1 |
Radhi small Hydropower 33kV Transmission line |
33 |
14 |
4.4 |
270 |
2073-08-27 |
2078-08-26 |
Radhi Bidhyut Company Limited |
Bluestar Complex, Tripureswor |
Switchyard of Project |
Khudi(Tarikuna) NEA Substation(Lamjung) |
Single Circuit |
2 |
Upper Naugad Gad Small HPP 33kV Transmission Line Project |
33 |
8 |
8 |
288 |
2074-02-01 |
2077-01-31 |
|
|
Switchyard of Upper Naugad Gad Small HPP |
Chameliya HPP, Balaanch S/S |
|
3 |
Singati HPP, Dolkha District |
132 |
0.5 |
25 |
364 |
2075-05-24 |
2077-05-23 |
Singati Hydro Energy Ltd. |
Naxal,Kathmandu ,Nepal |
Singati HPP |
singati substation |
Er. Niroj |
4 |
Tallo Modi Khola Hydro Power Project,Parvat District |
132 |
5 |
20 |
373 |
2075-08-09 |
2077-08-08 |
Shree Modi Energy Pvt.Ltd. |
Dillibazzar,Kathmandu 4441131,4441444,01-2003887 |
Switch yard of Tallo Modi Khola Hydro Po |
Switchyard of Tallo Modi 1 HPP |
First issued License(B.P.S 248) Cancelled on 2075-05-06 |
5 |
Kasuwa Khola Hydro Power's Transmission Line Project |
132 |
28.6 |
45 |
380 |
2075-09-29 |
2080-09-28 |
Kasuwa khola Hydro Power Ltd. |
Tripureshwor,Nepal Tel: 4222609 |
Switchyard of Kasuwa Khola Hydro Power P |
Sitalpati NEA Substation |
CANCELLED |
6 |
Grid connected Butwl Solar Project |
33 |
5.5 |
8.5 |
393 |
2076-02-03 |
2078-02-02 |
Ridi Hydro Power Development Co.Ltd. |
Fifth Floor,Trade Tower,Thapahali ,KTM |
Switchyard of Project |
Jogikuti Substation |
|
7 |
Upper Rawa Khola Hydropower Project |
33 |
3.8 |
3 |
449 |
2076-10-12 |
2078-10-11 |
Rawa Energy Development Pvt.Ltd. |
Ghattekulo Kathmandu 9851096066 |
Switchyard of Project (Khotang) |
Baksila NEA Substation(Khotang) |
|
8 |
Ikuwa Khola HPP Transmission Line Project |
132 |
3 |
30 |
477 |
2077-07-17 |
2082-07-16 |
Upper Arun Hudro-Electric Limited |
Durbar Marg, Kathmandu. 01-4117163/54/65; upperarun@nea.org.np |
Switch yard of Project |
Arun Hub Substation Haitar |
|
9 |
Nyasim Khola Hydropower Transmission Line Project |
132 |
8 |
35 |
479 |
2077-08-10 |
2082-08-09 |
Sita Hydro Power Company Pvt. Ltd. |
Kalimati-13, Kathmandu; 01-4672442, sitahydro@gmail.com |
Switchyard of Project |
NEA Pantan S/S Sindhupalchowk |
Double Circuit |
10 |
Ghunsa Khola HEP Construction Power Transmission Line |
33 |
35 |
5 |
486 |
2077-09-25 |
2082-09-25 |
Remit Hydro Ltd. |
Maharajgunj ,Kathmandu-03; 01-4424954,4430986 |
NEA Hiti S/S |
Power House Site of Ghunsa HEP |
Double Circuit |
11 |
West Seti Corridor (West Seti-Dododhara) 400 kV Transmission Line Project |
400 |
68 |
1500 |
487 |
2077-10-06 |
2082-10-05 |
Rastriya Prasaran Grid Company Limited |
DCC Bhawan Babarmahal, Kathmandu; 01-4266693; rpgcl.np@gmail.com |
Proposed West Seti S/S |
Proposed New Attariya S/S |
Double Circuit |
12 |
Lamhai Chhinchu 400kV Transmission Line Project |
400 |
94 |
1933 |
497 |
2078-04-07 |
2083-04-06 |
Nepal Electricity Authority |
Durbar Marg Kathmandu |
Lamhai S/S |
Proposed Chhichu S/S |
Double Circuit |
13 |
Chhinchu Dododhara 400 kV Transmission Line Project |
400 |
90 |
1933 |
500 |
2078-04-29 |
2082-04-28 |
Nepal Electricity Authority |
Durbar Marg Kathmandu |
Proposed Chhinchu S/S |
Proposed Dododhara S/S |
Double Circuit |
14 |
Sitalpati-Inaruwa 400 kV Transmission Line Project |
400 |
130 |
4400 |
506 |
2078-06-15 |
2082-06-14 |
Nepal Electricity Authority |
Durbar Marg Kathmandu |
NEA Sitalpati S/S |
NEA Inaruwa S/S |
Double Circuit |
15 |
Arun Hub (Sitalpati) -Tingla-Dudhkoshi 400 kV Transmission Line Project |
400 |
115 |
4400 |
507 |
2078-06-24 |
2082-06-23 |
Nepal Electricity Authority |
Durbar Marg Kathmandu |
Sitalpati S/S |
Proposed Dudhkoshi S/S |
Double Circuit |
16 |
Jum Khola Transmission Line Project |
132 |
37 |
56 |
508 |
2078-06-24 |
2082-06-23 |
Sanima Jum Hydropower Ltd. |
P.O.Box: 19737 Dhumbarahai, KTM 01-4373030; sanima@sanimahydro.com |
Switchyard of Project |
NEA Garjyang S/S |
Double Circuit |
17 |
Simbuwa 220 kV Transmission Line Project |
220 |
3.2 |
70.3 |
509 |
2078-07-22 |
2082-07-21 |
Simbuwa Remit Hydro Ltd. |
Maharajgunj ,Kathmandu-03; 01-4445857, info@srhl.org.np |
Switchyard of Project |
Switchyard of Ghunsa Khola HEP |
Double Circuit |
18 |
Lamabagar Barhabise 220kV Transmission Line Project |
220 |
43 |
1240 |
511 |
2078-07-25 |
2082-07-24 |
Rastriya Prasaran Grid Company Limited |
DCC Bhawan Babarmahal, Kathmandu; 01-4266693; rpgcl.np@gmail.com |
Proposed Lamabagar S/S |
NEA Barhabise S/S |
Double Circuit |
19 |
Lower Apsuwa Hydropower Transmission Line Project |
132 |
19 |
54 |
534 |
2078-12-07 |
2082-12-06 |
Mizu Energy Ltd. |
Hyatt Place Soalteemode KTM; 01-4671200 |
Switchyard of Project |
NEA Sitalpati S/S |
Double Circuit |
20 |
Grid connected solar power project 11kV transmission line |
11 |
4 |
2 |
556 |
2079-04-08 |
2081-04-07 |
Sourya Vidhyut Power Pvt. Ltd. |
Narayanchaur, Naxal-01, Kathmandu |
Switchyard of the project |
33/11 Kv NEA Parasi substation |
Single Circuit |
21 |
Upper Mardi Khola Hydro Power Transmission Line Project |
33 |
12 |
7 |
558 |
2079-04-18 |
2083-04-17 |
United Idi Mardi and RB Hydropower Ltd. |
Lekhnath-7, Pokhara; unitedidimardi7mw@gmail.com, 061-465806,01-5012027 |
Switchyard of Project |
NEA Lahacowk S/S |
Single Circuit |
22 |
Chhujung Khola & Bakan Khola Joint 220 kV Transmission Line Project |
220 |
55 |
107 |
560 |
2079-05-02 |
2082-05-01 |
Sangrila Urja Pvt. Ltd. |
Anamnagar 29 Kathmandu, 9851175012 |
Switchyard of Chhujung Khola Project |
NEA Sitalpati S/S |
Double Circuit |
23 |
Darbang Myagdi HEP Transmission Line Project |
132 |
6.3 |
25 |
561 |
2079-05-08 |
2083-05-07 |
Dhaulagiri Kalika Hydro Pvt. Ltd. |
Gyaneswor 30, KTM, 01-4536819, info@darbanghydro.com |
Switchyard of Project |
NEA Dadakhet S/S |
Single Circuit |
24 |
West Seti (Banlek) Dododhara Transmission Line Project |
400 |
80 |
2250 |
568 |
2079-07-20 |
2082-07-19 |
Rastriya Prasaran Grid Company Limited |
Bbarmahal-11 Kathmandu; 01-4266693 |
Proposed West Seti S/S |
Proposed Dododhara S/S |
Double Circuit |
25 |
Sitalpati Dhungesanghu Transmission Line Project |
220 |
48 |
600 |
570 |
2079-07-28 |
2082-07-27 |
Rastriye Prasaran Grid Company Limited |
Babarmahal-11 Kathmandu; 01-4266693 |
NEA Sitalpati S/S |
NEA Dhungesanghu S/S |
Double Circuit |
26 |
Mugu Karnali 400kV Transmission Line Project |
400 |
40 |
1902 |
571 |
2079-08-06 |
2082-08-05 |
Vidhyut Utpadan Company Limited |
BPC Building Rudramati Marg, Buddhanagar KTM-10 |
Switchyard of Project |
RPGCL Phukot S/S |
Double Circuit |
27 |
Sona Khola 33 kV Transmission Line Project |
33 |
6 |
9 |
578 |
2079-10-04 |
2082-10-03 |
Himali Hydro Fund Ltd. |
Mid Baneswor Kathmandu-32; 014109156 |
Switchyard of Project |
Mewa S/S |
Single Circuit |
28 |
LILO of Tanhu-Bharatpur Transmission Line with Damauli-Lekhnath Transmission Lin |
220 |
0.98 |
150 |
585 |
2079-11-15 |
2082-11-14 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Tanhu Bharatpur TL@Byas Tanhu |
Damauli Lekhnath TL@Byas Tanhu |
Multi Circuit |
29 |
Khimti Rakathum 132 kV Transmission Line Project |
132 |
29 |
238 |
588 |
2079-12-09 |
2082-12-08 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Proposed Rakathum S/S |
NEA New Khimti S/S |
Double Circuit |
30 |
Phukot Ranchuli 132 kV Transmission Line Project |
132 |
36 |
238 |
589 |
2079-12-09 |
2082-12-08 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Phukot S/S |
Ranchuli S/S |
Double Circuit |
31 |
Dukuchhap New Teku 220 kV transmission Line Project |
220 |
12 |
1200 |
590 |
2079-12-09 |
2082-12-08 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Proposed Dukuchap S/S |
Proposed Teku S/S |
Multi/Double Circuit |
32 |
Matatirtha-Dukuchhap 220 kV Transmission Line |
220 |
12 |
1200 |
591 |
2079-12-12 |
2082-12-11 |
Nepal Electricity Authority |
Durbarmarg, kathmandu |
Matatirtha S/S |
Bifurcation Point (Dukuchhap-New Teku 22 |
Double Circuit, Twin Moose Conductor |
33 |
Bajhang Banlek (West Seti) 400 kV Transmission Line Project |
400 |
55 |
2500 |
593 |
2079-12-20 |
2082-12-19 |
Rastriya Prasaran Grid Company Limited |
BPC complex Buddhanagar Kathmandu, 01-4610103 |
Bajhang S/S |
Banlek S/S |
Double Circuit |
34 |
Madhya Tara Khola 33 kV Transmission Line |
33 |
5.2 |
2.2 |
595 |
2080-01-10 |
2083-01-09 |
Madhya Tarakhola Hydropower Pvt. Ltd. |
New Baneshwor-10, Kathmandu, Phone No. 01-4785232, email-madhya.tarakhola@gmail. |
Madhya Tara Khola Switchyard |
Daram Khola A Switchyard |
Single Circuit |
35 |
Okharpauwa Tinpiple 220 kV Transmission Line Project |
220 |
4 |
1100 |
596 |
2080-01-26 |
2083-01-25 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Okharpauwa |
Tinpiple S/S |
Multi Circuit |
36 |
Mewa Kola 132 k V Transmission Line Project |
132 |
5 |
23 |
597 |
2080-02-05 |
2083-02-04 |
Union Mewa Hydro Limited |
Lalitpur-2, Kupandole 01-5911208 |
Switchyard of Project |
Mewa khola s/s |
Single Circuit |
37 |
Laphsiphedi-Kapan Gumba- Tinpiple 220 kV TL |
220 |
36.5 |
1083 |
599 |
2080-02-21 |
2083-02-20 |
Nepal Electricity Authority |
Durbarmarg. kathmandu |
Laphsiphedi S/S |
Tinpiple S/S |
Double Circuit with Substation at Kapan Gumba |
38 |
Syaule Sanphebagar 132 kV Transmission Line Project |
132 |
70 |
200 |
601 |
2080-03-07 |
2083-03-06 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
NEA Syaule S/S |
Proposed Sanphebagar S/S |
Double Circuit |
39 |
Karuwa Seti HEP Transmission Line Project |
132 |
11 |
32 |
602 |
2080-03-07 |
2083-03-06 |
Jhyamolongma Hydropower Development company Ltd. |
Pokhara Lekhnath -11 Kaski, 061-465806 |
Switchyard of Project |
Switchyard of Seti Nadi HEP |
Double Circuit |
40 |
Sirutar Harisiddhi Patan Underground Transmission Line Project |
132 |
11.64 |
340 |
607 |
2080-04-09 |
2082-04-08 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
SIrutar S/S |
Patan S/S |
Double Circuit |
41 |
Super Lower Bagmati Transmission Line Project |
132 |
30 |
41.86 |
608 |
2080-04-15 |
2083-04-14 |
Super Bagmati Hydropower Pvt. Ltd. |
Rabibhawan Kathmandu; 01-4670518 |
Switchyard of Project |
NEA Chandrapur S/S |
Single Circuit |
42 |
Bhaktapur Sirutar 132 kV Under Ground Transmission Line Project |
132 |
7 |
200 |
609 |
2080-05-07 |
2082-05-06 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Bhaktapur S/S |
Sirutar S/S |
Double Circuit |
43 |
Chulepu Khola Transmission Line project |
33 |
13 |
8.52 |
610 |
2080-05-24 |
2082-08-23 |
Chandeswari Mahadev Khola Micro Hydro Pvt. Ltd. |
Bhaktapur |
Switchyard of Project |
Bamati S/S |
Single Circuit |
44 |
Bhotekoshi-1 HEP Transmission Line Project |
132 |
1.4 |
44 |
611 |
2080-05-24 |
2082-05-23 |
Electro Power Co. Ltd. |
Baneswor 31, KTM; 01-4444947 |
Switchyard of Project |
TL of Upper Chaku A T.N. 6 |
Double Circuit |
45 |
Istul Khola SHP Transmission Line Project |
33 |
6.84 |
1.506 |
612 |
2080-06-16 |
2082-06-15 |
Amar Jyoti Hydropower Pvt. Ltd. |
Tahachal Kathmandu-13; 9851191418 |
Switchyard of Project |
NEA Masel S/S |
Single Circuit |
46 |
Dododhara New Attariya (Daijee) Transmission Line and Substation Project |
400 |
103 |
2000 |
614 |
2080-06-29 |
2082-06-28 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
RPGCL Dododhara |
NEA New Attsariya |
Double Circuit |
47 |
Myagadi Corridor combined 33 kV Construction Power Transmission Line |
33 |
15.1 |
4 |
615 |
2080-06-29 |
2082-06-28 |
Hydro Village Pvt. Ltd. |
Krishna Galli Lalitpur; 01-5423960 |
Headwork of Upper Myagdi-1 HEP |
Headworks of Myagdi Khola HEP |
Single Circuit |
48 |
EIlep Tatopani HEP Transmission Line Project |
132 |
27 |
25 |
616 |
2080-07-03 |
2082-07-02 |
Jalshakti Hydro Company Pvt. Ltd. |
Kathmandu-02, Lazimpat |
Switchyard of Project |
Trishuli 3B Hub Substation |
Single Circuit |
49 |
Balaju Syuchatar 132 kV Under Ground Transmission Line Project |
132 |
4.82 |
300 |
617 |
2080-07-21 |
2082-07-20 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Balaju S/S |
Syuchatar S/S |
Double Circuit |
50 |
Humla Phukot Transmission Line Project |
400 |
85 |
2250 |
618 |
2080-08-10 |
2082-08-09 |
Rastriya Prasaran Grid Company Limited |
Buddhanagar Kathmandu-10;01-4610103, info@rpgcl.com |
Humala S/S |
Phukot S/S |
Double Circuit |
51 |
Singhadurbar Maitidevi Chabahilll 132 kV Under Ground Transmission Line Project |
132 |
4.73 |
300 |
619 |
2080-08-10 |
2082-08-09 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Singhadurbar K3 S/S |
Chabahill S/S |
Double Circuit |
52 |
Chabahil Kapan Gumba 132 kV Transmission Line Project |
132 |
6.75 |
300 |
620 |
2080-08-12 |
2082-08-11 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Chabahil S/S |
Kapan Gumba S/S |
Double Circuit |
53 |
Super Melamchi Hydro Power Transmission Line Project |
132 |
20 |
23.6 |
621 |
2080-09-08 |
2082-09-07 |
Milarepa Energy Pvt. Ltd, |
Bajramarg Ramhiti Baudha-6 Kathmandu |
Switchyard of Project |
NEA Samundratar S/S |
Single Circuit |
54 |
Manang Marshyangdi Hydro Transmission Line Project |
220 |
2.5 |
135 |
622 |
2080-09-24 |
2082-09-23 |
Manang Marshyangdi Hydropower Co. Pvt. Ltd. |
253 Kantuhiti Marga, Sanepa-02 Lalitpur Neapal |
Switchyard of Project |
NEA Dharapani S/S |
Double Circuit |
55 |
Upper Sankhuwa Khola Transmission Line Project |
132 |
19 |
40 |
623 |
2080-10-09 |
2082-10-08 |
Happy Energy Pvt. Ltd. |
Hadigaoun Kathmandu 01-4426248 |
Switchyard of Project |
NEA Sitalpati S/S |
|
56 |
Dar Khola HPP 33 kV Transmission Line Project |
33 |
7 |
6.5 |
624 |
2080-11-03 |
2082-11-02 |
Dar Khola Hydropower Pvt. Ltd. |
Samakhusi Kathmandu |
Switchyard of Darkhola HPP |
NEA Dadakhet S/S |
Single Circuit |
57 |
Mid Hongu Khola A - Mid Hongu Khola B 132 kV Transmission Line Project |
132 |
5.6 |
22 |
625 |
2080-11-04 |
2082-11-03 |
Apex Makalu HPL |
New Baneswor KTM; apex.makalu@gmail.com |
Switchyard of Project |
S/Y of Md Hongu Khola B |
Single Circuit |
58 |
Tamor Khola-5 to Dhungesanghu Transmission Line Project |
132 |
29 |
37.52 |
626 |
2080-12-04 |
2082-12-03 |
River Side Hydro Energy Ltd. |
Kathmandu-30, Dillibazar; 01-4527090 |
Switchyard of Project |
NEA Dhungesanghu S/S |
Single Circuit |
59 |
Himal Iron & Steel Factory to Parwanipur Transmission Line Project |
132 |
1.4 |
30 |
628 |
2080-12-07 |
2082-12-06 |
Himal Iron and Steel Pvt. Ltd. |
Jyoti Bhawan, Kantipath KTM, 01 4226327 |
NEA Parwanipur S/S |
Himal Factory Premises |
Single Circuit |
60 |
Doodhkoshi Dam Toe - Sitalpati Tingla Doodhkoshi Transmission Line AP51-52 Proje |
400 |
1.5 |
500 |
629 |
2080-12-08 |
2082-12-07 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Switchyard of Dam Toe Project |
LILO at S-T-D 400kV Line |
Double Circuit |
61 |
Surke Doodhkoshi New Khimti Transmission Line Project |
220 |
66.6 |
188 |
630 |
2080-12-08 |
2082-06-07 |
Summit Power Company Pvt. Ltd. |
TRipureshwor Kathmandu |
Switchyard of Project |
New Khimti S/S |
Double Circuit |
62 |
Super Seti Lahachowk Transmission Line Project |
132 |
18 |
24 |
631 |
2080-12-08 |
2082-12-07 |
SN Energy Pvt. Ltd. |
Mahalaxmi-6, Lalitpur. 01-5913982 |
Switchyard of Super Seti Project |
NEA Lahacowk S/S |
Single Circuit |
63 |
Kasuwa Khola-Sitalpati 132 kV Transmission Line Project |
132 |
29 |
45 |
633 |
2080-12-27 |
2082-12-26 |
Kasuwa Khola Hydropower Limited |
Tripureswor-11, Kathmandu; 01-4101140 |
Switchyard of Project |
NEA Sitalpati S/S |
Single Circuit |
64 |
Dana khola - Dharapani Transmission Line Project |
220 |
5.5 |
49.95 |
634 |
2080-12-27 |
2082-12-26 |
Lalupate Hydropower Company Pvt. Ltd. |
Bagbazar Kathmandu 01-4251037 |
Switchyard of Project |
NEA Dharapani S/S |
Single Circuit |
65 |
Super Iwa Khola- Amarpur Transmission Line Project |
33 |
24 |
4.795 |
635 |
2080-12-27 |
2082-12-26 |
Kanchanjangha Hydro Energy Pvt. Limited |
Koteswor Kathmandu |
Switchyard of Project |
NEA Amarpur S/S |
Single Circuit |
66 |
West Seti Switchyard to West Seti Hub Sub Station Transmission Line Project |
400 |
4.5 |
750 |
637 |
2081-01-27 |
2083-01-26 |
NHPC Limited |
Sector 33 Faridabad Haryana India |
Switchyard of WS Project |
RPGCL Banlek S/S |
Double Circuit |
67 |
Nalgad Bafikot 400 kV Transmission Line Project |
400 |
20 |
2250 |
638 |
2081-01-27 |
2083-01-26 |
Rastriya Prasaran Grid Company Limited |
Buddhanagar Kathmandu-10; 01-4610103, info@rpgcl.com |
Nalgad S/S |
Bafikot S/S |
Double Circuit |
68 |
Upper Balephi Pantang Transmission Line Project |
132 |
11 |
46 |
639 |
2081-01-27 |
2083-01-26 |
Upper BAlephi Hydropower Ltd. |
Ratopul Kathmandu |
Switchyard of Project |
NEA Pantang S/S |
Single Circuit |
69 |
Sankhuwa Khola- Sitalpati Transmission Line Project |
132 |
4 |
41.06 |
636 |
2081-01-28 |
2083-01-27 |
Guras Hydro Pvt. Ltd. |
Bhanimandal, Lalitpur-4; 01-5535015 |
Switchyard of Project |
NEA Sitalpati S/S |
Single Circuit |
70 |
Upper Junbesi- Lower Dudhkunda- Tingla 33 kV Transmission Line Project |
33 |
25 |
14.18 |
640 |
2081-02-04 |
2083-02-03 |
Gorkhas Himalyan Hydro Ltd. |
Kathmandu-31 |
Switchyard of Upper Junbesi HPP |
NEA Tingla S/S |
Double Circuit |
71 |
Plaun Kola small HPP 132 kV Transmission Line Project |
132 |
3 |
21 |
642 |
2081-02-30 |
2083-02-29 |
Palun Khola Hydropower Limited |
Lalitpur-10, Kupandole; 01-4527090 |
Switchyard of Project |
RPGCL,Mewa S/S |
Single Circuit |
72 |
Nyadi Phidi HPP Switchyard - Nyadi HPP Switchyard |
132 |
14 |
21.4 |
643 |
2081-02-31 |
2083-02-30 |
North Summit Hydro Limited |
Babarmahal-11 , Kathmandu |
Nyadi Phidi HPP Switchyard |
Nyadi HPP Switchyard |
single circuit |
73 |
Kalika Kaligandaki - New Bharatpur Transmission Line Project |
132 |
12 |
38.16 |
644 |
2081-02-31 |
2083-02-30 |
Maula Kalika Hydropower Company Ltd. |
New Baneswor Kathmandu 01-5913897 |
Switchyard of Project |
New Bharatpur S/S |
Single Circuit |
74 |
Upper Bramhayani - Pangtang 132 kV Transmission Line Project |
132 |
16 |
51.67 |
645 |
2081-03-11 |
2083-03-10 |
Intergreted Hydro Fund Nepal Pvt. Ltd. |
Kathmandu |
switchyard of Upper Bramhayani |
NEA Pangtang S/S |
Upper Bramhayani switchyard- Bramhyanai switchyard- NEA Pangtang S/S |
75 |
Bajhang Mathillo Seti HPP-Lamki Substation 132 kV Transmission Line Project |
132 |
140 |
216 |
646 |
2081-03-21 |
2083-03-20 |
Samriddhi Energy Ltd. |
Anamnagar, Kathmandu |
switchyard of the project |
NEA lamki S/S |
Double circuit |
76 |
Nijgadh-Harnaiya 400kV Transmission Line Project |
400 |
35 |
1000 |
647 |
2081-03-27 |
2083-03-26 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Nijgadh NEA Substation |
Harnaiya NEA Substation |
Double Circuit |
77 |
Lower Mid Rawa Khola HPP -Wakshila 33 kV Transmission line Project |
33 |
7 |
4 |
648 |
2081-04-08 |
2083-04-07 |
Lower Mid Rawa Khola HPP,Pvt.Ltd |
Maharajgunj, Kathmandu |
Respective Switchyard of the project |
Wakshila s/s |
Single Ckt |
78 |
Aayu Malun to Tingla Transmission Line Project |
132 |
18.5 |
21 |
649 |
2081-04-13 |
2083-04-12 |
Puwa Khola-1 Hydropower Ltd |
Anamnagar Kathmandu-29; 01-4102710 |
Switchyard of Project |
NEA Tingla S/S |
Single Circuit |
79 |
Mathilo Maiwa HPP- Dhungesanghu 132 kV Transmission Line Project |
132 |
5 |
17.85 |
650 |
2081-04-15 |
2083-04-14 |
Kang Hydropower Company Ltd. |
Koteshwor,Kathmandu |
Respective Switchyard of the project |
Dhungesanghu s/s |
Single Ckt |
80 |
Ratnapark -Thapathali Underground 132 kV Transmission Line Project |
132 |
2.4 |
340 |
653 |
2081-04-28 |
2083-04-27 |
Nepal Electricity Authority |
Darbarmarg,Kathmandu |
Ratnapark s/s |
Thapathali s/s |
Double Ckt |
81 |
Super Ghalemdi -Dana 33 kV Transmission Line Project |
33 |
5.8 |
9.14 |
654 |
2081-04-32 |
2083-04-31 |
Super Ghalemdi Hydropower Pvt. Ltd. |
Tangal , Kathmandu |
switchyard of the project |
NEA Dana S/S |
|
82 |
Tamor-Mewa HPP -Dhungesanghu 220kV Transmission Line Project |
220 |
7 |
128 |
655 |
2081-05-06 |
2083-05-05 |
Spark Hydroelectric Company Ltd. |
Gyaneswor,Kathmandu |
Respective Switchyard of the project |
Dhungesanghu s/s |
Double Ckt |
83 |
Syarpu SHP Transmission Line Project |
33 |
9 |
3.3 |
657 |
2081-05-28 |
2083-05-27 |
Syarpu Power Company Limited |
Musikot Rukum, 9851180511, opradip11@gmail.com |
Switchyard of Project |
Musikot S/S |
Single Circuit |
84 |
Shyam Khola HPP 33 kV Transmission Line Project |
33 |
9.7 |
7.25 |
659 |
2081-06-02 |
2083-06-01 |
S.K.Energy Development Ltd. |
Jadibuti,Kathmandu |
Respective Switchyard of the project |
Shitalpati S/S |
B.Pra.Sa.536 cancelled,Single ckt |
85 |
Myagdi corridor 132 kV combined Transmission Line Project |
132 |
15.3 |
155.5 |
660 |
2081-06-06 |
2083-06-05 |
Hydro Village Ltd. |
Krishna galli,lalitpur |
Switchyard of Myagdi Khola HPP |
Dandakhet s/s |
Double Ckt. Multi ckt |
86 |
Mid Rawa HPP 33kV Transmission Line Project |
33 |
6.45 |
2.5 |
661 |
2081-06-06 |
2083-06-05 |
Halesi Urja Pvt.Ltd |
Anamnagar,Kathmandu |
Respective Switchyard of the project |
Wakshila s/s |
Single Ckt |
87 |
Induwa Khola PROR HPP 132 kV Transmission Line Project |
132 |
9 |
24.921 |
662 |
2081-06-06 |
2083-06-05 |
Vision Tesla Power Pvt.Ltd. |
Chabahil ,Kathamndu |
Respective Switchyard of the project |
Isuwa Khola Cascade PROR HPP |
Single Ckt |
88 |
Lamahi-Napalgunj 220kV Transmission Line Project |
220 |
83 |
2000 |
663 |
2081-06-06 |
2083-06-05 |
NEA |
Durbarmarg,Kathmandu |
New Lamahi s/s |
Bhawaniyapur s/s |
Multi ckt |
89 |
Thaligaad Sana Khola HPP 33kV Transmission Line Project |
33 |
0.5 |
2 |
664 |
2081-06-07 |
2083-06-06 |
Trikal Power Company Pvt.Ltd |
Shankhamul,Kathmandu |
Respective Switchyard of the project |
Dhap s/s |
Single Ckt |
90 |
Seti River-6 HPP 400kV Transmission Line Project |
400 |
29.37 |
420 |
665 |
2081-06-07 |
2083-06-06 |
NHPC Limited |
Faridaabad,India |
Respective Switchyard of the project |
Betan pooling Station |
Double Ckt |
91 |
Isuwa Khola PROR HPP 132 kV Transmission Line Project |
132 |
20 |
172.171 |
666 |
2081-06-16 |
2083-06-15 |
Isuwa Energy Pvt.Ltd. |
Hadigaun,Kathmandu |
Respective Switchyard of the project |
Shitalpati S/S |
Double Ckt |
92 |
Damak-Keroun- Biratnagar 132 kV Transmission line Project |
132 |
72 |
200 |
667 |
2081-06-18 |
2083-06-17 |
Nepal Electricity Authority |
Darbarmarg ,Kathmandu |
Padjungi s/s |
Biratnagar s/s |
Double Ckt,Undergroung 7 km |
93 |
Marsyangdi Nadi PROR - Markichowk 220 kV Transmission Line Project |
220 |
11.6 |
90 |
668 |
2081-07-02 |
2083-07-01 |
M.A Power Pvt. Ltd. |
Baluwatar , Kathmandu |
switchyard of the project |
NEA Markichowk S/S |
single circuit |
94 |
LapcheTamakoshi HPP 132 kV Transmission Line Project |
132 |
50.75 |
42 |
669 |
2081-07-02 |
2083-07-01 |
Dynamic Hydro Energy Pvt.Ltd. |
Gyaneshwor,Kathmandu |
Respective Switchyard of the project |
Barabise s/s |
Double Ckt |
95 |
Dudhkoshi 6 HEP Transmission Line Project |
220 |
67 |
171 |
671 |
2081-07-05 |
2083-07-04 |
Sagarmatha Hydropower Pvt. Ltd. |
Heritage Plaza, Kamaladi-28 KTM, 01-442672 |
Switchyard of Project |
NEA New Khimti S/S |
Double Circuit |
96 |
Super Ankhukhola HPP 132kv Transmission Line Project |
132 |
4.09 |
25.4 |
673 |
2081-08-02 |
2083-08-01 |
Gorakshya Hydropower Limited |
Pinglasthan,Kathmandu |
Respective Switchyard of the project |
LILO switchyard of ILEP(Tatopani) |
Single Ckt |
97 |
Upper Trishuli-1 Cascade HPP Transmission Line Project |
132 |
8 |
24.6 |
674 |
2081-08-13 |
2083-08-12 |
Trishuli Cascade Power Pvt.Ltd |
Naxal Colony Marg,Kathmandu |
Respective Switchyard of the project |
Trishuli 3B Hub Station |
Single ckt |
98 |
Malta Bagmati HPP 33 KV Transmission Line Project |
33 |
5 |
6.5 |
675 |
2081-08-13 |
2083-08-12 |
Bagmati Water Energy Pvt. Ltd. |
KMC-16, Banasthali, Kathmandu |
SY of Project |
Malta S/S |
|
99 |
Lower Arun HPP 400 kV Transmission Line Project |
400 |
1.002 |
669 |
676 |
2081-08-19 |
2083-08-18 |
SJVN Lower Arun Power Development Company Pvt. Ltd. |
Khadbari, Sankhuwasabha |
switchyard of the project |
Arun-3 LILO |
Multi circuit, Lower Arun HEP - 669 MW + Arun-3 HEP-900 MW |
100 |
Pikhuwa Pashupati Hydropower Project |
33 |
30 |
4.1 |
677 |
2081-09-02 |
2083-09-01 |
Sumnima Hydropower Company Private Limited |
Hulak Yol Marga,kathmandu |
Respective Switchyard of the project |
Tumlingtar s/s |
Single ckt |
101 |
Upper Dudhkhola HPP 132 kV Transmission Line Project |
132 |
4 |
30.4 |
679 |
2081-09-02 |
2083-09-01 |
Carbonless Energy Fund Pvt.Ltd |
Kalimati,Kathmandu |
Respective Switchyard of the project |
Switchyard of Dudhkhola HPP |
Single Ckt |
102 |
Madhya Tadi Khola 33 KV TL Project |
33 |
7 |
5.5 |
678 |
2081-09-03 |
2083-09-02 |
Dupcheswor Mahadev Hydro Co. Pvt. Ltd. |
K.M.C-3, Maharajgunj, Kathmandu |
Switchyard |
Samundratar S/S |
Single ckt |
103 |
Gandak-Nepalgunj 220kV Transmission Line Project (Gandak_Parasi section) |
220 |
12 |
1000 |
680 |
2081-09-08 |
2083-09-07 |
NEA |
Darbarmarg,Kathmandu |
Gandak s/s |
Parasi s/s |
Double Ckt |
104 |
Dukuchhap Sunakothi 132kV Transmission Line Project |
132 |
7.2 |
242 |
681 |
2081-09-08 |
2083-09-07 |
NEA |
Darbarmarg, Kathmandu |
Tika Bhairab LILO |
Sunakothi s/s |
Double ckt ,Monopole |
105 |
Gandak-Nepalgunj 220kV Transmission Line Project (Shivapur-Kalakate-Lamahi secti |
220 |
70 |
1000 |
682 |
2081-09-09 |
2083-09-08 |
NEA |
Durbarmarg, Kathmandu |
Shivapur LILO |
New Lamahi s/s |
Double Ckt |
106 |
Sanfebagar-Basti-Betan 132kV Transmission Line Project |
132 |
48 |
85 |
683 |
2081-09-11 |
2083-09-10 |
RPGCL |
Budhanagar,Kathmandu |
Switchyard of Budhiganga |
400kV Betan s/s |
Double Ckt |
107 |
Suti Khola HPP 132 kV Transmission Line Project |
132 |
10.6 |
21 |
684 |
2081-10-02 |
2083-10-01 |
Nilganga Hydropower Company Pvt.Ltd |
Tinkune,Kathmandu |
Respective Switchyard of the project |
Dharapani s/s |
Single Ckt |
108 |
Bhotekoshi-5 HPP Transmission Line Project |
220 |
5.5 |
46 |
685 |
2081-10-08 |
2083-10-07 |
Kalika Energy Limited |
Baluwatar,Kathmandu |
Respective Switchyard of the project |
Barabishe s/s |
Single Ckt |
109 |
Upper Kabeli HPP 132kV Transmission Line Project |
132 |
12 |
28.1 |
686 |
2081-10-08 |
2083-10-07 |
Peace Energy Company P.Ltd |
Battisputali,Kathmandu |
Respective Switchyard of the project |
Amarpur s/s |
Single Ckt |
110 |
Machha Khola 132 KV Transmision line Project |
132 |
23.9 |
16 |
687 |
2081-10-15 |
2083-10-14 |
Water Energy Development Pvt.Ltd |
Baluwatar,Kathmandu |
Respective Switchyard of the project |
Borang s/s |
Double Ckt |
111 |
Jagdulla PROR HPP 132 kV Transmission Line Project |
132 |
50 |
106 |
688 |
2081-10-22 |
2083-10-21 |
Jagdulla Hydropower Company Limited |
New Baneswor |
Respective Switchyard of the project |
NEA,Bafikot |
Double Ckt |
112 |
Upper Chauri Khola small HPP 33kV Transmission Line Project |
33 |
2 |
6 |
689 |
2081-10-22 |
2083-10-21 |
Himalayan water resources & Energy developent Company Pvt.Ltd |
Baneswor,Kathmandu |
Respective Switchyard of the project |
Madankudari s/s |
Singlr ckt |
113 |
Mathilo Bhurundi- A HPP 33 kV Transmission Line Project |
33 |
9.1 |
9 |
690 |
2081-10-23 |
2083-10-22 |
Niko Energy Ltd. |
Baneshwor,Kathmandu |
Respective Switchyard of the project |
Modi s/s |
Single Ckt |
114 |
Jurimba Khola small HPP 132 kV Transmission Line Project |
132 |
5 |
7.63 |
691 |
2081-10-25 |
2083-10-24 |
Jurimba Hydropower Company Pvt. Ltd. |
Tikune,Kathmandu |
Respective Switchyard of the project |
Switchyard of Upper Chaku A HPP |
Single Ckt |
115 |
Chepe Khola cascade HPP 33 kV transmission Line Project |
33 |
2 |
2 |
693 |
2081-11-02 |
2083-11-01 |
Aasutosh Energ Limited |
Gyaneshwor,kathmandu |
Respective Switchyard of the project |
Switchyard of Chepe Khola small FPP(LILO |
Single Ckt |
116 |
Tadi Khola small HPP 33 kV Transmission Line Project |
33 |
2.5 |
6.6 |
694 |
2081-11-04 |
2083-11-03 |
Hiraratna Hydropower Ltd. |
Kathmandu |
Respective Switchyard of the project |
Samundratar s/s |
Single Ckt |
117 |
Arga Solar PV 33kV Transmission Line Project |
33 |
4 |
10 |
695 |
2081-11-04 |
2083-11-03 |
Arga Bhagbati Ventures Private Limited |
Bohoratar,kathmandu |
Respective Switchyard of the project |
Arga s/s |
Single Ckt |
118 |
Gandak-Nepalgunj(New Butwal-Parasi- Shivpur ) 220kV Transmission Line Project |
220 |
115 |
2000 |
697 |
2081-11-19 |
2083-11-18 |
NEA |
Darbarmarg, Kathmandu |
New Butwal s/s |
Shivapur s/s |
Multi ckt |
119 |
Isuwa Khola HPP 132 kV Transmission Line Project |
132 |
1 |
97.2 |
698 |
2081-11-27 |
2083-11-26 |
K.B.N.R Isuwa Power Limited |
Kalopul,kathmandu |
Respective Switchyard of the project |
Switchyard of Isuwa Cascade PROR HPP |
Double Ckt |
120 |
Chino Khola HPP 33 kV transmission Line project |
33 |
1.14 |
7.9 |
699 |
2081-11-28 |
2083-11-27 |
Chino Hydropower Limited |
Gangadevi Marga,Buddhanagar |
Respective Switchyard of the project |
Dharapani s/s |
Single Ckt |
121 |
Tinpiple-Balaju 132kV Transmission line Project |
132 |
6 |
1000 |
700 |
2081-12-07 |
2083-12-06 |
Nepal Electricity Authority |
Darbarmarg,Kathmandu |
Tinpiple s/s |
Balaju s/s |
Multi Ckt |
122 |
Budhigandaki Nadi HPP 220kV Transmisssion Line Project |
220 |
56 |
91.15 |
701 |
2081-12-10 |
2083-12-09 |
Surya Energy Pvt.Ltd |
Madhyapur Thimi,Bhaktapur |
Respective Switchyard of the project |
Lapan s/s |
Double Ckt |
123 |
Rolwaling Khola HPP 33kV Transmission Line Project |
33 |
8.4 |
22 |
703 |
2081-12-17 |
2083-12-16 |
Upper Tamakoshi Hydropower Limited |
Gyaneswor |
Respective Switchyard of the project |
Upper Tamakoshi HPP switchyard |
Single Ckt |
124 |
Phedi Khola HPP 33kV Transmission Line Project |
33 |
5 |
4.3 |
704 |
2081-12-17 |
2083-12-16 |
Phedi Khola Hydropower Company Ltd |
Tinkune,Kathmandu |
Respective Switchyard of the project |
Upper Irkhuwa HPPswitchyard |
Single Ckt |
125 |
Balephi Khola HPP 132kV Transmission Line Project |
132 |
5 |
40 |
705 |
2082-01-08 |
2084-01-07 |
Balephi Energy Pvt. Limited |
New Baneshwor |
Respective Switchyard of the project |
Pangtan s/s |
Single Ckt |
126 |
Phukot karnali PROR HPP E-Flow 33kV Transmission Line Project |
33 |
6 |
6 |
706 |
2082-01-08 |
2084-01-07 |
Vidhyut Utpadan Company Limited |
Buddhanagar |
E-Flow Dam Toe Powerhouse |
Main Powerhouse |
Double Ckt |
127 |
Lamahi Solar Power Project |
33 |
7 |
10 |
708 |
2082-02-11 |
2084-02-10 |
Prime Power Limited |
Tripureshwor-11,kathmandu |
Respective Switchyard of the project |
Lamahi s/s |
Single Ckt |
128 |
Kaligandaki Gorge HPP 220kV Transmission Line Project |
220 |
1.1 |
180 |
709 |
2082-02-16 |
2084-02-15 |
Kaligandaki Gorge Hydropower Pvt.Ltd |
Charkhaal,Dillibazar |
Respective Switchyard of the project |
Dana s/s |
Double Ckt |
129 |
Rapti Dobhan -Lamahi 33kV Transmission Line Project |
33 |
4 |
30 |
710 |
2082-03-08 |
2084-03-07 |
Lamahi Energy Pvt.Ltd |
Tripureshwor,Kathmandu |
Respective Switchyard of the project |
Lamahi s/s |
Double Ckt |
130 |
Super Tamor HPP 220kV Transmission Line Project |
220 |
6.4 |
166 |
711 |
2082-03-10 |
2084-03-09 |
Crystal Power Development Pvt.Ltd |
Baluwatar,Kathmandu |
Respective Switchyard of the project |
RPGCL_Tamor s/s |
Double Ckt |
131 |
Palpa Solar 132kV Transmission Line Project |
132 |
12 |
50 |
712 |
2082-03-12 |
2084-03-11 |
Gogreen Energy Pvt.Ltd |
Tripureshwor |
Respective Switchyard of the project |
NEA,Sunwal s/s |
Single Ckt |
132 |
Daraundi Nadi HPP 33 kV Transmission Line Project |
33 |
5.24 |
9.84 |
713 |
2082-03-12 |
2084-03-11 |
Mankamana Daraundi Hydropower Company Limited |
Naxal,Kathmandu |
Respective Switchyard of the project |
Markichowk s/s |
Single Ckt |
133 |
Sitalpati Solar Power 33kV Transmission Line Project |
33 |
1 |
10 |
714 |
2082-03-13 |
2084-03-12 |
Himalyan Soalr Power Pvt.Ltd |
Mid Baneshwor,kathmandu |
Respective Switchyard of the project |
Sitalpati s/s |
Single Ckt |
134 |
Yaru Khola PRoR HPP 132 kV Transmission Line Project |
132 |
28.41 |
30.59 |
715 |
2082-03-15 |
2084-03-14 |
Yaru Hydropower Pvt.Ltd. |
Lazimpat,Kathmandu |
Respective Switchyard of the project |
Borang s/s |
Single Ckt |
135 |
Chainpur Seti HPP 220kV Transmission Line Project |
220 |
14.5 |
210 |
716 |
2082-03-17 |
2084-03-16 |
Chainpur Seti Hydropower Company Limited |
Darbarmarg,Kathmandu |
Respective Switchyard of the project |
chainpur hub |
Double Ckt |
136 |
Grid Connected Solar PV Part-1& Part-2,Kapilvastu 33 kV Transmission Line P |
33 |
10 |
20 |
717 |
2082-03-27 |
2084-03-26 |
Positive Energy Pvt.Ltd |
Chanauta,LKapilvastu |
Respective Switchyard of the project |
Chanauta s/s |
Double Ckt;Part-1-10MW & Part-2-10MW |
137 |
Madhya Chameliya HPP 132 kV Transmission Line Project |
132 |
0.05 |
28.304 |
718 |
2082-04-06 |
2084-04-05 |
Darchula Power Limited |
Thapathali,Kathmandu |
Respective Switchyard of the project |
Tower no 27 of Upper Chameliya 132kV TL |
Single Ckt |
138 |
Beldiya Solar Power 33kV Transmission Line Project |
33 |
6 |
10 |
719 |
2082-04-14 |
2084-04-13 |
Kalika Sun Light Power Private Limited |
Baluwatar,Kathmandu |
Respective Switchyard of the project |
Mukundapur s/s |
Double Ckt |
139 |
Phalakhu khola HPP132kV Transmission Line Project |
132 |
11 |
14.7 |
720 |
2082-04-15 |
2084-04-14 |
Betrawati Hydroelectric Company Limited |
Panipokhari,kathmandu |
Switchyard of Project |
Trishuli 3B Hub Station |
Single Ckt |
140 |
Janaki Solar Power 33kV Transmission Line Project |
33 |
12.3 |
5 |
721 |
2082-04-18 |
2084-04-17 |
Kalika Sun Power Private Limited |
Baluwatar,Kathmandu |
Respective Switchyard of the project |
New Nepalgunj s/s |
Single Ckt |
141 |
Dudhkoshi-5 HPP 220kV Transmission Line Project |
220 |
62 |
110 |
722 |
2082-05-05 |
2084-05-04 |
Independent Power Company (Nepal) Pvt.Ltd |
Dhobighat, Lalitpur |
Respective Switchyard of the project |
New Khimti s/s |
Double Ckt |
142 |
Samundratar-Lapsiphedi 132 kV Transmission Line Project |
132 |
31 |
400 |
723 |
2082-05-06 |
2084-05-05 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Samundratar ss/s |
Lapsiphedi s/s |
Double Ckt |
143 |
Dandakhet-Burtibang 132kV Transmission Line Project |
132 |
35 |
250 |
724 |
2082-05-08 |
2084-05-07 |
Nepal Electricity Authority |
Durbar Marg, Kathmandu 01-4153007 |
Dandakhet s/s |
Burtibang s/s |
Double Ckt |
144 |
Sani Bheri HPP 132 kV Transmission Line Project |
132 |
23 |
44.52 |
725 |
2082-05-08 |
2084-05-07 |
Expert Hydro Investment Pvt.Ltd |
Naxal-01,Kathmandu |
Respective Switchyard of the project |
NEA,Baphikot s/s |
Double ckt |