Updated on - Nov 7, 2025
| S No | Project | Voltage (kV) |
Line Length (km) | Capacity (MW) | Appn No | Appn Date | Promoter |
Address | Start Point |
End Point |
Remarks |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Padam Khola HEP Transmission Line Project | 33 | 17 | 12.55 | 7026 | 2079-12-27 | Dolti Power Company Ltd. | Thapagaun Kathmandu | Switchyard of Project | NEA Dailekh S/S | Single Circuit |
| 2 | Grid Connected Butwal Solar Project 33kV Transmission Line Project | 33 | 7.5 | 8.5 | 7270 | 2081-03-05 | Ridi Power Company Ltd. | Trade Tower, Thapathali, Kathmandu | switchyard of the project | NEA Amuwa S/S | old survery lisence cancelled |
| 3 | Midim1 HPP 33kV Transmission Line Project | 33 | 15 | 13.424 | 4028 | 2082-01-23 | Mount Rasuwa Hydropower Pvt. Ltd | Dhapasi | Respective Switchyard of the project | Khudi s/s | Single Ckt |
| 4 | Maakali Seti Cascade Peaking HPP 132kV Transmission Line Project | 132 | 31 | 54 | 8505 | 2082-02-04 | Surma Sarawor Hydropower Pvt.Ltd | Samakhusi,kathmandu | Respective Switchyard of the project | Bajhang-Chainpur Hub | Double Ckt |
| 5 | Malumela seti Nadi Peaking HPP 132kV transmission Line Project | 132 | 22 | 72 | 8506 | 2082-02-04 | Mata Malika Energy Multiple Pvt.Ltd | Samakhusi,kathmandu | Respective Switchyard of the project | Bajhang-Chainpur Hub | Double Ckt |
| 6 | Madkyu khola HPP 33kV Transmission Line Project | 33 | 12.3 | 13 | 4991 | 2082-03-25 | Sikles Hydropower Ltd. | Kupondole | Respective Switchyard of the project | Switchyard of Upper Madi HPP | Double Ckt |
| 7 | Parwanipur Solar 11kV Transmission Line Project | 11 | 0.5 | 8 | 746 | 2082-04-20 | Api Power Company Limited | Thapathali,Kathmandu | Respective Switchyard of the project | Parwanipur s/s | Single ckt |
| 8 | Lapang -Budhigandaki 220kV transmission line Project | 220 | 26 | 1200 | 908 | 2082-04-27 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Lapang s/s | Budhigandaki s/s | Double Ckt |
| 9 | Dallu Malika Solar 132kV Transmission Line Project | 132 | 5.36 | 50 | 1016 | 2082-04-30 | Vidhyut Utpadan CompNy Limited | Buddhanagar | Respective Switchyard of the project | chupra s/s | Single Ckt |
| 10 | Humla Karnali hub - Pulu Mugu 220 kV Transmission Line Project | 220 | 45 | 800 | 1214 | 2082-05-05 | Gajurmukhi Energy and Infrastructure Pvt.Ltd | Kathmandu | Humla Karnali hub | Pulu Mugu s/s | Double Ckt |
| 11 | Humla Karnal hub- Hilsa 400kV Transmission Line Project | 400 | 80 | 1600 | 1215 | 2082-05-05 | Gajurmukhi Energy and Infrastructure Pvt.Ltd | Kathmandu | Humla hub- | Hilsa s/s | Double Ckt |
| 12 | Humla Karnali hub - Loti Karnali 132kV Transmission Line Project | 132 | 35 | 250 | 1216 | 2082-05-05 | Gajurmukhi Energy and Infrastructure Pvt.Ltd | Kathmandu | Humla Karnali hub | Loti Karnali s/s | Double Ckt |
| 13 | Dhalkebar Solar PV Transmission Lone Project | 33 | 5.8 | 20 | 1359 | 2082-05-10 | Terra Solar energy Limited | Baluwatar,Kathmandu | Respective Switchyard of the project | NEA,Dhalkebar s/s | Single Ckt |
| 14 | Super Irkhuwa HPP switchyard -Sitalpati Transmission Line Project | 33 | 19 | 4.925 | 1567 | 2082-05-16 | Bhojpur Siwalaya Power Pvt.Ltd | Jadibuti,Kathmandu | Respective Switchyard of the project | Sitalpati s/s | Single Ckt |
| 15 | Kushaha Solar 132kV Transmission Line Project | 132 | 2.6 | 50 | 1678 | 2082-05-18 | Solaeris energy P.Ltd | Battisputali,Kathmandu | Respective Switchyard of the project | Kushaha s/s | Single Ckt |
| 16 | Upper Madi 0 -Upper Madi HPPSwitchyard Transmission Line Project | 132 | 14.6 | 43 | 1709 | 2082-05-19 | Annapurna Power Company Limited | Kathmandu-14 | Respective Switchyard of the project | Switchyard of Upper Madi HPP-LiLO at Mad | Single Ckt |
| 17 | Middle Daram Khola-B HPP 33 kV Transmission Line Project | 33 | 0.56 | 4 | 1947 | 2082-06-02 | Milestone Hydropower P.Ltd | Buddha Nagar,kathmandu | Respective Switchyard of the project | NEA,Harichaur s/s | Single Ckt |
| 18 | Middle Daram Khola-A HPP 33 kV Transmission Line Project | 33 | 2.4 | 4 | 1948 | 2082-06-02 | White Gold Multi Energy P.Ltd | Buddhanagar,kathmandu | Respective Switchyard of the project | Harichaur s/s | Single Ckt |
| 19 | Thuligad HPP- Pahalmanpur s/s 33kV Transmission Line project | 33 | 14 | 17 | 2468 | 2082-06-29 | Om Power Company P.Ltd | Chandragiri,Kathamandu | Respective Switchyard of the project | Pahalmanpur s/s | Double Ckt |
| 20 | Upper Apsuwa HPP-Sitalpati s/s 132kV Transmission Line Project | 132 | 22 | 35.15 | 2569 | 2082-07-02 | Ramjanaki Hydropower Private Limited | Kathmandu | Respective Switchyard of the project | Sitalpati s/s | Double Ckt |
| 21 | Tadi Ghyangphedi HPP-Samundratar 33 kV Transmission lIne Project | 33 | 10 | 8 | 2921 | 2082-07-20 | ABP Energy P.Ltd | Panipokhari ,Kathmandu | Respective Switchyard of the project | Samundratar s/s | Single Ckt |