S No Project Voltage (kV)

Line Length (km) Capacity (MW) Appn No Appn Date Promoter

Address Start Point

End Point

1 Padam Khola HEP Transmission Line Project 33 17 12.55 7026 2079-12-27 Dolti Power Company Ltd. Thapagaun Kathmandu Switchyard of Project NEA Dailekh S/S
2 Grid Connected Butwal Solar Project 33kV Transmission Line Project 33 7.5 8.5 7270 2081-03-05 Ridi Power Company Ltd. Trade Tower, Thapathali, Kathmandu switchyard of the project NEA Amuwa S/S
3 Midim1 HPP 33kV Transmission Line Project 33 15 13.424 4028 2082-01-23 Mount Rasuwa Hydropower Pvt. Ltd Dhapasi Respective Switchyard of the project Khudi s/s
4 Maakali Seti Cascade Peaking HPP 132kV Transmission Line Project 132 31 54 8505 2082-02-04 Surma Sarawor Hydropower Pvt.Ltd Samakhusi,kathmandu Respective Switchyard of the project Bajhang-Chainpur Hub
5 Malumela seti Nadi Peaking HPP 132kV transmission Line Project 132 22 72 8506 2082-02-04 Mata Malika Energy Multiple Pvt.Ltd Samakhusi,kathmandu Respective Switchyard of the project Bajhang-Chainpur Hub
6 Madkyu khola HPP 33kV Transmission Line Project 33 12.3 13 4991 2082-03-25 Sikles Hydropower Ltd. Kupondole Respective Switchyard of the project Switchyard of Upper Madi HPP
7 Parwanipur Solar 11kV Transmission Line Project 11 0.5 8 746 2082-04-20 Api Power Company Limited Thapathali,Kathmandu Respective Switchyard of the project Parwanipur s/s
8 Dallu Malika Solar 132kV Transmission Line Project 132 5.36 50 1016 2082-04-30 Vidhyut Utpadan CompNy Limited Buddhanagar Respective Switchyard of the project chupra s/s
9 Humla Karnali hub - Pulu Mugu 220 kV Transmission Line Project 220 45 800 1214 2082-05-05 Gajurmukhi Energy and Infrastructure Pvt.Ltd Kathmandu Humla Karnali hub Pulu Mugu s/s
10 Humla Karnal hub- Hilsa 400kV Transmission Line Project 400 80 1600 1215 2082-05-05 Gajurmukhi Energy and Infrastructure Pvt.Ltd Kathmandu Humla hub- Hilsa s/s
11 Humla Karnali hub - Loti Karnali 132kV Transmission Line Project 132 35 250 1216 2082-05-05 Gajurmukhi Energy and Infrastructure Pvt.Ltd Kathmandu Humla Karnali hub Loti Karnali s/s
12 Upper Madi 0 -Upper Madi HPPSwitchyard Transmission Line Project 132 14.6 43 1709 2082-05-19 Annapurna Power Company Limited Kathmandu-14 Respective Switchyard of the project Switchyard of Upper Madi HPP-LiLO at Mad
13 Middle Daram Khola-B HPP 33 kV Transmission Line Project 33 0.56 4 1947 2082-06-02 Milestone Hydropower P.Ltd Buddha Nagar,kathmandu Respective Switchyard of the project NEA,Harichaur s/s
14 Middle Daram Khola-A HPP 33 kV Transmission Line Project 33 2.4 4 1948 2082-06-02 White Gold Multi Energy P.Ltd Buddhanagar,kathmandu Respective Switchyard of the project Harichaur s/s
15 Thuligad HPP- Pahalmanpur s/s 33kV Transmission Line project 33 14 17 2468 2082-06-29 Om Power Company P.Ltd Chandragiri,Kathamandu Respective Switchyard of the project Pahalmanpur s/s
16 Tadi Ghyangphedi HPP-Samundratar 33 kV Transmission lIne Project 33 10 8 2921 2082-07-20 ABP Energy P.Ltd Panipokhari ,Kathmandu Respective Switchyard of the project Samundratar s/s
17 Lower Balephi -Lamosanghu s/s Transmission Line Project 33 11 20 2937 2082-07-20 Sajha Power Company Limited Thapathali,kathmandu Respective Switchyard of the project Lamosanghu s/s
18 Dobhan Khola HPP-Borang s/s 132kV Transmission Line Project 132 26.3 24.5 3739 2082-08-14 Dhobhan Khola Hydropower Limited Chandol,kathmandu Respective Switchyard of the project Borang s/s
19 Balephi A HPP -Pangtan 33 Kv Tramission Line Project 33 9 22.14 1581 2082-08-17 Moonlight Hydropower Company kalopul,Kathmandu Respective Switchyard of the project Pangtan s/s
20 Lapa Khola HP 33kV Transmission Line Project 33 1 4.72 3893 2082-08-19 Harmony Initiative P. Ltd Tokha,Kathmandu Respective Switchyard of the project Borang s/s
21 Super Ankhu Khola HPP 132kV Transmission Line Project 132 0.8 25.4 3949 2082-08-22 Gorakshya Hydropower Ltd Pashupati Vision ,Pingalastha,Kathmandu Respective Switchyard of the project Borang s/s
22 Upper Myagdi-1 HPP 132kV Transmission Line Project 132 1.46 53.5 3988 2082-08-23 Upper Myagdi Hydropower Limited Krishna galli,lalitpur Respective Switchyard of the project Dandakhet s/s
23 Sani Bheri 3 HPP-Bafikot s/s Transmission Line Project 132 4.5 47.72 4075 2082-08-25 Sani Bheri Hydropower Company Pvt.Ltd Budhanilkantha,kathmanu Respective Switchyard of the project Bafikot s/s