewable Energy Private Limited Lalitpur - 32, Lalitpur 26o 56' 20" 26o 56' 31" 85o 18' 36" 85o 18' 50" Garuda Bairiya (Rautahat)
4 Aurahi - 2 Saurya Vidyut Aayojana 5.000 536 2083-04-13 Eco Global Power Development Limited Thapathali, Kathmandu 26o 53' 28" 26o 53' 43" 85o 50' 10" 85o 50' 30" Aurahi (Mahottari)
5 Rapti Dobhan Saurya Vidyut Aayojana 30.000 716 2083-04-18 Lamahi Energy Limited Ward No.11, Tripureshwor, Kathmandu 27o 50' 27" 27o 50' 42" 82o 31' 32" 82o 31' 56" Satbariya (Dang)
6 Dhalkebar - 2 Saurya Vidyut Aayojana 30.000 1236 2083-05-02 Integrated Energy & Industrial Enterprises Private Limited Lalitpur Municipality - 3, Lalitpur 26o 55' 51" 26o 56' 29" 85o 56' 09" 85o 56' 45" Laxminiwas (Dhanusha)
7 Sitalpati Saurya Vidyut Aayojana 10.000 1388 2083-05-05 Himalayan Solar Power Pvt. Ltd. Gusingal, Sanepa, Lalitpur 27o 24' 00" 27o 24' 18" 87o 08' 30" 87o 08' 47" Baneswor (Sankhuwasabha)
8 Palpa Saurya Vidyut Aayojana 50.000 1603 2083-05-11 Gogreen Energy Limited Sunwal-4, Nawalparasi 27o 41' 15" 27o 42' 24" 83o 39' 17" 83o 41' 54" Gothadi (Palpa)

Total capacity for 8 projects = 164 MW