1 |
Upper Karnali Hydroelectric Project 400 kV Transmission Line |
400 |
|
900 |
6091 |
2072-03-20 |
Karnali Transmission Company Pvt. Ltd. |
Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540659 |
Bhairabsthan, Accham |
Brahmadev, Kanchanpur |
Survey Lic No: 119 Date: 2067-03-23 |
2 |
Upper Marsyangdi-2 Hydroelectric Project 400 kV Transmission Line |
400 |
|
600 |
6093 |
2072-03-21 |
Marsyangdi Transmission Company Pvt Ltd |
Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540660 |
Taghring, Lamjung |
Bodabar, Rupandehi |
Survey Lic No: 120 Date: 2067-03-23 |
3 |
Super Trishuli HP 220kV TR Line |
220 |
30 |
100 |
1538 |
2076-05-20 |
Blue Energy P Ltd |
Darbar Marg Kathmandu, POB 9609, Ph 4233516 |
Switchyard |
Bharatpur substation |
Survey Lic No: 209 Date: 2071-05-26 Er.Vijay |
4 |
Transmission line for Betan Karnali Construction Power |
33 |
30 |
6 |
1144 |
2079-05-07 |
Betan Karnali Sanchay Karta Hydropower Co. Ltd. |
Darbarmarg,Kathmandu |
Sugarkhal Substation(Surkhet Aachham ) |
Betan Karnali Project Site(Surkhet) |
Survey Lic No: 439 Date: 2076-09-04 |
5 |
Khare Khola Hydropower Project |
132 |
9 |
24.1 |
3583 |
2079-09-06 |
Consoriun Power Developers Pvt.Ltd. |
316 Baburam Acharya Sadak ,Sinamangal -9 Kathmandu |
Switchyard of Hydropower Project (Dolkha |
Singati NEA Substation(Dolakha) |
Survey Lic No: 446 Date: 2076-09-20 |
6 |
Dudhkoshi Storage Transmission Line Project |
400 |
90.9 |
600 |
6301 |
2081-01-31 |
Nepal Electricity Authority |
Main office,Darbarmarg,Kathmandu |
Switchyard of Dudhkoshi Storage HPP |
Dhalkebar NEA Substation |
Survey Lic No: 394 Date: 2076-02-03 |
7 |
Mathillo Tadi HPP- Samundratar 33 kV Transmission Line Project |
33 |
7 |
11 |
7244 |
2081-03-04 |
Suryakunda Hydroelectric Limited |
Trade Tower, Thapathali, Kathmandu |
switchyard of the project |
NEA Samundratar S/S |
Survey Lic No: 651 Date: 2081-04-16 |
8 |
Inaruwa-Anarmani 400 kV Transmission Line Project |
400 |
91 |
2600 |
1964 |
2081-06-11 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
NEA Inaruwa S/S |
Proposed New Anarmani S/S |
Survey Lic No: 548 Date: 2079-02-06 |
9 |
Trishuli 3B- Ratamate 220 kV Transmission Line Project |
220 |
23.5 |
1234 |
3422 |
2081-08-13 |
Nepal Electricity Authority |
Durbarmarg Kathmandu |
Trishuli 3B Hub S/S |
Ratamate S/S |
Survey Lic No: 652 Date: 2081-04-18 |
10 |
Tingla Hub to Dhalkebar |
400 |
155 |
2500 |
4166 |
2081-09-12 |
Nepal Electricity Authority |
Main office,Darbarmarg,Kathmandu |
Tingla Hub(Solukhumbu),Likhu,New Khimti |
Dhalkebar NEA Substation (Dhanusha) |
Survey Lic No: 442 Date: 2076-09-15 |
11 |
Lamosanghu Kavre Ramechap |
132 |
36 |
238 |
4167 |
2081-09-12 |
Nepal Electricity Authority |
Main office,Darbarmarg,Kathmandu |
Lamosanghu(Sindhupalchowk) |
Proposed New Substation at Boundry of Ra |
Survey Lic No: 443 Date: 2076-09-16 |
12 |
Phukot Karnali PROR HEP 400 KV TL |
400 |
2.5 |
480 |
8289 |
2082-01-28 |
Vidhyut Utpadan CompNy Limited |
BPC Building, Rudramatimarg Kathmandu, 01-4788680, info@vucl.org |
Project Powerhouse |
Phukot Substation |
Survey Lic No: 454 Date: 2077-01-30 |
13 |
Nijgadh - Pokhariya 400kV Transmission Line Project |
400 |
65 |
2000 |
8646 |
2082-02-07 |
Nepal Electricity Authority |
Darbarmarg, Kathmandu |
Nijgadh s/s |
Pokhariya s/s |
Survey Lic No: 702 Date: 2081-12-13;Double ckt |
14 |
Hewa A Small HEP 33kV Transmission Line Project |
33 |
10 |
9.9 |
9267 |
2082-02-23 |
Habitat Power Co. Pvt. Ltd. |
Chabahil, Kathmandu-7, 015242384 |
Switchyard of Project |
NEA Phidim s/s |
Survey Lic No: 594 Date: 2079-12-20:Single ckt |
15 |
Kalinchowk Small HPP 33kV Transmission Line Project |
33 |
12 |
3 |
9360 |
2082-02-26 |
Himalayan Energy Pvt.Ltd |
New Baneshwor |
Respective Switchyard of the project |
Singati s/s |
Survey Lic No: 692 Date: 2081-11-01 |
16 |
Balaju Singhdurbar (K3) Under Ground Transmission Line Project |
132 |
12 |
350 |
9498 |
2082-02-29 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Balaju S/S |
Singhdurbar K3 S/S |
Survey Lic No: 604 Date: 2080-03-13;Double ckt |
17 |
33 kV Transmission Line for Upper Deumai Hydropower Project (8.3MW) |
33 |
9 |
8.3 |
147 |
2082-04-05 |
Water Energy Solution Pvt. Ltd. |
Gatthaghar Madhyapur Thimi, Bhaktapur, Ph. No. 9854040509, email:- upperdeumai@g |
Switchyard of Upper Deumai Khola SHEP |
Godak Substation |
Survey Lic No: 541 Date: 2079-01-11;Single ckt |
18 |
Auraha Simara 132 kV Transmission Line Project |
132 |
7 |
200 |
606 |
2082-04-15 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Between T.N. 25&26 of Pathalaiya Parwani |
Simara S/S |
Survey Lic No: 584 Date: 2079-11-12:Double ckt |
19 |
Seti Khola HPP 132 kV Transmissin Line Project |
132 |
2 |
160 |
646 |
2082-04-18 |
Set Khola Hydropower Ltd. |
Kantipath,kathmandu |
Respective Switchyard of the project |
Lekhnath damauli LILO |
Survey Lic No: 696 Date: 2081-11-11;Double ckt |
20 |
Upper Arun Hydro Electric 400 kV Transmission Line |
400 |
6.5 |
1066 |
866 |
2082-04-26 |
Upper Arun Hydro Electric Limited |
Durbarmarg Kathmandu; 01-415322, Fax 01-4153040, E-mail: upperarun@nea.org.np |
UAHE Plant Switchyard |
Haitar S/S |
Survey Lic No: 460 Date: 2077-04-28;Double ckt |
21 |
Upper Irkhuwa khola HPP 33kV Transmission Line Project |
33 |
10 |
30.024 |
1217 |
2082-05-05 |
Aarati Power Company Limited |
Gahanapokhari, KTM-05; 01-4419321 |
Switchyard of Project |
NEA Sitalpati S/S |
Survey Lic No: 543 Date: 2079-01-11;single/Double ckt |
22 |
Kapilbastu Solar Power 33kV Transmission Line Project |
33 |
9 |
30 |
1650 |
2082-05-18 |
Prime Power Limited |
Tripureshwor-11,kathmandu |
Respective Switchyard of the project |
Chanauta s/s |
Survey Lic No: 707 Date: 2082-02-11 |
23 |
Chameliya (Chhetigad) HPP Transmission Line |
132 |
22 |
85 |
1737 |
2082-05-20 |
Grid Nepal Company Pvt. Ltd. |
Pandol Marg, Khursanitar Lazimpat, Kathmandu-03; |
Switchyard of Project |
NEA Balanch S/S |
Survey Lic No: 468 Date: 2077-05-24;Double Ckt |